Court Building Construction Proposal
Court Building Construction Proposal
JUDICIARY OF TANZANIA
BILLS OF QUANTITIES
Prepared and Submitted By:
In Association with:
DECEMBER, 2023
BILL NR. 1-PRELIMINARIES
ITEM DESCRIPTION AMOUNT (TZS)
STANDARD PHRASEOLOGY
A Note:- These Bills of Quantities have been prepared using a standard phraseology and the contractor's
attention is drawn to the preambles to sections in these Bills of Quantities
Quantities
B Notwithstanding the provisions of EASMM Clause A6 (c) fractions of a unit less than half, which
would cause an entire item to be eliminated have been regarded as whole units.
DEFINITIONS/ABBREVIATIONS
Definitions
C Words importing the singular only also include the plural and vice versa where the context requires
D The term "the works" shall mean the whole of the works envisaged by the contract, including, unless
expressly stated otherwise, the works of nominated sub-contractors, nominated suppliers, local
authorities and public undertakings whether or not the works of the latter are represented by prime cost
sums.
E The term "instructions", and words derived there from, shall mean written instructions issued by the
Architect unless otherwise described.
F The term "approval" and words derived there from, shall mean written approval issued by the Architect
unless otherwise described.
DEFINITIONS/ABBREVIATIONS
Definitions
G The term "manufacturer's recommendations" shall mean all printed or written recommendations or
instructions issued by a manufacturer and current at the tender date.
H The term "or other equal and approval" shall mean the standard required and that materials or goods of
equal written approval of the Project Manager/ Architect.
J The terms "approval", approved", "to approval", "as directed" and the like, refer always to approval or
directions given by the Architect. Approval will not be valid unless given in writing. When the
contractor seek approval for work which cannot proceed without the Project mArchitect's selection or
inspection (e.g.) performance tests; work of aesthetic importance) he shall give two weeks notice in
order that arrangements approval, such approvals will be limited to the visual appearance of the work
involved and are not in any case particularly in relation to the kind and standards of materials, goods
and work.
Abbreviations
K The following abbreviations are used:-
L BS British Standard current at tender date
M BSCP British Standard Code of Practice current at tender date
N SMM East African Standard Method of Measurement of Building Works (with Quantities) First
Edition
P M Meter (s)
Q MM Millimetre (s)
T T Tonne (s)
U KG Kilogramme (s)
V N Newton (s)
TO COLLECTION
Page No. 1/1
1/3
ITEM DESCRIPTION AMOUNT (TZS)
General attendance
A In addition to the facilities referred to in Smm Clause B19(b) all items of general attendance include
arranging with nominated sub-contractors and nominated suppliers as to time for submission of
drawings for the Architect's approval, commencement of their work on the site or manufacture and
delivery of their goods and materials as appropriate, obtaining from them particulars of holes, mortices,
chases, recesses, fixings and the like and supplying them with all dimensions and other information for
the proper execution of the works.
B The contractor shall be responsible for the procurement and/or preparation of all detailed setting out
and shop drawings sufficient to achieve proper co-ordination of the works
C As part of his obligations responsible under this contract and the various sub-contracts the contractor
will be ultimately sub-contractor's and nominated suppliers' activities and to ensure that they are aware
of the requirements of his programme in so far as work on site and the issue of information is
concerned.
PRELIMINARY PARTICULARS:
Name
Location
3. Associated Building Engineering Services installations that is, Electrical, Plumbing, Air
Conditioning and Fire Fighting
4. Other works include associated External works; Hard Landscaping, repair of existing Gate
House, boundary wall and Askari Hut.
Size of Building
L In this connection the contractor is to submit with his tender a programme showing how he proposes to
carry out the work including a method statement and details of plant he intends to employ during the
execution of the contract.
TO COLLECTION
Page No. 1/2
1/4
ITEM DESCRIPTION AMOUNT (TZS)
Employer
A The Employer is
Architects are:
B OGM CONSULTANTS P.O. Box 32428, DAR ES SALAAM
F Before pricing the Bills of Quantities the contractor must satisfy himself in detail as to the character of
the operations and in particular in respect of the type of structure to be erected, the design of
reinforcement, the nature of temporary works required and where necessary the standard of finish
required for exposed concrete surfaces.
G The Contractor will be deemed to have visited the site and to have satisfied himself as to the nature,
extent and character of the works, local conditions, accessibility of the works, the supply of and
conditions affecting labour and materials and any other matter which may affect his tender.
H Visits to the site shall be by appointment only and tenderer are to contact the Architect to make the
necessary arrangements.
Tender Documents
K The Contractor is requested to check the documents and the number of each page if any are missing or
duplicated or if any writing or figures are indistinct, to notify at once the Quantity Surveyor. No
subsequent claim for loss consequently upon the Contractor's failure to comply with this clause will be
entertained.
L No alteration, addition or qualifying note is to be made by the Contractor in the text of the Bills of
Quantities. Should any alteration, addition or note be made such will not be recognized and the text of
the Bills as printed will be strictly adhered to
M If there is any matter upon which the Contractor requires further information or clarification he is to
contact the employer in good time in order that all tenderers may be given such additional information
as is available.
N Note:- The Contractor is to submit at the time of delivering his tender, as per the Instructions to
Tenders
P No claims arising from any neglect on the part of the Contractor in these matters will be entertained.
Q The drawings enclosed with the tender documents are for the Contractor's convenience in tendering and
are not intended as a substitute for a thorough inspection of the remaining drawings at the Architect's
and Structural Engineer's offices by appointment as previously described.
TO COLLECTION
Page No. 1/3
1/5
ITEM DESCRIPTION AMOUNT (TZS)
Contractor's Scrutiny
A The Contractor is to compare the drawings including the drawings of sub-contractors, the specification
and/or Bills of Quantities before the work is up in hand or materials ordered and he shall report any
discrepancies to the Architect in good time.
B If the Contractor or any of his sub-contractors (whether nominated or otherwise) has reason to question
the application of any details or materials described In the specification and/or Bills of Quantities or
shown on the drawings he will inform the Architect two weeks before construction so that she shall be
further considered.
C The Contractor will be required to provide, for purpose of contract administration, a detailed break-
down of his pricing of this section of the Bills of Quantities during submission of his tender and this
will for basis for the award of contract.
D This detailed break-down, which shall be submitted with the priced Bills of Quantities, shall indicate
clearly the initial cost and running cost of each item of the preliminaries.
E Costs relating to items which are not priced will be deemed to have been included elsewhere in these
Bills of Quantities
Bills of Quantities
All work included in these Bills of Quantities have been measured accurately except where an item has
been described as "provisional" The tenderer is to note that firm quantities will not be subject to
adjustment if remeasurement of a bill item will result in less than or equal to plus or minus 1% of the
F bill quantity.
Risk of injury, injury to person and property and of damage to the works
G The contractor must provide for the efficient protection of the general Public and the occupants and
users of the surrounding buildings during the progress of the works included in or to be done in
connection with this contract and the Contractor shall, for this purpose guard and protect his plant, tools
and materials and take all necessary measure in order to prevent mishaps and accidents
Insurances
H The Contractor is to allow in his tender for effecting insurance under and in accordance with the GCC
Clause 16 of the PPRA Conditions of contract
J All the foregoing insurances are to be with a reputable, local and an approved insurance company
Access to site
K The Contractor's attention is directed to the congested and confined area in which the site is situated
and he must ascertain from the police and the local authority vehicles and any restricted times or places
for unloading, etc.
L The Contractor in tendering will be deemed to have taken account of these matters and any additional
costs in purchasing materials in small quantities, special deliveries etc.
M At commencement of the contract the contractor will be given possession of the complete site
TO COLLECTION
Page No. 1/4
1/6
ITEM DESCRIPTION AMOUNT (TZS)
Use of Site
A The Contractor shall use the site for the execution of the works embraced in the contract including
storage of materials and plant necessary in the carrying out of the same. In no way will the contractor
be permitted to use the site for the preparation of and storage of materials for use other than on this
Contract.
Schedule of Condition
B The Contractor, Prior to commencement of work on site, shall in conjunction with theProject manager
/Architect, adjoining owners and relevant authorities prepare and agree a "schedule of Condition" of
roads, paths, manholes, drains, etc., which are adjacent to the site. at completion of the works, but prior
to formal hand-over, this schedule shall be checked and any work found to be damaged due to the
Contractor's building operations shall be made good at the Contractor's expense.
C The Contractor shall also, prior to commencement of work on site, prepare and agree with the Architect
a grid of existing site levels
D The Contractor is to take all reasonable precautions to prevent workmen, including those employed by
sub-contractors, from trespassing on adjoining owner's property.
Overtime
E Where and when it is found necessary to work overtime in order to maintain progress or for other
reasons the Architect's sanction in writing must first be obtained and any such sanction will only be
granted on the understanding that such overtime will not entail the Employer in any payment thereby
additional to the Contract sum unless the Architect shall otherwise direct.
F In cases where the Project Manager/Architect shall direct that the Contractor is to be paid the additional
cost of overtime working which he may have sanctioned in writing, the additional cost concerned shall
be limited to the net cost of overtime working payable to the operatives involved, plus an addition for
overheads but subject to no other addition of any kind as the Architect may consider for this purpose:-
G (1) "Additional cost" shall mean the "non-productive element" of payments made to workpeople in
accordance with the working rules of the relevant wage -fixing body for overtime working in excess of
that allowed for by the contractor in the calculation of the contract sum; and
H (2) "Overhead" shall mean additional direct costs necessarily incurred by the contractor as a direct
result of such additional temporary lighting, extend hours for canteen facilities, direct supervision and
the like but shall exclude head or regional office costs or charges
J In this connection the contractors will be deemed to have made allowance in his tender for any
overtime he considers necessary to complete the works by the agreed date
K The use of materials found on site shall be prohibited except for those specifically described as to be re-
used and excavated material, which are suitable may be used for making up levels, etc. Should the
Contractor discover materials on site he feels can be re-used as filling media he must obtain the
Architect's written approval to their use prior to proceeding with incorporating them in the works.
Disposal of Materials
L Unless otherwise described all materials found on site shall be removed from site to a pit provided by
the Contractor
TO COLLECTION
Page No. 1/5
1/7
ITEM DESCRIPTION AMOUNT (TZS)
Hoardings
A The Contractor is to construct and maintain, a strong temporary fence as necessary during the execution
of the works and remove after completion of this contract.
B The Contractor is to provide all necessary additional access doors and gates complete with proper locks
and fastenings and maintain, alter and adapt as necessary during the carrying out of the works.
C The Contractor is to erect a display board indicating the name of the registered project and the names of
the various firms and persons engaged on the works. The dimensions, design and construction of the
same are to be to the satisfaction of the Architect
D Allow for the associated cost for the registration of the project ;registration of all firms engaged in the
projects.
E During the course of the contract the Employer or his agents reserve the right to instruct the contractor
to erect, "To Let", and other sign boards in suitable positions on the building and the contractor must
allow for in his tender.
F These sign boards are not to be obstructed or removed by the contractor without the consent of the
Employer or his agent. When removed with authority, they are to be carefully stored until handed over.
G The Contractor will be responsible for any damage or loss in respect of these sign boards from the time
they are erected on the site until they are handed over to the Employer or to his agents
Advertising Rights
H All rights in advertising in connection with this contract are strictly reserved to the Employer and the
contactor is expressly forbidden to advertise or to permit to be advertised.
J No information concerning this contract may be released to the press or to any other party or person
without the prior consent of the Employer to whom the proposed press hand-out or other information
shall be submitted in each case for approval
K The Contractor is to take all reasonable measures to ascertain the location of all existing services
including liaising with local authorities, public undertakings, the Employer's representative and any
other persons having knowledge of the site to avoid damage to any existing services
L The Contractor shall be responsible for protecting, upholding and maintaining all existing services
during progress of the works and for giving all necessary notices to the statutory authorities and he is to
make good any damage due to any cause within his control at his own expense or pay any costs and
charges in connection therewith
M The Contractor will be required prior to commencement of the works to prepare a fully detailed
programme and progress chart covering the whole of the work. The draft chart is to be submitted to the
Architect for comment and after revision, if necessary, one copy is to be kept on the site and four copies
supplied for the use of the Architect and other consultants. On this chart the contractor is to indicate the
latest dates for receipt of information from the design team in connection with both the general work
and work to be executed by nominated sub-contractors and suppliers. At any time during the progress
of the works the Contractor shall allow at least seven days for receipt of information or clarification of
queries. Such days shall exclude Saturdays, Sundays and Public [Link] to the relevant special
condition of contract of the contract.
TO COLLECTION
Page No. 1/6
1/8
ITEM DESCRIPTION AMOUNT (TZS)
A Progress of work executed on site shall be indicated weekly on the Contractor's copy of the chart and
this information will be available for transfer by the Architect's representative to other copies of the
chart
B When for any reason the contract falls substantially behind programme or the sequence of the
operations is materially altered the contractor shall, if so requested by the Project Manager/Architect,
prepare a revised programme in the manner described above taking into account the current situation.
Contractor shall provide temporary accommodation and facilities for use by the Resident
Engineer/Clerk of works to the following standards:-
1. Workable Floor spaces: 12- 16 square metres minimum
2. Furniture: Tables, Six chairs and One lockup desks.
3. Equipment: Work-top plan chest, filling cabinets, drawing board
and tee square
4. Lighting
5. Protective clothing and survey equipment
6. Male and female latrine accommodation separate from general site
latrine accommodation hereinafter described.
D In addition the Contractor shall provide for the said office all necessary electric light, daily cleaning
and proper attendance and take down and clear away on completion or when no longer required and
make good all work disturbed.
E The Contractor is also to provide for the sole use of the Engineer or his representative, for the duration
of the contract, a modern theodolite, level and staff in good condition and proper working order.
F The Contractor shall also provide the full time services of a competent foreman to act under the
directions of the Engineer or his representative. Protective clothing and boots for the sole use of the
Engineer and visiting staff shall also be made available
G The Contractor shall be responsible for cleaning, maintaining and protecting such instruments and
clothing as may be necessary during the carrying out of the contract
H The Contractor shall also provide accommodation either as part of his general site establishment or a
separate accommodation space for holding site meetings chaired by the Architect generally or by the
Contractor in respect of co-ordination meetings with sub-contractors. Such accommodation is to be
sufficient to accommodate Contractor's organisation and sub-contractors as required.
K The Contractor shall survey the reinforced concrete structure floor by floor immediately after the
completion of each section of the work. The survey (to be given to the Projeact Manager/Architect
without delay before superincumbent work is constructed) shall record on a drawing the position,
levels, dimensions and alignments of all parts of the structure and shall show clearly any divergence
from the specified tolerances
L The Contractor is to make his own arrangements with adjoining owners regarding access to their
premises where this is convenient or necessary for executing the works
M Except as provided in the Contract conditions, the Contractor shall be held responsible for any damage
to third party premises resulting from the works and shall make good such damage at his own expense
to the reasonable satisfaction of the Architect and the owners or occupiers thereof or their authorized
representatives
TO COLLECTION
Page No. 1/7
1/9
ITEM DESCRIPTION AMOUNT (TZS)
A The whole of the materials and workmanship are to be as described in these Bills of Quantities, the best
of their respective kinds and all articles and materials unless otherwise described are to be of a standard
or quality not less than those contained in the latest relevant standard.
B Standards of workmanship are to be not less than those contained in the Codes of Practice where such
are applicable to the works
C Standard of workmanship are to be not less than those contained in the Codes of Practice where such
are applicable to the Works
D Samples of materials as may be required shall be furnished to the Project Manager/Architect by the
Contractor without delay. The samples approved will be retained by the Project Manager/Architect
who will be at liberty to reject all materials and workmanship not corresponding with the approved
sample. All samples not forming part of the finished works shall be removed on completion of the
works or when no longer required.
E The Contractor will forthwith remove all materials and workmanship rejected by the Project
Manager/Architect in writing within such time as may be specified and replace them with others of
such better quality as shall be satisfactory to the Architect and shall be approved by him
F In case the Contractor shall neglect or refuse to comply with the foregoing conditions, the Project
manager/Architect or his representative may on behalf of the Employer remove such materials and
workmanship or any part thereof and replace the same with such other materials and workmanship as
shall be satisfactory to him
G The Employer will deduct all expenses thereby incurred or for which the Employer may be liable, from
the amount of any money which may be or become due to the Contractor or may recover the same by
action at law or otherwise from the Contractor as the Employer may determine
H All crates, packing cases and casings of all kinds containing goods delivered to the site and included in
this contract, including goods supplied by nominated suppliers are, where required to be returned, shall
be carefully preserved and properly nailed down and the contractor is to allow in his prices for re-
addressing and returning them to the senders. He will be responsible for any loss or damage claimed
Testing materials
J The Contractor is to provide all samples of materials for testing and is to allow for delivery to the
nominated testing authority
K If the results of any tests are unsatisfactory the cost of the testing and any resulting reconstruction
which may be ordered by the Architect is to be borne by the contractor
L Note:- A provisional sum for laboratory charges for testing materials has been included in the
"Provisional and Prime Cost Sums" section of these Bills of Quantities
Temporary Works
M In certain cases described herein, the contractor's proposals for temporary works may be required to be
submitted to the Architect or Structural Engineer for prior approval
N Such approval, where given, will relate only to the general principles and methods proposed and in
every case of the Contractor shall remain entirely responsible for the detailed design and adequacy of
all temporary works required for completion of the Contract
P Where a suggested method of effecting temporary works has been described in the Bills of Quantities,
and/or is indicated on the drawings, the Contractor may adopt some alternative method subject to the
prior approval of the Architect or Engineer as described above, but in any case the Contractor will be
held entirely responsible for the detailed design and adequacy of whatever method he adopts
TO COLLECTION
Page No. 1/8
1/10
ITEM DESCRIPTION AMOUNT (TZS)
Site Meetings
A The Contractor shall attend site meetings to be arranged by the Architect at regular intervals. The
purpose of these meetings, to be held under the administration of the Architect is to review progress
and clarify any matters arising to maintain the regular progress of the works
B At each site meeting the Contractor shall present a written report which clearly notes the progress
planned and actually achieved since the last site meeting, outstanding information required and weather
reports for the period since the last site meeting stating the effects, if any, on progress of the works
Co-ordination Meetings
C The Contractor shall be responsible for holding co-ordination meetings with all sub-contractors
engaged on this project
D The purpose of the co-ordination meetings, to be held under the administration of the Main Contractor,
is to clarify matters etc., and to arrange wit other trades routes of services and position of equipment
and to ensure that all services are installed in the correct sequence.
Progress photographs
E The Contractor will be required to enter into a Bond with one surety being a reputable local bank
acceptable to the employer or guarantee society or insurance company for an amount equal to 10% of
the contract sum, for the due and proper observance of the terms and stipulations of the Contract and
pay the necessary stamp duties. In the event of the surety approved by the Employer dying or
permanently leaving the country, or becoming bankrupt or insolvent or compounding with his or their
creditors, the Contractor shall and will forthwith upon being required by the Employer to do so, obtain
a joint security or security as the case may be, and obtain a new Bond for the due and proper
observance of the terms of the Contract
F The Contractor may alternatively make a cash deposit of 10% of the contract sum with the Employer
Certificates
G Payments in respect of fluctuations in prices of materials and rates of wages for contracts allowing
price adjustments may be included in certificates; as per the relevant clause in the conditions of
contract.
H Every application for a certificate by the contractor must be accompanied by a detailed priced statement
setting forth the particulars of the works executed to date together with a list of materials on site
J Prior to the issue of any certificate pursuant to the GCC Clause 44 of the PPRA Conditions of contract,
in which is included the value of materials or goods not incorporated into the works, the contractor
shall provide to the Project Manager/Architect and the Quantity Surveyor a description and
documentary evidence of the measures employed to ensure that the Contractor has the right to pass
ownership of the said materials or goods to the Employer and that no contract of sale for the said
materials or goods contains any clause maintaining reservation of title to the supplier or vendor. The
contractor is further required to indemnify and will be deemed to have indemnified the Employer
against any loss or claim in respect of the said materials for which he has requested payment and the
value of which has been included in any party or of a supplier implementing a retention as a result of
K The Contractor's attention is drawn to to the fact that NO provision is made for the certification of the
value of materials stored off-site. In the event that the Project Manager/Architect should decide to
exercise his discretion in this respect however, it will be necessary for the Contractor first to show that
the sub-contract or contract of sale concerned contains the express show/proof
L Should this course be adopted, it may become necessary for the Quantity Surveyor to carry out a
quantity and documentation check. Unless such payments have been specifically requested in writting
by the Employer.
TO COLLECTION
Page No. 1/9
1/11
ITEM DESCRIPTION AMOUNT (TZS)
Price Adjustment/Fluctuations
A In the event of Tenders being accepted as described herein claims for adjustment of the Contract Sum
for labour and materials cost variations in accordance with Clause 49 of the PPRA conditions.
Measurement of Variations
B Measurement of variations will be carried out by the Quantity Surveyor who will give to the contractor
an opportunity of being present. Completed measurements will be handed to the Contractor
periodically for his check and queries, and sections of priced variation will similarly be handed to him
at a later stage
C Measurement of the works, executed in accordance with drawings and instructions of the Projet
Manager/Architect/Engineer, will normally be carried out by the Quantity Surveyor who will give the
Contractor an opportunity of being present. Completed measurements will be handed to the contractor
periodically for his check and queries and priced sections will similarly be handed to him at a later
D Upon the request of the Quantity Surveyor the Contractor will furnish him with all invoices, receipts
accounts and other vouchers that may be required in connection with the contract
E Prior to the issue of a certificate the Contractor shall, if requested, produce for the Quantity Surveyor's
inspection all receipted accounts relating to prime cost items and provisional sums and receipts for
charges paid by the Contractor
Wages Books
H The Contractor will keep proper wages books and time sheets showing the wages paid to and time
worked by the workpeople in his employ or in connection with the execution of the Contract and such
wages books and time sheets will be produced whenever required for verification
Labour Returns
J The Contractor shall prepare for the Architect a daily distribution return showing the number and
description of workpeople employed on the works including those employed by nominated sub-
contractors. The returns are to be forwarded at the end of each week to the Architect
Dayworks
K Should it be found that work ordered by the Project Manager/Architect cannot properly be measured
according to rules of EASMM and valued at bills of quantities rate, or at rates analogous thereto the
contractor may be allowed daywork rates for such work on the instruction by the Architect prior to.
L Where the Contractor intends to record authorized variation work on daywork vouchers the Project
Manager/Architect is to be informed before such work commences. The daywork sheets in connection
therewith must be priced and submitted to the Project Manager/Architect or his authorized
representative for verification by not later than the end of the week following that in which the work
has been executed dayworks.
M For time and materials (except provisional and prime cost sums) the rates will be the standard rates
included in Bills of Quantities with the additions for on cost as specified by the Contractor
N The individual rates for plant shall be as quoted in the Bills of Quantities
Drawings, etc.
P The Contractor is to allow for the cost of any copies of drawings, specifications, etc., which he may
require in excess of those provided without charge under conditions of contract.
Q All drawings, tracings, prints and writings, except letters, are to be considered the property of the
Architect and they are to be returned to him on completion of the works.
TO COLLECTION
Page No. 1/10
1/12
ITEM DESCRIPTION AMOUNT (TZS)
A The Contractor shall provide for attendance on and by all trades as may be required to complete the
whole of the works
As Built Drawings
At practical completion of the works the contractor is to prepare and submit to the Project Manager 3
copies of ''As Built Drawings'' ( 1 original and 2 photocopies) in A3 paper size and in PDF format (Soft
copy Drawings saved in USB Flash Drive) of all building works and operational & maintenance
manuals (together with certificates confirming that the installations have been TESTED and conform to
the specification and requirements of the statutory authorities concerned) - 3Nos hard copies- A2 size
B
paper (soft and hard) as listed below;
Architectural Drawings
Structural Drawings
Services Installation Drawings (Plumbing, Firefighting, Air Conditioning, Lift, Electrical, ICT and
Security installations
C The Certificate of practical completion of the works will not be issued until the contractor has complied
with the foregoing requirements.
D Note:- The Contractor may obtain copy of negatives of the working drawings from the Project
Manager for the purpose of preparing record drawings
E When required all sub-contractors and suppliers shall provide in duplicate information and operating
and maintenance guidance about the materials or goods included within the works and where necessary
record drawings for insertion in the relevant parts of the diary and shall be responsible for the accuracy
of such information, guidance and drawings
Handing Over
F Six weeks before any section of the work will be ready for handing over the contractor shall inform the
Project Manager/Architect of the fact in writing
G Tenders for specialist services to be executed by nominated sub-contractors for which prime cost sums
are included in these Bills of Quantities will normally be invited by the Project Manager/Architect from
specialist firms and the Contractor will, be instructed to enter into sub-contracts with the selected
tenderers.
H The Contractor will be responsible for the supervision and administration of all sub-contracts in
accordance with the conditions including those applicable to the work of statutory undertakings
whether carried out without charge or not and will be responsible for the organization and progression
of all such work.
J The contractor must bear the additional costs to the sub-contract tender which he has been instructed to
accept for any revisions to the sub-contractor's agreed programme which he requires for his own
convenience
K The contractor is to add to all prime cost sums for work to be executed by nominated sub-contractors
for general attendance as may be specifically required; he shall also include a profit margin on all
nominated subcontractors works.
L General attendance on nominated sub-contractors and statutory undertaking engineers shall include for
the following:-
TO COLLECTION
Page No. 1/11
1/13
ITEM DESCRIPTION AMOUNT (TZS)
B Use of standing scaffolding, which shall be left in position until no longer required and also altered and
adapted to suit the reasonable requirements of the nominated sub-contractors, etc.
E Providing office accommodation, lockable store and space for storage of plant and materials. The
contractor will also be required to provide security to properties of all nominated sub contractors
including statutory undertakings; should there be any theft due to breakage of said lockable stores, the
contractor shall replace at his own cost all articles lost.
J Other attendance on nominated sub-contractors, etc., as defined in the Standard method of measurement
of building works has been given where appropriate following each individual prime cost sum
K Note:- Where electric power is required the contractor is to allow for providing this supply to all floor
levels and to positions convenient to nominated sub-contractors' work and shall include for all
necessary leads, fittings, etc., and pay all necessary charges
Nominated suppliers
L All articles to be supplied by nominated suppliers for which prime cost sums are included in these Bills
of Quantities and which the contractor has to fix or place in position or hand to sub-contractor for
fixing will be delivered to the site unless otherwise described
M All goods and fittings delivered to the site are to be received into the charge of the Contractor who must
satisfy himself that they are sound, correct and in good order and he will be required to replace at his
own cost all articles lost or found to be damaged on completion
N The Contractor must bear the additional costs to the supplier's tender which he has been instructed to
accept for any revisions to the supplier's agreed programme which he required for his own convenience
P The Contractor is to add to all prime cost sums for articles to be supplied by nominated suppliers for
profit
Q The prices for fixing only (or placing in position or handing to sub-contractors) articles supplied by
nominated suppliers, or otherwise supplied to the contractor, are to include for receiving the articles
unloading, getting in, sorting, hoisting, distributing, assembling and fixing only, etc., as described in the
particular item and for casing up and projecting as required.
R The Contractor is to note that in statutory undertaking engineers will require access to the building
during the progress of the works for the purpose of installing their mains, equipment, etc.
TO COLLECTION
Page No. 1/12
1/14
ITEM DESCRIPTION AMOUNT (TZS)
A The Contractor is to add for profit and general attendance as previously defined under the heading
"Attendance upon sub-contractors"
B Prime cost sums for work to be executed or charges to be made by local and statutory authorities will in
all cases be net and all cash discount for the contractor excluded therefrom
C TheProject Manager/ Architect reserves the right of use the site or the building or any portion thereof
for the execution of any work or storage of materials not included in this contract which he may decide
to be carried out by other persons
D The Contractor is to allow all reasonable access and facilities for the execution of such works but is not
required to provide any plant or materials except by special arrangement and will hand over sections of
the work as and when reasonable to enable such work to proceed.
E The Contractor is to afford facilities to the Employer, his Project Manager/Architect and/or any other
persons authorised by them in or upon the building and site so that this work may proceed
simultaneously with the progress of the contract.
F The provisions of this clause do not relieve the Contractor of any of his obligations under the contract
G The Contractor is to allow access for and permit the execution of work not forming part of this contract
to be carried out by contractors, tradesmen or others directly engaged by the Employer or his tenants.
Specific attendance upon, or builder's work in connection with such person will not be paid for as an
addition to the contract sum unless specifically authorized by the Architect
H Notwithstanding any specific provisions measured in these Bills of Quantities in accordance with the
EASMM the Contractor shall provide and maintain during the carrying out of the work and remove on
completion all necessary plant, tools, vehicles, etc., for the use of all trades and sub-contractors
engaged upon the works
Scaffolding
J The Contractor shall provide, erect, maintain, alter and adapt as necessary and dismantle when no
longer required and remove on completion all necessary scaffolding or staging, including boards, for
the whole of the works including works to be carried out by nominated sub-contractors
Scaffolding (Continued)
K Such scaffolding and staging shall include independent, suspended putlog or mobile scaffolds, hoist or
ladder towers, access platforms, gantries, safety rails and barriers, bricklayers, birdcage, hop-up or
other scaffolding, staging or the like or any other temporary means of access either internal or external
L The Contractor's attention is drawn to the clause entitled "Attendance upon sub-contractors" where
general attendance is to be provided for nominated sub-contractors and statutory undertaking engineers
so far as the use of standing scaffolding is described
M If the contractor uses steel scaffolding, this will be painted or galvanized and kept free from rust. If any
marks or damage are caused by rust from the scaffolding, the Contractor will be responsible for
executing at his own expense all necessary remedial measures required by the Project
Manager/Architect
TO COLLECTION
Page No. 1/13
1/15
ITEM DESCRIPTION AMOUNT (TZS)
A The Contractor shall provide an adequate resident site staff including resident engineers, agent, general
and sectional foremen, site surveyors, etc., and a sufficient number of men for the proper, complete and
expeditious execution of the works and supply and cartage, workmanship and materials which,
although not specifically mentioned, may be nevertheless incidentally necessary for the proper
completion of the work described herein
B The Contractor will be responsible for keeping all persons under his control including men employed
by sub-contractors and all unauthorized persons within bounds and will be responsible for the safety of
all new and existing buildings, materials, plant, etc., and for all damage to premises and property, roads,
footways, fences and gates by workmen, lorries or from any other cause whatsoever
C The contractor is to give the Project Manager/Architect then days notice in writing prior to executing
any work affecting adjoining properties or utility services
D No cutting through walls or floors is to be done other than as indicated by the drawings, without the
sanction of the Project Manager/Architect and the Contractor will be held responsible for all damage
arising through carelessness in this respect
E The contractor will be held responsible for all damage to the property of the public utility service
authorities and for the making good of or paying for all damage thereto
The Contractor shall provide all watching and security and everything else necessary by day and night
F for the due protection and Security of the Works and the public and other persons.
The Contractor shall provide all barriers, notices, watchmen to prevent access of unauthorized persons
G into the site.
The Contractor will be liable for all consequences of theft from the site of his own or Subcontractors or
Suppliers materials or equipment. Any such theft will not relieve the Contractor of his liability for
H completion the Works on time.
J The contractor shall protect the Works as necessary against damage or the harmful effects of weather
conditions
K The contractor shall provide water for the whole of the works including that required by sub-contractor
together with all necessary temporary connections, plumbing, storage tools, fittings, etc., give notice to
the local water supply authority, pay all charges and clear away on completion and make good.
L The contractor shall provide all necessary and adequate temporary lighting and power including all
necessary leads, lamps and fittings, etc., and pay all charges for electric current or other fuel consumed
M The contractor shall provide all necessary temporary roads, paths, gangways, hardstandings, crossings,
etc., into, on and around the site of the works for lorries, carts, barrows, etc,. Including all necessary
excavation or making up levels to ramps, etc., both for his own use and for the use of all sub-
contractors and for thedelivery of materials,etc., and for the proper excecution of works
Traffic regulations
N The Contractor shall comply with all police regulations relative to movement of vehicles, standing
vehicles, restrictions as to parking and the like
TO COLLECTION
Page No. 1/14
1/16
ITEM DESCRIPTION AMOUNT (TZS)
A The Contractor shall provide such welfare and safety measures and amenities required by the nature
and situation of the works up to a suitable standard
B In addition the Contractor shall ascertain and comply with the requirements of all local and statutory
authroties in particular the Contractors Registration Board of Tanzania by law in respect of safety
precautions taken during construction having regard to building to be erected.
C The Contractor shall comply with the requirements of any national or local trade agreements operating
in the area in which the work is to be carried out
D The Contractor, through his labour relations officer, will be expected to take all necessary steps to
avoid disputes in collaboration with recognized trades union officials, and in this connection will be
expected to provide welfare facilities to standards not less than those prescribed by the statutory
E The Contractor shall clear all deposits of mud or clay from the public highways as they arise should
such deposits be attributable to the vehicles of the contractor and any supplier or sub-contractor under
the contract
Removal of rubbish, protective casings and coverings and cleaning the works on completion
F The Contractor shall remove all rubbish, debris and surplus material, etc., including that arising from
sub-contractors' work, etc., at regular and frequent intervals during the carrying out of the Contract to
maintain a clean and safe site and on completion clean all floors and pavings, clean all glass on both
sides, remove all paint splashes, clean out all rainwater heads and down pipes, drains, gullies,
manholes, etc., tough up all paintwork and leave the whole of the works in a clean and perfect condition
ready for immediate occupation and use
Tape Protection to Windows, Entrance Screens and Doors
G The windows, entrance screens and doors will be supplied with tape protection and the sub-contractor
will strip off tape and clean down
H The Contractor should allow for any additional protection he may deem necessary and also arrange
with the sub-contractor a programme for stripping and cleaning down.
J The Contractor will be responsible for and is to allow controlling the humidity of the building
immediately before handing over and at all other times (including holiday periods) as may be necessary
to facilitate the progress and completion of the works, including the work of sub-contractors, as
described in the clauses hereafter.
Temporary Fencing, Hoardings, Screens, Fans, Planked Footways, Guard Rails, Gantries and
Similar items
K The Contractor shall provide and erect all necessary hoardings, fences, fans, screens, strutting, shoring,
gantries, footways, etc., temporary or otherwise for or in consequence of any of the works or for the
protection and security of all persons and property whatsover and take down and clear away on
completion or when no longer required and make good all work disturbed
L The Contractor shall provide all temporary lighting and obtain all licences and consents, pay all
deposits legally demandabe, maintain, alter and adapt as necessary and comply with the requirements of
the local and other authorities in respect of all the hoardings, fences, fances, screens, strutting, shoring,
gantries, footways, etc., previously described as necessary during the carrying out of the works
M Note:- Any fees or charges (not deposits) payable in connection with the foregoing items of hoardings,
fences, fans, screens, strutting, shoring, gantries, footways, etc., should be allowed for this purpose
TO COLLECTION
Page No. 1/15
1/17
ITEM DESCRIPTION AMOUNT (TZS)
A The and surrounding buildings will be in occupation during the course of this contract and the
Contractor is to allow in his prices and programming for carrying out the work so as to cause the
minimum disturbance to the occupants and the exercise of all due precautions and for complying with
all reasonable instructions from the Project Manager/Architect to achieve this
B The Contractor shall make every endeavour to reduce construction noise to the minimum. All power
tools shall have efficient silencing jackets
C The Contractor shall take all reasonable precautions to ensure the efficient protection of all streams and
waterways against pollution arising out of or by reason of the execution of the works
D The Contractor shall take all necessary precaustions to prevent nuisance from water, smoke, dust,
rubbish and other causes
E The contractor is to comply with all statutory enactments and obligations not previosly defined arising
out of or as a direct consequence of the execution of the works
F No claim will be admitted by reason of the Contractor having failed to comply with all or any of the
foregoing conditions
To Collection
COLLECTION
1/1
1/2
1/3
1/4
1/5
1/6
1/7
1/8
1/9
1/10
1/11
1/12
1/13
1/14
1/15
1/16
1/18
MEASURED WORKS
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
A Over 900mm girth not exceeding 1200 5 nr is there any trees with
this size?
B Over 1200mm girth not exceeding 1500 5 nr
Disposal of water
P Allow for keeping excavations free from water (except
spring or running water) by pumping, baling or other means
necessary Item
TO COLLECTION
Page No. 3/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Hardcore
B 200mm Bed levelled, compacted to 95% MDD and blinded
to receive polythene membrane (measured separately) 205 m2
Soil sterilization
C Gammaline 20EC solution ; Anti-termite treatment applied
at a rate of 7 litres per square metre to hardcore bed 205 m2
CONCRETE WORK
F Strip Foundaation 33 m3
G Column Footings 5 m3
H Columns 3 m3
J Ground Beams 11 m3
K Steps 1 m3
Reinforcement
Bars; high yield steel; cold worked; B.S. 4466; 460 N/mm2
Straight or bent
TO COLLECTION
Page No. 3/1/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Sawn formwork to
E
Vertical sides of plinth/ground/Sesmic beams and the like 122 m2
F Vertical edge of slab and the like over 75 but not exceeding
150mm high 84 m
WALLING
FINISHES
Insitu Finishes
TO COLLECTION
COLLECTION
CONCRETE WORK
B Horizontal beams 16 m3
Reinforcement
High tensile hot rolled deformed steel bar
reinforcement to BS 4449:1997
(The following items have been measured provisional)
Sawn formwork to
H Soffit of Slab 36 m2
CONCRETE WORK
Window Cills
Lintels
WALLING
D 230mm Wall 50 m2
Roof Finishing
Describe waterproof
Cement and sand (1:3) with approved water proofing roofing membrane
additive steel trowelled to a smooth finish
COVERINGS:
28 Gauge; Aluzinc; IT5; resincoat roofing sheet lapped to
sides and ends as per manufacturer’s specifications; fixed
to steel purlins (m/s).
Roof structure
Treated softwood pressure imprignated with preservartive
M 50 x 50 mm Purlins 308 m
Gusset plates
TO COLLECTION
Page No. 3/4/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Roof drainage.
D Extra; shoe 10 nr
E Extra; outlet 10 nr
G Extra; Elbow 4 nr
TO COLLECTION
COLLECTION
JOINERY
Mkongo or similar approved hardwood
Transome
B 45 x 145mm. rebated ; screwed and pellated 17 m
Architraves; mould
C 20 x50mm 239 m
TO COLLECTION
Page No. 3/5/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
IRONMONGERY
Supply and fix the following ironmongery as per UNION or use HAFFELE
equal and approved manufacturer to or timber with suitable manufacturer
screws provided
F Door Signage 2 nr
GLAZING
5mm thick clear glass; fixed with hard wood beads m/s:
J Panes over 0.1 m2 not exceeding 0.5m2 13 m2
TO COLLECTION
COLLECTION
INSITU FINISHING
B Soffit of Slab 30 m2
BEDS OR BACKINGS
J 12mm to walls 81 m2
TO COLLECTION
Page No. 3/7/1
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
EXTERNALLY
CEILING FINISHINGS
BRANDERINGS
EAVE BOARDS
TO COLLECTION
COLLECTION
Internal work
Prepare and apply one coat duraseal primer, two coats of
wash 'n' wear surfacer as of PLASCON or equal and
approved brand
C To Soffit of Slab 30 m2
E Frames and the like over 100 but not exceeding 200mm girth 137 m
External work
Prepare and apply one duraseal primer coat and two
finishing coats of as of PLASCON or equal and approved
brand weather guard paint or other equal and approved to
J Isolated Columns 43 m2
ELECTRICAL INSTALLATIONS
Supply, install, test and commission the following:
Note that light fittings shall be supplied complete with
tubes and lamps,All conduits should include junction
box, Elbo, and coupler with all accessories; all cables
should be supplied complete with lugs, glands and
shroud:
FLOOR PLAN
Power Distribution.
8 Ways TPN distribution board DB-GF with integral
A
100A MCCB incomer and final circuit MCBs of 10A SP
(3No), 20A SP(13No) and 32A SP(5No), 45A SP(3No),
Complete with surge arrester as Legrand,L&T,CHINT or
APROVED EQUIVALENT. 1 nr
TO COLLECTION
Page No. 3/9/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Light Fittings
A 20mm diameter heavy gauge PVC conduits concealed
underwalls and roof floors from distribution Boards to all
lighting & fire alarm outlet points and fixtures 1,075 m
TO COLLECTION
Page No. 3/9/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
TO COLLECTION
Page No. 3/9/3
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
TO COLLECTION
COLLECTION
PLUMBING INSTALLATIONS
WATER SUPPLY
Water Pump
G Contractor shall install Float switch with cable for dry run
protection 1 Set
Contractor shall install appropriately sized isolation valve
H after the common manifold for pressure testing and isolation
of the entire booster set. 1 Set
TO COLLECTION
Page No. 3/10/1
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
PIPES
D 20mm diameter 49 m
E 25mm diameter 41 m
F 32mm diameter 26 m
90 ̊ Elbow
G 25mm 15 nr
H 20mm 14 nr
J 32mm 12 nr
Tee
K 25mm 12 nr
L 20mm 15 nr
M 32mm 7 nr
Female Elbow
N 25mm 12 nr
P 20mm 15 nr
Q 32mm 9 nr
Reducer
R 32/25 9 nr
S 25/ 20 13 nr
T 32mm 5 nr
U 25mm 5 nr
V 20mm 2 nr
TO COLLECTION
Page No. 3/10/2
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
WASTE WATER
D Supply and install 100mm uPVC pipe class "B" for waste
water and in soil rain water piping system according to BS
8301 - 1985 complete with associated fittings 99 m
TO COLLECTION
Page No. 3/10/3
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
ELBOWS,90
ELBOWS 45
J 50mm diameter,Upvc 15 nr
TEE-WYE
K 100mm diameter,Upvc 9 nr
L 50mm diameter,Upvc 10 nr
PIPE CLAMPS
M 100mm size 9 nr
N 75mm size 9 nr
P 50mm size 9 nr
Q 100 mm diameter 8 nr
R 75 mm diameter 8 nr
S 50 mm diameter 10 nr
TO COLLECTION
Page No. 3/10/4
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
SANITARY APPLIANCES
TO COLLECTION
Page No. 3/10/5
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
COLLECTION
ICT SYSTEMS
STRUCTURED CABLING
N Pig tail 2 nr
R 12U voice and data cabinet with 2 heat extract fans and 6 ways power
distribution unit (PDU) and glass door. 4 nr
`
P Provide adequate earthing to voice cabinet as per IEE Regulations 1 item
T 3KVA UPS 1 nr
TO COLLECTION
Page No. 3/11/1
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
D Indoor 4MP 1/3" Progressive CMOS, ICR, 0lux with IR, 2560×1920:
20fps, 4mm/F2.0 lens, H.264/MJPEG, dual-stream, IP66, DC12V &
PoE, DWDR, 3D DNR, BLC,up to 128GB SD, 3-axis adjustment, IR
range: up to 30m, Vandal-proof housing, H.264+ Optimized Codec,
day and night with dynamic range 2-9 vari focal auto iris lens as HIK
VISION or approved equal 8 nr
TO COLLECTION
Page No. 3/11/2
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
B Smart TV 55" (Crystals HD) with HDMI and RJ45 Ethernet ports 1 nr
R PA Amplifier 1 nr
TO COLLECTION
Page No. 3/11/3
Bill Nr. 3:Court Building
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
B Wireless receiver 1 nr
TO COLLECTION
COLLECTION
Supply and install refrigerant copper pipes complete with associated fittings,
insulation as recommend by manufacturer. Supports inclusive.
D Diameter 6.4mm 29 m
E Diameter 9.5mm 22 m
F Diameter 12.7mm 29 m
Supply and install condensate drainage PVC pipes complete with associated
fittings i.e. tees, elbows reducers etc so as to make the system work
perfectly.
H 25mm diameter PVC pipe 18 m
Wiring
R Supply and install flexible cable of 3core x 2.5mm sqr control and power
cables between units and DP switch located near the door position. 32 m
S Supply and install flexible cable of 4core x 2.5mm sqr control and power
cables between indoor and outdoor units position. 32 m
Allow for testing and commisioning for the above mentioned installations;
V in accordance with the rules and regulations 1 Item
SUMMARY
Disposal of water
H Allow for keeping excavations free from water (except spring
or running water) by pumping, baling or other means
necessary Item
Hardcore
K 200mm Bed levelled, compacted to 95% MDD and blinded to
receive polythene membrane (measured separately) 16 m2
Soil sterilization
L Gammaline 20EC solution ; Anti-termite treatment applied at
a rate of 7 litres per square metre to hardcore bed 16 m2
TO COLLECTION
Page No. 4/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
CONCRETE WORK
C Column Footings 0 m3
D Columns 0 m3
C Ground Beams 1 m3
D Steps 1 m3
Reinforcement
Bars; high yield steel; cold worked; B.S. 4466; 460 N/mm2
Straight or bent
K Vertical edge of slab and the like over 75 but not exceeding
150mm high 17 m
TO COLLECTION
Page No. 4/1/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
WALLING
FINISHES
Insitu Finishes
Rendering; 15mm one coat work; to concrete or blockwork;
of cement and sand (1:6); steel trowelled to;
D Walls 7 m2
TO COLLECTION
COLLECTION
CONCRETE WORK
B Horizontal beams 1 m3
Reinforcement
High tensile hot rolled deformed steel bar reinforcement
to BS 4449:1997
(The following items have been measured provisional)
Bars; high yield steel; cold worked; B.S. 4466; 460 N/mm2
Straight or bent
C Irrespective of diameter; generally General; 25mm,
20mm,16mm,12mm,10mm,8mm diameter bars 130 kg
Sawn formwork to
CONCRETE WORK
Window Cills
WALLING
B 150mm Wall 19 m2
COVERINGS:
28 Gauge; Aluzinc; IT5; resincoat roofing sheet lapped to
sides and ends as per manufacturer’s specifications; fixed to
steel purlins (m/s).
Roof structure
Treated softwood pressure imprignated with preservartive
C 150 x 50 mm Rafters 14 m
H 50 x 50 mm Purlins 36 m
Roof drainage.
M Extra; shoe 2 nr
N Extra; outlet 2 nr
Q Extra; Elbow 4 nr
JOINERY
Mkongo or similar approved hardwood
Transome
B 45 x 145mm. rebated ; screwed and pellated 1 m
Architraves; mould
C 20 x50mm 11 m
IRONMONGERY
Supply and fix the following ironmongery as per UNION or
equal and approved manufacturer to or timber with suitable HAFFELE
screws provided
H Union Floor mounted door stop Satin stainless steel [Link] DS-
006-SSS 1 nr
insert quantity
Union Cylinder lock stainless steel satin Cat No. CL-2B21-SSS and unit
J
Union Door handle Stainless steel Satin Cat No. LHT-RR-018-
SSS 1 prs
INSITU FINISHING
A Block walls 22 m2
B 400 x 400 x 10mm; joints straight both ways; to cement and sand
base; generally to; 13 m2
C To Ramps 7 m2
BEDS OR BACKINGS
F 30mm to floors 20 m2
EXTERNALLY
Plaster; 12mm first coat of cement and sand (1:4); 3mm second
coat of white cement ; steel trowelled
G Block walls 19 m2
CEILING FINISHINGS
TO COLLECTION
Page No. 4/7/1
Bill Nr. 4:Guard House
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BRANDERINGS
B 50 x 50 mm;Branderings; plugging 46 m
EAVE BOARDS
F 50 x 50 mm;Branderings; plugging 25 m
TO COLLECTION
COLLECTION
Internal work
Prepare and apply one coat duraseal primer, two coats of
wash 'n' wear surfacer and finish with two coats of
amphibolin 2000 paint to as of PLASCON or equal and
approved brand
A Block walls 22 m2
B To gypsum Ceiling 13 m2
D Frames and the like over 100 but not exceeding 200mm girth 6 m
F General surfaces 4 m2
External work
G Rendered wall 19 m2
SUMMARY
Disposal of water
K Allow for keeping excavations free from water (except
spring or running water) by pumping, baling or other means
necessary Item
Hardcore
M 500mm Bed levelled, compacted to 95% MDD and blinded
to receive polythene membrane (measured separately) 31 m2
Soil sterilization
N Gammaline 20EC solution ; Anti-termite treatment applied
at a rate of 7 litres per square metre to hardcore bed 31 m2
TO COLLECTION
Page No. 5/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
CONCRETE WORK
B Strip Foundaation 5 m3
C Column Footings 2 m3
D Columns 1 m3
E Ground Beams 1 m3
G Steps 1 m3
Reinforcement
Bars; high yield steel; cold worked; B.S. 4466; 460 N/mm2
Straight or bent
Sawn formwork to
Q
Vertical sides of plinth/ground/Sesmic beams and the like 17 m2
S Vertical edge of slab and the like over 75 but not exceeding
150mm high 32 m
TO COLLECTION
Page No. 5/1/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
WALLING
C 160mm wide 29 m
FINISHES
Insitu Finishes
Rendering; 15mm one coat work; to concrete or blockwork;
cement and sand (1:4); steel trowelled to;
D Walls 16 m2
TO COLLECTION
COLLECTION
CONCRETE WORK
B Horizontal beams 1 m3
C Waiting benches 5 m3
Reinforcement
High tensile hot rolled deformed steel bar reinforcement to
BS 4449:1997
(The following items have been measured provisional)
Bars; high yield steel; cold worked; B.S. 4466; 460 N/mm2
Straight or bent
D Irrespective of diameter; generally General; 25mm,
20mm,16mm,12mm,10mm,8mm diameter bars 910 kg
Sawn formwork to
H Vertical edge of slab and the like over 75 but not exceeding
150mm high 30 m
CONCRETE WORK
Cills
WALLING
B 150mm Wall 54 m2
C 150mm Wall 26 m2
COVERINGS:
28 Gauge; Aluzinc; IT5; resincoat roofing sheet lapped to sides
and ends as per manufacturer’s specifications; fixed to steel
purlins (m/s).
Roof structure
Treated softwood pressure imprignated with preservartive
C 150 x 50 mm Rafters 63 m
H 50 x 50 mm Purlins 106 m
Roof drainage.
L 100mm UPVC down water pipe fixed to wall with standard holder
bats. 22 m
N Extra; shoe 6 nr
P Extra; outlet 6 nr
R Extra; Elbow 6 nr
INSITU FINISHING
A Block walls 81 m2
B To floor Generally 31 m2
BEDS OR BACKINGS
E 30mm to floors 31 m2
EXTERNALLY
Plaster; 12mm first coat of cement and sand (1:4); 3mm second
coat of white cement ; steel trowelled
F Block walls 80 m2
Internal work
Prepare and apply one coat duraseal primer, two coats of
wash 'n' wear surfacer and finish with two coats of
amphibolin 2000 paint to as of PLASCON or equal and
approved brand
A Block walls 81 m2
SUMMARY
Disposal of water
L Allow for keeping excavations free from water (except
spring or running water) by pumping, baling or other
means necessary Item
Hardcore
N 200mm Bed levelled, compacted to 95% MDD and
blinded to receive polythene membrane (measured
separately) 15 m2
TO COLLECTION
Page No. 4/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
CONCRETE WORK
C Column Footings 0 m3
D Columns 0 m3
E Ground Beams 1 m3
G Steps 1 m3
Reinforcement
Straight or bent
K 8mm diameter 242 kg
L 10mm diameter 484 kg
M 12mm diameter 363 kg
Sawn formwork to
TO COLLECTION
Page No. 4/1/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
WALLING
Solid Concrete blocks; B.S. 6073; type A; 5.0N per
square millimetre average compressive strength;
solid; in cement mortar (1:4)
A 230mm Foundation Wall 52 m2
FINISHES
Insitu Finishes
Rendering; 15mm two coat work; to concrete or
blockwork; 12mm first coat of cement and sand (1:6);
3mm second coat of gypsum powdered skimming;
steel trowelled to;
E Walls 12 m2
Three coats of bituminous paint
Prepare and apply one undercoat and two finishing
coats of bituminous paint to rendered plinth wall;
wood floated rendered surfaces; external
F Walls 12 m2
TO COLLECTION
COLLECTION
CONCRETE WORK
Reinforcement
High tensile hot rolled deformed steel bar
reinforcement to BS 4449:1997
(The following items have been measured provisional)
B 8mm diameter 52 kg
C 10mm diameter 78 kg
E 16mm diameter 0 kg
Sawn formwork to
CONCRETE WORK
Copping
Lintels
WALLING
C 150mm Wall 87 m2
COVERINGS:
28 Gauge; Aluzinc; IT5; resincoat roofing sheet lapped to
sides and ends as per manufacturer’s specifications; fixed to
steel purlins (m/s).
Roof structure
C 50 x 50mm Purlins 54 m
Roof drainage.
N Extra; shoe 1 nr
Transome
B 45 x 145mm. rebated ; screwed and pellated 3 m
Architraves; mould
C 20 x50mm 40 m
IRONMONGERY
Supply and fix the following ironmongery as per HAFELE or
equal and approved manufacturer to or timber with suitable
screws provided
GLAZING
6mm thick clear glass; fixed with hard wood beads m/s:
INSITU FINISHING
B Soffit of Slab 0 m2
C To floor Generally 22 m2
F 125mm skirting 20 m
BEDS OR BACKINGS
G 30mm to floors 22 m2
12mm Backing 48 m2
EXTERNALLY
H Block walls 47 m2
CEILING FINISHINGS
TO COLLECTION
Page No. 4/7/1
Bill Nr. 6 - Toilet Block
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BRANDERINGS
B 50 x 50 mm;Branderings; plugging 79 m
EAVE BOARDS
TO COLLECTION
COLLECTION
Internal work
Prepare and apply one coat duraseal primer, two coats
of wash 'n' wear surfacer as of PLASCON or equal and
approved brand
B To gypsum Ceiling 22 m2
C To Soffit of Slab 0 m2
External work
Prepare and apply one duraseal primer coat and two
finishing coats of as of PLASCON or equal and
approved brand weather guard paint or other equal and
approved to
H Rendered wall 47 m2
PLUMBING INSTALLATIONS
WATER SUPPLY
PIPES
D 20mm diameter 21 m
E 25mm diameter 36 m
90 ̊ Elbow
F 25mm 10 nr
G 20mm 10 nr
Tee
H 25mm 6 nr
J 20mm 9 nr
Female Elbow
K 25mm 6 nr
L 20mm 9 nr
TO COLLECTION
Page No. 4/9/1
Reducer
A 25/ 20 3 nr
B 25mm 2 nr
C 20mm 1 nr
WASTE WATER
E Supply and install 100mm uPVC pipe class "B" for waste water
and in soil rain water piping system according to BS 8301 -
1985 complete with associated fittings 31 m
Supply and install Galvanized steel wire balloon set on top of vent
J
pipe and covered with mosquito gauze, 100mm diameter 1 nr
TO COLLECTION
Page No. 4/9/2
Soil and vent pipe work
ELBOWS,90
ELBOWS 45
G 50mm diameter,Upvc 10 nr
PIPE CLAMPS
H 100mm size 5 nr
J 50mm size 5 nr
K 100 mm diameter 5 nr
L 50 mm diameter 3 nr
TO COLLECTION
Page No. 4/9/3
SANITARY APPLIANCES
K Supply , install , test heavy duty bib tap as per Sanwa or equal
approved 4 nr
TO COLLECTION
Page No. 4/9/4
COLLECTION
SUMMARY
FLAG POST
Site preparation
Site Clearance:
A Clear site of small bush, rubbish and the like and grubbing up
their roots. The Bidder shall visit the site to Satisfy himself to
the existing conditions of the site. No claim shall be entertained 14 M2
arising due to failure of the Bidder to visit the site
Hardcore
CONCRETE WORKS:
FORMWORK
BLOCKWORK
TO COLLECTION
Finishing
Signage
Direction sign
TO COLLECTION
COLLECTION
LANDSCAPING
Excavation
EXCAVATIONS
Kerbs trenches ; shallow excavation not exceeding 0.50
metres deep
CONCRETE WORK
APPROAN
E 100mm thick reinforced concrete Grade 25 to approan
reinforced with and including BRC A 142 120 m2
TO COLLECTION
Page No. 8/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
BOUNDARY WALLS
CHAIN LINK FENCE QUOTATION
Excavation and earthworks
A Excavate pits commencing at ground level average pit size
400x 400x520mm deep spaced at 3000mm centre to receive
Precast Post Base Plain insitu concrete base m/s 67 Nr
B Excavate 300x75mm deep trench along the perimetre of fence
for concrete curb. 5 M3
C Spread of the excavated Materials around the site 5 M3
CONCRETE WORKS
D Plain in-situ concrte Grade 15 in pits to Anchor Precast
Reinforced concrete posts and strut members 6 M3
E Plain insitu concrete Grade 15 curb, 75mm above the ground
in 300x150mm footing to anchor fencing wire to ground
including its formwork 5 M3
F Fabricate and erect 150x150x3000mm cranked R.C Grade 25
pre cast poleswith six predrilled holes including 4R8 bars
with R6 links at 150mm centre both of mild steel for corner 4 NR
G Fabricate and erect 150x150x3000mm cranked R.C Grade pre
cast poleswith six predrilled holes including 4R8 bars with
R6 links at 150mm centre both of mild steel for regular posts 67 NR
H Fabricate and erect 150x150x3000mm cranked R.C Grade 25
pre cast poleswith six predrilled holes including 4R8 bars
with R6 links at 150mm centre both of mild steel for straining
posts 22 NR
STEEL WORK
J Supply and fix high tensile Galvanized steel wire to the pre
drilled holes in Reinforced concrete posts in three lines to
receive welded mesh 606 M
K Supply and fix high tensile Galvanized steel Barbed wire to
the pre drilled holes in Reinforced concrete posts in three
lines to receive welded mesh 606 M
L Supply and fix 2400mm high galvanized welded mesh in
anachored into conctre at the bottom along the entire length 202 M
GATES
M Supply and Install 5000x2100mm High, Mild steel side
Hung gate: 3Nr. 300x300x3000mm High concrete
column with capping, Including all necessary size of the gate should
excavations and removal of excavation materials 1 Nr be 1200x2100mm high
N Supply and Install 900x2100mm High, Mild steel side
Hung gate: Including all necessary excavations and
removal of excavation materials 1 Nr
CHANNEL
P Concrete U shaped Closed channel 500x500mm deep
150mm thick reinforced Grade 25 with BRC Mesh A393
Complete with formwork and all earthworks and
Covered with Reinforced Cover Slabs Cover Slabs
125mm Thick 44 M
Stone Pitching
350mm Thick Stone pitching Jointed (1:3) mortar 232 m2
TO COLLECTION
Page No. 8/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (TZS)
COLLECTION
C Profit %
F Profit %
Page 9/1
GENERAL SUMMARY
ITEM DESCRIPTION PAGE AMOUNT
SUB-TOTAL 1 TSHS
ALLOW FOR: