0% found this document useful (0 votes)
45 views1 page

Pumps Report 19032024

The document reports hourly pumping data from various pumps over three shifts. It includes pump details like make, engine size and position. It reports hourly pumping volumes and notes any issues. The total volume pumped for the day is reported at the bottom.

Uploaded by

Koné Sékou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

Pumps Report 19032024

The document reports hourly pumping data from various pumps over three shifts. It includes pump details like make, engine size and position. It reports hourly pumping volumes and notes any issues. The total volume pumped for the day is reported at the bottom.

Uploaded by

Koné Sékou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PUMPS HOURLY CONTROL REPORT DATE 30/03/24

PUMPS MORNING SHIFT AFTERNOON SHIFT NIGHT SHIFT


SMU AT 6H- SMU AT 22H-
SOUTH&NORTH PITs
FLEET - MAKE-ENGINE SIZE POSITION SMU 06H 07H 08H 09H 10H 11H 12H 13H 14H SMU 14H 14H 15H 16H 17H 18H 19H 20H 21H 22H SMU 22H SMU AT 14H-22H 23H 00H 01H 02H 03H 04H 05H 06H SMU 06H 6H Flow m3/h Hrs VOLUME PUMPED (m3) VOLUME PUMPED (m3)
RL
AC529-HL260M-C18 270 Grd Stage SZ 500 -

AC523-HL260M-C18 270 Grd Stage SZ 11871 11871 11871 11871 500 0.0 0
5,600
AC542-HL260M-C9 270 Grd Stage SZ 1101 OK OK OK OK OK OK OK OK 1109 8 1109 1109 250 8.0 2,000

AC543-HL200M-C9 270 Grd Stage SZ 1301 OK OK OK OK OK OK OK OK 1309 8 OK OK OK OK OK OK OK OK 1317 8 1317 250 16.0 4,000

AC539-HL260M-C9 230 Stage SZ 4277 4277 4277 4277 700 0 0

AC531-HL260M-C18 230 Stage SZ 10984 10984 10984 10984 700 0 0 SEYDOU PIT VOLUME PUMPED (m3)

AC538-HL300M-C18 182 SZ Bottom 5255 5255 5255 5255 - 0 0

AC544-HL260M-C9 182 SZ Bottom 1753 1753 1753 1753 - 0 0


0
AC545-HL260M-C9 182 SZ Bottom 2064 OK OK OK OK OK OK OK OK 2072 8 OK OK OK OK OK OK OK OK 2080 8 2080 350 16 5600

AC513-HL260M-C18 - SZ Bottom 4365 4365 4365 4365 - 0 0 Tgw PIT VOLUME PUMPED (m3)

AC528-HL260M-C18 - TGW Pit 1500 1500 1500 1500 - 0 0

AC511-HL200M-C9 - TGW Pit 2634 2634 2634 2634 - 0 0

AC524-HL260M-C18 - TGW Pit 0 0 0 0 - 0 0

AC532-HL200M-C9 140.1 Transfert SZ 3219 3219 3219 3219 250 0 0

AC541-HL200M-C9 140.1 Transfert SZ 1295 1295 1295 1295 250 0 0

AC533-HL200M-C9 140.1 Transfert SZ 4331 4331 4331 4331 300 0 0


-
AC534-HL200M-C9 140.1 Transfert SZ 3891 OK OK OK OK OK OK OK OK 3899 8 OK OK OK OK OK OK OK OK 3907 8 3907 350 16 5600
AC540-HL200M-C9 140.1 Transfert SZ 1886 1886 1886 1886 300 0 0
Elect pump 270 Stage SZ 2735 2735 2735 2735 500 0.0 0

#VALUE!

LEGEND Comments
TOTAL PUMPED 5600
OK RUNNING Morning AFTERNOON NIGHT
M MECHANIC ISSUE W/S AC539 AC513 AC524 AC514 AC532 W/S AC539 AC513 AC524 AC514 AC532 W/S

P PIPING ISSUE W/S W/S AC529 W/S


PREVIOUS WATER LEVEL ACTUAL WATER
AREA (m) LEVEL (m)
GAP (m)
F FUEL ISSUE Standby AC533 AC538 AC544 AC040 AC541 Standby AC533 AC538 AC544 AC540 AC541 Standby

SB STANDBY Standby AC523 AC531 Standby AC523 AC531 Standby

MO MOVING Standby Standby Standby

ST STAGE PUMP Standby Standby Panne

N NO WATER Piping Panne No water

S SERVICE No water Panne No water

W/S WORKSHOP Panne Piping Piping

You might also like