SEE b/ Nee [SE | Nm [cm Now EET Sere
Se lo | ae be we fo BE Le eee Lf eee
[er=sBecconta] “°°” [errzaB eco]
frei frees
. Ten = 26d
SAE econd [8] soeeente | assets Ma stcinde [| sosecnte
Freee ae ce
‘Acme Stamping
Steering Brackets
Current Statepe —————EEE
Future State Drawing
Designing a Lean Flow
+The power behind Value Stream Mapping
is you always need a future state!
1 + 70% & Keep Updating. Use pencil!
drawing + Material & Information flows
{ 4 - Basis for your Work Plan — like a “blueprint”
fi tate
Caratslag + Begin by drawing on Current State
{ + 1st iteration assumes existing steps & equipment
Can move equipment, combine, take out conveyors,
make minor purchases, etc.
P|
Peete sty
( But there is a Problem!Oca
Mass Production
Large Lots, Pushed Ahead, “Island” Mentality e
schedule
Materia schedule 7 S :
| a. E EW —
seu oral
a ==
= fwareneces
Ship
ZI aa Mee ‘Added Time: Minutes
Time in Plant: Weeks
(aa = _ > Cash
Goal: The MORE the FASTER the BETTER
Order
8)Waste
¢ The elements of production that add no value to the product
* Waste only adds cost and time
Things to Remember about Waste
+ Waste is really a symptom rather than a root cause of the problem
+ Waste points to problems within the system (at both process and
value stream levels)
+ We need to find and address causes of wastepr ————EE
What Happens to a Lean Flow...
..if a machine breaks down?
..if a defective part is included with good parts?
2nd Tier
Assembly
Assembly
process
WeldingWhiteboard 41
a FRSSSTON od 114
E) = ES
ae ae s oe ae,
T sepa Fado pa
OOF colo
Woekly Schedule roe - A8Ominies _e5z>p | “12000
(=|
f
&
Pitch =60 50020 ped 20 m8,
i
Eh
\
bu
SP w/o ZN = /x> aE
ais | 2007 | scoot cor
vam jot B08 for oon
Today Dany
[C0 thw [c= tmnt [cr 10 mintes| [co= @
pine = 5 lipsine = 100% psine= 508 pte =O
Te 13 18 Te
Say 76anys 1days 27 days
L_teeceea L_seeconss_[ L_ssseconte _[ L_c2secone f
‘Acme Stamping
Steering Brackets
Current StateWhiteboard 42
=|} "San id 114
Se cong. aaa
+ = tg Street
= od ‘etl
<= ue = [=]
B50 eate T stipe fbAGOpovine
Wooly Schedule 460 minices wiz000
Take = Seay ee.
“60 paces
Tiy= 2p
Pech = 6092220 pode 20 ma, 2
i
Eh
\
bu
Dane
[C0 thw [c= tmnt [cr 10 mintes| [co= @
pire 052 pine = 1008 ptine= 60% pene OE
18 Te rr 19
Samo 76a 18d a1
L_ssecond sonsconds L_Assecone _f Lessons f
‘Acme Stamping
Steering Brackets
Current StateWhiteboard 43
|S aE 114
+<—_ - + see Sateen
ae} Le = {Bz | ‘Assembly
oo T sep feaco pine
Woekly Schedule rote = A80minias Zez>p | “12000
“460 pieces
Tray = 20 pee
Puch = 60 sec x20 ped 20 mn, AL_ 2
i
Eh
\
/ ASSEMBLY AT SHEE
Saye 76auys 18days ay seonme™ Meee
L__tescond_[ L_28ceconis_[ 1_46seconde_f L_e2seconae [
‘Acme Stamping
Steering Brackets
Current StateWhiteboard 44
=) ae aE 1-14
c= een ae
——— + State Street
=| —— i
T= = = 3
Toheme T A ToS
Weekly Schedule oe = A6Onimtes Zar | 12000"
ae "S800 =
bcs Tig =20 pe
Tones
Pitch =60 50020 ped 20 m8,
zi *
i J ES “
STANEN Arche Swe ee Seb 2h a SEBEL op SHIPPING
& zor | ‘geoou t [os
Sam jor iy or
Today
Say 76anys 1days 27 days 2am Cs
L_teeceea L__s2ceconde L_ssseconte _[ L_c2secone f
‘Acme Stamping
Steering Brackets
Current StateWhiteboard 45
ene ‘PRODUCTION aoa 114
=)
ae = {Bz} =
00 Reale T 20 esliny [6400 pean
Weely Schedule rane = AaOmimes_eszr> | “2000S
‘oO eres: “Tay = 20 pecee
Zon
a
shy
* |
Pitch =60 50020 ped 20 m8,
Pr
== feb sae Dio Dn Rap oo
A zor | ‘sgooet ms |.
ome eraap\ |
Sane 76a 18ns 27 dys 2s Adan [arn A
L_sescout_[ es L_sssscone _f L_e2secoue f L_ so seconds _f la
‘Acme Stamping
Steering Brackets
Current StateWhiteboard 46
(tax | 4 eee od 14]
—— ‘State Street
ae MRF Sone
OOF colo
J SN
DS, = 4 area 4 an
2D
_ 480 minaces
8.400 psi
12000
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 47
conte
=
ae
OOF colo
=
!
Gigs | 2007
same [or
[Uptime » 85%
To
2D
_ 480 minaces
State Street
‘Recently
8.400 psi
12000
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 48
conte
a
ae
OOF colo
=
A
Cole
sar [or
WEDD RASS.
2D
_ 480 minaces
State Street
‘Recently
[8 a00 pine
12000
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 49
Bes |__[rnaron aaa 114
as cat vee sig et
ae ae = oe ae,
OOF colo 2D [8 a00 pine
en
—
a= a} £223, pene 4 cas
AS Vor -
2, |i
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 410
Bes |__[rnaron aaa 114
as cat vee sig et
ae ae = oe ae,
OOF colo 2D [8 a00 pine
en
—
a= i} £223, pene 4 cas
200T days
& =
cays jot me
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 411
ea RE id 114
ai pera
OOF colo
=
ar a 4 mara
Ao ae
‘fa, \ 2° 1Bame Sime sot s
ey
=
[tine = 5% Be
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 412
ai conte
Cole Sane
WEDD RASS.
Be
‘Acme Stamping
Steering Brackets
Future StateWhiteboard 4.13
Metiaan
Stealco,
[Day
_—s 1
ak conte
ae
OOF colo
ea
[a
=
a
nm
a
ma
no
ie
2001
Baye [or
[Uptime » 85%
To
Same
‘Acme Stamping
Steering Brackets
Future StateWhiteboord 414
Metiaan
Stealco.
OOF colo
Bane
< Se
To
1S days
2D
ate = 260 mines
“460 pieces
Picch =60 see «20 pe
iS
2days
Saas
sec.
165 sec,
166 seconde
‘Acme Stamping
Steering Brackets
Future State
(Ebook) Stories from my sensei : two decades of lessons learned implementing Toyota-style systems by Hoeft, Steven E ISBN 9781439816547, 1439816549 All Chapters Instant Download