0% found this document useful (0 votes)
47 views

VSM Acme

Uploaded by

La YUYA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
47 views

VSM Acme

Uploaded by

La YUYA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 34
por ———E “ACME Stamping” Data Set Acme Stamping Company produces several components for vehicle assembly plants. This case concerns one product family: a steel instrument-panel bracket subassembly in two types: one each for left-hand and right-hand drive versions of the same automobile model. ‘These components are sent to the State Street Vehicle Assembly Plant (the customer). CUSTOMER REQUIREMENTS: + 18,400 pieces per month 12,000 per month of Type “LH” 6,400 per month of Type “RH” + Customer plant operates on two shifts + Palletized returnable tray packaging with 20 brackets in a tray and up to 10 trays on a pallet. The customer orders in multiples of trays. + One daily shipment to the assembly plant by truck WORK TIME: + 20 days in a month + Two shift operation in all production departments Eight (8) hours every shift, with overtime if necessary + Two 10-minute breaks during each shift Manual processes stop during breaks Unpaid lunch * Whiteboard 1 ys State Street ‘Recently 8.400 psi 12000 26400 Tray = 20 pss ei or Ee “ACME Stamping” Data Set (continued) PRODUCTION PROCESSES: + Acme’s process for this product family involves stamping a metal part followed by welding and subsequent assembly. The components are then staged & shipped to the vehicle assembly plant on a daily basis. + Switching between Type “LH (left-hand drive) and Type “RH” (right-hand drive) brackets requires 1 hour changeover in stamping and 10-minute fixture change in the welding processes. + Steel coils are supplied by Michigan Steel Co. Deliveries are made to Acme on Tuesdays and Thursdays. ACME PRODUCTION CONTROL DEPARTMENT: + Receives State Street's 90/60/30-day forecasts and enters them to MRP + Issues Acme 6-week forecast to Michigan Steel Co. via MRP + Secures coil steel by weekly faxed order release to Michigan St + Receives daily firm order from State Street + Generates MRP-based weekly departmental requirements based upon customer order, WIP inventory levels, F/G inventory levels, and anticipated scrap and downtime + Issues weekly build schedules to Stamping, Welding, and Assembly processes + Issues daily shipping schedule to Shipping Department 1 Co. pa “ACME Stamping” Data Set (continued) PROCESS INFORMATION: All processes occur in the follo v 2) 3) ‘STAMPING (The press makes parts for many Acme products) = Automated 200 Ton press with coil (automatic material feed) ~ Gyole Time: second (60 pieces per minute) = Changeover time: 1 hour (good piece to good piece) 5 days of coils before stam 4,600 pieces of Type “LH” 2,400 pieces of Type “RH” finished stampings ‘SPOT-WELD WORKSTATION | (dedicated to this product family) - Manual process with one operator ~ Cycle Time: 39 seconds = Changeover time: 10 minutes (fixture change) - Reliability: 100% - Observed Inventory: 1,100 pieces of Type “LH” 600 pieces of Type “RH” ‘SPOT-WELD WORKSTATION II (dedicated to this product family) - Manual process with one operator ~ Cycle Time: 46 seconds = Changeover time: 10 minutes (fixture change) + Reliability: 80% - Observed Inventory: 1,600 pieces of Type “LH” 850 pieces of Type “RH” 19 order and each piece goes through all processes. 4) ASSEMBLY WORKSTATION | (dedicated to this product family) + Manual process with one operator = Cycle Time: 62 seconds = Changeover time: none 640 pieces of Type “RH” 5) ASSEMBLY WORKSTATION II (dedicated to this product family) + Manual process with one operator - Cycle Time: 40 seconds = Changeover tit - Observed Inventory 2.700 pieces of Type “LH” 1,440 pieces of Type “RH” 6) SHIPPING DEPARTMENT Removes parts from finished goods warehouse and stages them for truck shipment to customer. Whiteboard 2 114 State Street ‘Recently 8.400 psi 12000 26400 ei Snape = = Pe Whiteboard 3 114 State Street ‘Recently 8.400 psi 12000 26400 ei Snape = = Pe Whiteboard 4 State Street ‘Recently 8.400 psi 12000 26400 Tray = 20 pss Zon ei Snape (mee Teen ee Whiteboard § State Street ‘Recently 8.400 psi 12000 26400 Tray = 20 pss ei ea See SWEDE TSE ASSEN sz eid 200% jor jo" od 1 a} era Nooo [err=39 soca [er=a sans ert = 2 code fer» 4 second (10 thaw [c= 10 ines [c= 10 mines (0-8 fcio= 6 pte = OR pein = 100% pein = 605 ptine 100% tine = 100% 1 19 19 19 T° Whiteboard 6 114 caesar, ny faadopae Seco re = pr ime oy es Coils ant 46001 Sm on sa fo o a | | estas aremee eee erat tte sor eer wanna ec wanna eons ee ara aor oe eareae See ar iene = 3 78 Whiteboard 7 State Street ‘Recently 8.400 psi 12000 26400 Tray = 20 pss Zon Py AFA A & & = ser fond eae fo a a fiewsm:) © focwmms] «= [ete oe a Se or Tene Sania Stceing orcas Current State se \ = A ea A exauE A STA | &
  • SEE b/ Nee [SE | Nm [cm Now EET Sere Se lo | ae be we fo BE Le eee Lf eee [er=sBecconta] “°°” [errzaB eco] frei frees . Ten = 26d SAE econd [8] soeeente | assets Ma stcinde [| sosecnte Freee ae ce ‘Acme Stamping Steering Brackets Current State pe —————EEE Future State Drawing Designing a Lean Flow +The power behind Value Stream Mapping is you always need a future state! 1 + 70% & Keep Updating. Use pencil! drawing + Material & Information flows { 4 - Basis for your Work Plan — like a “blueprint” fi tate Caratslag + Begin by drawing on Current State { + 1st iteration assumes existing steps & equipment Can move equipment, combine, take out conveyors, make minor purchases, etc. P| Peete sty ( But there is a Problem! Oca Mass Production Large Lots, Pushed Ahead, “Island” Mentality e schedule Materia schedule 7 S : | a. E EW — seu oral a == = fwareneces Ship ZI aa Mee ‘Added Time: Minutes Time in Plant: Weeks (aa = _ > Cash Goal: The MORE the FASTER the BETTER Order 8) Waste ¢ The elements of production that add no value to the product * Waste only adds cost and time Things to Remember about Waste + Waste is really a symptom rather than a root cause of the problem + Waste points to problems within the system (at both process and value stream levels) + We need to find and address causes of waste pr ————EE What Happens to a Lean Flow... ..if a machine breaks down? ..if a defective part is included with good parts? 2nd Tier Assembly Assembly process Welding Whiteboard 41 a FRSSSTON od 114 E) = ES ae ae s oe ae, T sepa Fado pa OOF colo Woekly Schedule roe - A8Ominies _e5z>p | “12000 (=| f & Pitch =60 50020 ped 20 m8, i Eh \ bu SP w/o ZN = /x> aE ais | 2007 | scoot cor vam jot B08 for oon Today Dany [C0 thw [c= tmnt [cr 10 mintes| [co= @ pine = 5 lipsine = 100% psine= 508 pte =O Te 13 18 Te Say 76anys 1days 27 days L_teeceea L_seeconss_[ L_ssseconte _[ L_c2secone f ‘Acme Stamping Steering Brackets Current State Whiteboard 42 =|} "San id 114 Se cong. aaa + = tg Street = od ‘etl <= ue = [=] B50 eate T stipe fbAGOpovine Wooly Schedule 460 minices wiz000 Take = Seay ee. “60 paces Tiy= 2p Pech = 6092220 pode 20 ma, 2 i Eh \ bu Dane [C0 thw [c= tmnt [cr 10 mintes| [co= @ pire 052 pine = 1008 ptine= 60% pene OE 18 Te rr 19 Samo 76a 18d a1 L_ssecond sonsconds L_Assecone _f Lessons f ‘Acme Stamping Steering Brackets Current State Whiteboard 43 |S aE 114 +<—_ - + see Sateen ae} Le = {Bz | ‘Assembly oo T sep feaco pine Woekly Schedule rote = A80minias Zez>p | “12000 “460 pieces Tray = 20 pee Puch = 60 sec x20 ped 20 mn, AL_ 2 i Eh \ / ASSEMBLY AT SHEE Saye 76auys 18days ay seonme™ Meee L__tescond_[ L_28ceconis_[ 1_46seconde_f L_e2seconae [ ‘Acme Stamping Steering Brackets Current State Whiteboard 44 =) ae aE 1-14 c= een ae ——— + State Street =| —— i T= = = 3 Toheme T A ToS Weekly Schedule oe = A6Onimtes Zar | 12000" ae "S800 = bcs Tig =20 pe Tones Pitch =60 50020 ped 20 m8, zi * i J ES “ STANEN Arche Swe ee Seb 2h a SEBEL op SHIPPING & zor | ‘geoou t [os Sam jor iy or Today Say 76anys 1days 27 days 2am Cs L_teeceea L__s2ceconde L_ssseconte _[ L_c2secone f ‘Acme Stamping Steering Brackets Current State Whiteboard 45 ene ‘PRODUCTION aoa 114 =) ae = {Bz} = 00 Reale T 20 esliny [6400 pean Weely Schedule rane = AaOmimes_eszr> | “2000S ‘oO eres: “Tay = 20 pecee Zon a shy * | Pitch =60 50020 ped 20 m8, Pr == feb sae Dio Dn Rap oo A zor | ‘sgooet ms |. ome eraap\ | Sane 76a 18ns 27 dys 2s Adan [arn A L_sescout_[ es L_sssscone _f L_e2secoue f L_ so seconds _f la ‘Acme Stamping Steering Brackets Current State Whiteboard 46 (tax | 4 eee od 14] —— ‘State Street ae MRF Sone OOF colo J SN DS, = 4 area 4 an 2D _ 480 minaces 8.400 psi 12000 ‘Acme Stamping Steering Brackets Future State Whiteboard 47 conte = ae OOF colo = ! Gigs | 2007 same [or [Uptime » 85% To 2D _ 480 minaces State Street ‘Recently 8.400 psi 12000 ‘Acme Stamping Steering Brackets Future State Whiteboard 48 conte a ae OOF colo = A Cole sar [or WEDD RASS. 2D _ 480 minaces State Street ‘Recently [8 a00 pine 12000 ‘Acme Stamping Steering Brackets Future State Whiteboard 49 Bes |__[rnaron aaa 114 as cat vee sig et ae ae = oe ae, OOF colo 2D [8 a00 pine en — a= a} £223, pene 4 cas AS Vor - 2, |i ‘Acme Stamping Steering Brackets Future State Whiteboard 410 Bes |__[rnaron aaa 114 as cat vee sig et ae ae = oe ae, OOF colo 2D [8 a00 pine en — a= i} £223, pene 4 cas 200T days & = cays jot me ‘Acme Stamping Steering Brackets Future State Whiteboard 411 ea RE id 114 ai pera OOF colo = ar a 4 mara Ao ae ‘fa, \ 2° 1Bame Sime sot s ey = [tine = 5% Be ‘Acme Stamping Steering Brackets Future State Whiteboard 412 ai conte Cole Sane WEDD RASS. Be ‘Acme Stamping Steering Brackets Future State Whiteboard 4.13 Metiaan Stealco, [Day _—s 1 ak conte ae OOF colo ea [a = a nm a ma no ie 2001 Baye [or [Uptime » 85% To Same ‘Acme Stamping Steering Brackets Future State Whiteboord 414 Metiaan Stealco. OOF colo Bane < Se To 1S days 2D ate = 260 mines “460 pieces Picch =60 see «20 pe iS 2days Saas sec. 165 sec, 166 seconde ‘Acme Stamping Steering Brackets Future State
  • You might also like