Resume-Anuj Kumar Updated
Resume-Anuj Kumar Updated
Profile Outline: - Quality assurance and quality control leader having over 10 years of
experience in industries including oil, gas, petrochemical, fertilizer and energy markets with
various clients in overseas and India. Providing training for supervisors and Juniors
employees for achieving project goals while complying with best practices and industry
standards. Ability to provide direction in changing behaviours and establishing
Anuj Kumar accountability, resulting in improved planning, root cause analysis, and employee
development. Sound judgment and decision-making skills. Strong technical background
QAQC-Lead with Quality Management, Auditing, Welding, NDT, Hydrotest, Coating and Insulation.
(China Petroleum and Pipeline)
Academic Qualifications
➢ Master of Technology (MTech.) - Quality Management system (QMS) from Birla
Approval and Certifications
Institute of Technology and Science, Pilani-2020.
➢ Aramco Approval -Piping ➢ Bachelor of Engineering (B.E.) – Mechanical engineering (ME) from Rajiv Gandhi
and Structural Inspector Proudyogiki Vishwavidyalaya, Bhopal-2014.
SAP Number-80018285
➢ CBT-Piping Qualified Areas of Expertise
➢ CSWIP 3.1 Certified- ➢ Leadership, Strategic Planning, Quality Management System (MRM, PQP, PQR,
Quality Objective, KPI & Others as Per Project and Client Requirements).
786024.
➢ Project Quality Planning, Risk Management.
➢ ISO 9001-2015 Certified ➢ Project Execution, Inspection, Fabrication, Installation & Testing.
Lead Auditor- ➢ Sub-Contractor Management and Performance Monitoring.
IN/7224/62618 ➢ Procurement Quality Coordination.
➢ ASNT Level-II Certified in ➢ Witness and Document Preparation of WPS, PQR, Procedure & MS, ITP, WQT, EQT.
➢ Welding, DT & NDT, Coating and Insulation Execution and Inspection.
RT, VT, PT, UT, MT.
➢ Subcontractor Monitoring and Billing.
➢ Soft Skill-MS Office, Auto ➢ Static and Rotary equipment Installation & alignment.
CAD, Unigraphics, ➢ Scope finalization of NDT Works (Radiography & PWHT).
CAD/CAM-Proe & eAlps ➢ Dealing with PMC, Client & Vendors.
➢ Internal and external Auditing as per Company SOP & ISO 9001-2015
Requirements.
Contact ➢ Finalization of consumable requirements at site level.
➢ Preparation of final Dossier of Documentation for Client submission.
Current Address:
➢ Team Management and Trainings.
Dar es salam – Tanzania
Current Assignment
Nationality-Indian. Company Name: China Petroleum Pipeline Engineering.
Position Held: QAQC Lead.
Phone: Project Name-The East African Crude Oil Pipeline (EACOP).
From 05th Jan 2024 to till date.
+255-750142228
Project Description: -
+91-9162347511 ➢ The East African Crude Oil Pipeline Project is part of the Lake Albert Development,
the project is a 1,443km cross-country pipeline development to enable the
Email: [email protected] transport of heavy and waxy crude oil reserves located in the Albertine Graben in
Uganda, to a terminal in Tanga on the East Coast of Tanzania.
LinkedIn: ➢ Above Ground Installations (AGI) consist of 6 Pump Stations (PS-1 to PS-6) and 2
Pressure Reduction Stations (PRS-1 and PRS-2) located along the PIPELINE route.
linkedin.com/in/anuj-kumar-
26a56295
Languages: -English & Hindi
2. Equipment-Rotary
• Installation & Inspection for Rotary Equipment include Padding, Elevation, Position, Orientation,
Levelness, Master level, Shaft alignment (Without & with Piping), Blue Matching (If Required)
Surveillance inspection during erection and welding of Piping, Pipe Strain, Motor / Turbine solo run,
Final shaft alignment, Lube oil Flushing Inspection, Completion of inspection records etc.
➢ Structural Work
• IMIR clearance (Raw material & Fabricated items).
• Monitor handling & storage and Preservation of Materials.
• Monitoring & inspection of Steel Structure works pertaining to Main Pipe rack, Unit pipe racks,
Equipment structures, sub-Pipe racks & Compressor Shelters as per approved drawings &
Specifications.
• Attending RFI's raised by Concerned at various stages of inspection and for various activities (Pad
Plate inspection, Fit-up & Welding, NDT inspection, Alignment, Bolt Tightening, Gratings fixing,
Handrail erection, etc.).
• Inspect structure with reference to various tolerances and specifications and ensure usage of
appropriate Material sections, Fasteners and Consumables being used.
• Ensure that Qualified Welders, WPS & PQR are used to perform tasks and NDT (UT, RT & MPI)
requirements are fulfilled as per ITP.
• Release of Structure to preceding department after inspection.
• Resolving Technical discrepancies arose on Site in consultation with seniors.
• Review foundation release notes and take handover of foundations.
• Witness erection of structural steel, bolt tightening (snug tightening/torquing).
• Issuing Punch List on job completion and closing Punchlist for final completion and handing over to
client.
➢ Piping Work
• Inspection of Incoming Pipes, Fittings, Valves and related materials against PO, Material take-off
(MTO) list and Drawings.
• Responsible for storage and preservation of materials as per recommended procedure. Preparing
OSDR (Over shortage & Damage Report) of unacceptable materials.
• Verification of isometric dawning with respect to P&ID.
➢ Insulation
• Check the isometric drawing and proper documents to be insulated and correct the code system
(Size and thickness)
• Ensure the surface preparation is free from dust, oil, and other contaminants before starting.
• Ensure that the equipment or tools to be used and insulation materials {Polyisocyanurate (PIR),
flexible elastomeric foams (FEF), rock wool and cellular glass are used from approved manufacturers
with approved banding, sealant, screws, rivet, cold shoe, vapor stops etc. to be used in the project
with manual and in situ method.
• Monitor and check layer by layer during application of insulation and correct thickness.
• Check the completeness of the insulation and final cladding with complete sealant.
Declaration
I hereby declare that the statements given above are true to the best of my knowledge and belief.
Anuj Kumar