Mezzanine Floor Guide
Mezzanine Floor Guide
At Hawkins we aim to provide as much information as possible to our clients so that they can make
informed decisions and choose the best solution to their needs.
Building Regulations
Who will take responsibility for obtaining Building Regulations?
Mezzanine floors require building regulation approval. Please let us know if you need us to make the
application on your behalf. We would provide engineering drawings, calculations, specifications to your
local council or approved inspector. It may be necessary for you to provide a floor slab details and a plan of
your building showing all external fire exits.
If you are in any doubt about your requirements please contact our very experienced mezzanine floor sales
team for assistance.
Floor Coverings
Our indoor mezz floors are supplied with 38mm thick
high density flooring grade chipboard. External mezzanine
platforms have galvanised steel chequer plate or galvanised
steel open mesh flooring to prevent rotting and rusting
caused by the weather.
Part M staircase is a minimum of 1200mm wide with enclosed treads and a mid landing after 12 risers. Part
M staircases are needed for office, production or retail floors.
Fire Rating
One hour fire rating will need to be required to the underside of your mezzanine floor under building
regulations ONLY if your mezzanine floor meets any of the following criteria:
Fire cladding a floor to one hour is usually done by fitting a suspended ceiling to the underside of the
mezzanine with column cases on the upright posts and a fascia to all open edges.
Suspended Ceiling - This can be with an exposed metal grid with drop in ceiling tiles or with a concealed
grid with two layers of plasterboard secured into it giving a smooth ceiling. Please note that only a few
ceiling tiles have been specifically tested to be one hour rated for a mezzanine floor. Any lights fitted within
the ceiling void would also have to be rated to one hour.
Fascia - This is fitted around all exposed edges of the mezzanine and is constructed of metal stud supporting
two layers of plasterboard
Column cases - These are manufactured to the right size and length of the column from 12 mm Promalit
or equivalent with a metal outer layer. They come in galvanised or white finish as standard. Alternatively,
columns can be fireclad by building a stud frame around the column and fixing two layers of plasterboard
around them.
A protected route - will be required to all floors apart from a storage floor (although storage floors of a
certain size may also need a protected route). This is a one hour partition around a staircase at ground and
first floor level together with 1/2 hour rated (FD30) doors above and below.
Other considerations
Landlords
Your landlord will need to be informed and we will need to receive written approval from them. We will
happily supply drawings for their approval.
Bespoke Design
Hawkins can design any span between columns that you may require, if you need to span machinery or
want to keep a showroom free.
Foundations
For quotation purposes we make an assumption as to the slab - being 200mm concrete and 200mm
hardcore beneath. Our calculations are based around this slab transferring the load down onto the ground
beneath. Our assumption is that the ground can take 1 tonne per square metre. This ground bearing
pressure can be affected if you are close to water or in a mining area or on reclaimed land. We can provide
structural calculations to ensure your floor slab is adequate.
Noise
Sound is transferred through walls - airborne sound - and through the floor - impact sound. It is normally
measured as a decibel rating (dB). We can insulate your office to help with the transfer of sound between
areas. By incorporating different types of plasterboard and adding more insulation we can give you a quiet
environment to work in.
To give you an indication of the kind of transfer of airborne noise, please refer to the table below:
Note that the incorporation of windows and doors into your wall will decrease the sound insulation
considerably. We can provide acoustic rated glass to alleviate this.
Please note
This document should be treated as an aid to highlight some of the key considerations you need to think about when designing
your mezzanine floor. You should seek professional advice before building your new mezzanine and Hawkins Steel Ltd take on no
responsibility or liability for any errors or omissions in this document or subsequent costs incurred.
Through the design process Hawkins Steel Ltd will make sure that the specification for the intended use of your new mezzanine
will comply with the current Building Regulations requirements at the time and we treat all projects in isolation.