Camptech Manufacturing Control Plan
Camptech Manufacturing Control Plan
Machine
Process / Operation Reaction Plan & Corrective
Device Characteristics Methods
Action
Desciption
Sig. Tool
Product/Process Specification Evaluation/
No. Product Process Sampling Control Method
Tolerance Measurement Tech.
1 1
Camptech II Circuits - Manufacturing Process Control Plan
Machine
Process / Operation Reaction Plan & Corrective
Device Characteristics Methods
Action
Desciption
Sig. Tool
Product/Process Specification Evaluation/
No. Product Process Sampling Control Method
Tolerance Measurement Tech.
Chemcut
Deburring process Plugged holes are cleaned with
Deburring Deburring 1 Deburred panels Check for burrs and plugs Visual inspection 100% 100% Visual inspection
Worki instruction - WI-09 drills.
Machine
Tanks, heaters,
timers, racks,
Direct Metallization (DMS- - Visual inspection Sign off on Production Rejected board are run through
agitation motor 1 Work instruction Check for voids, residue 2-3 boards Each batch
E) - Copper flashed work order this process again.
and rails, mixer,
filter pump, oven
Oven dry
Copper flash
Pumice scrubbing
ISC 650 - Temperature: 110 ⁰C
Laminating
Laminator - Speed: 1.2-1.35 Panels are stripped of film,
Dry film 1 Laminated sheets Bubbling, film lifting Visual inspection 100% 100%
Dupont LC-2400 m/min cleaned and re-laminated.
Work Instruction
Laminator - Pressure: 40-60 PSI
Clean artwork, examine for
- Completeness of film package
nicks, cuts, opens, shorts, QC First off on
Exposing 1 Exposed copper - Film alignment Visual inspection 100% 100% Repeat process
excessive touch-up, Product work order
- Revision of films
misregistration, breakout
Various tanks,
Sign off on Production
Black Oxide heaters, racks 1 Work instructions Check for evenness of oxide Visual inspection 100% 100% Repeat process
work order
and HP 24 dryer
Multiline
Punch tooling holes
Punch Location Holes Technology 1 Check location and quantity Visual inspection Every panel Every panel Visual inspection
Work Instruction
Punch Press
Check for:
1) missing traces or pads
IS Procex
2) reduced spacing, trace widths Repeat process - pass through
Developing Aqueous Work instructions Visual inspection Every panel Every panel Visual inspection
3) shorts, nick, cuts, pinholes developer at a faster speed.
Developer
4) registration
5) dry film residue
Pumex SHD- Surface must be clean and free of
Pumice Scrubbing 1 Scrubbed panels Pumice scrubbing Visual inspection 100% 100% Visual inspection Re-clean
2000 oxidation
Tanks, heaters,
timers, racks, Work instructions
Direct Metallization (DMS- Sign off on Production Rejected board are run through
agitation motor 1 - Oven dry Check for voids, residue Visual inspection 100% 100%
E) work order this process again.
and rails, mixer, - Copper flash
filter pump, oven
Pumice scrubbing
2 2
Camptech II Circuits - Manufacturing Process Control Plan
Machine
Process / Operation Reaction Plan & Corrective
Device Characteristics Methods
Action
Desciption
Sig. Tool
Product/Process Specification Evaluation/
No. Product Process Sampling Control Method
Tolerance Measurement Tech.
3 3
Camptech II Circuits - Manufacturing Process Control Plan
Machine
Process / Operation Reaction Plan & Corrective
Device Characteristics Methods
Action
Desciption
Sig. Tool
Product/Process Specification Evaluation/
No. Product Process Sampling Control Method
Tolerance Measurement Tech.
4 4
Camptech II Circuits - Manufacturing Process Control Plan
Machine
Process / Operation Reaction Plan & Corrective
Device Characteristics Methods
Action
Desciption
Sig. Tool
Product/Process Specification Evaluation/
No. Product Process Sampling Control Method
Tolerance Measurement Tech.
5 5