Aip Final 2024
Aip Final 2024
IMPLEMENTING
FUNDING Total
AIP REFERENCE CODE PROGRAM/PROJECT/ACTIVITY OFFICE/ Maintenance & Climate Climate CC
SOURCE Personal Services (P)
DEPARTMENT Starting Date Completion Date Expected Output Other Operating Capital Outlay (CO) Change Change Typology
(PS) Adaptation Mitigation Code
Expenses (MOOE)
2. Personal Management
- Service Record Record of Personnel Update
- Leave Maintenance Updated leaves (VL, SI and others)
- Personnel Evaluation IPCR evaluated semi-annually
- NOSA/NOSI NOSA/NOSI prepared accurately
- Payroll and Remittance Preparation Payroll prepared
- Personnel Monitoring and mentoring meeting/conference conducted
6. Cashiering
PERSONAL SERVICES:
Salaries and Wages 31,764,930.25
Personnel Economic Relief Allowance (PERA)
Representation Allowance
Transportation allowance
Clothing Allowance
Subsistence, Laundry and Quarter Allowance
Hazard Pay
Cash Gift
Year End Bunos
Life & Retirement Insurance Contributions
Pag-ibig Contribution
Philhealth Contributions
ECC Contributions
MOOE:
3000-000-1-___-___-___ Travelling Expenses 360,000.00
3000-000-1-___-___-___ Training Expenses 372,680.00
3000-000-1-___-___-___ Office Supplies Expenses 1,252,471.00
3000-000-1-___-___-___ Accountable Forms 64,900.00
3000-000-1-___-___-___ Food Supplies Expenses 1,971,000.00
3000-000-1-___-___-___ Drugs and Medicines Expenses 11,000,000.00
3000-000-1-___-___-___ Medical Dental and Laboratory Expenses 12,051,600.00
3000-000-1-___-___-___ Gasoline, Oil and Lubricants Expenses 1,200,000.00
3000-000-1-___-___-___ Electricity Expenses 2,580,000.00
3000-000-1-___-___-___ Cooking gas expenses 72,000.00
3000-000-1-___-___-___ Postage and Courier Services 1,000.00
3000-000-1-___-___-___ Telephone Expenses 60,032.00
3000-000-1-___-___-___ Internet and Subscription Expenses 235,068.00
3000-000-1-___-___-___ Consultancy Services 1,440,000.00
3000-000-1-___-___-___ Repairs and Maint. - Bldgs. & Other Structure 160,000.00
3000-000-1-___-___-___ Repairs and Maint. - Machinery & Equipment 492,000.00
3000-000-1-___-___-___ Repairs and Maint. - Transportation Equipment 559,000.00
3000-000-1-___-___-___ Repairs and Maint. - Furnitures & Fixtures 200,000.00
3000-000-1-___-___-___ Water Expenses 144,000.00
3000-000-1-___-___-___ Licensing and Permits 23,500.00
3000-000-1-___-___-___ Fidelity Bond 31,000.00
3000-000-1-___-___-___ Other Maintenance & Operating Expenses 5,000.00
34,563,251.00
CAPITAL OUTLAY:
3000-000-1-___-___-___ Purchase of Operating Room Equipments PPDO GF 10,000,000
3000-000-1-___-___-___ Purchase of Service Vehicle 4x4 PPDO GF 2,500,000
3000-000-1-___-___-___ CCTV Upgrading PPDO GF 1,500,000
3000-000-1-___-___-___ Installation of Intercom PPDO GF 500,000
3000-000-1-___-___-___ Purchase of New Generator Set with Powerhouse PPDO GF 2,000,000
3000-000-1-___-___-___ Installation of Integrated Hospital Information System(IHOMIS) PPDO GF 3,000,000
3000-000-1-___-___-___ Purchase of Air Purifier for Isolation,Infectious,OB and Regular Ward PPDO GF 4,800,000
3000-000-1-___-___-___ Purchase or Ambulance Equipments and Supplies PPDO GF 5,000,000
3000-000-1-___-___-___ Purchase of Radiology Building Equipments PPDO GF 40,000,000
66,800,000.00
20% Development Plan:
3000-000-1-___-___-___ Rehabilitation of Perimeter Fencing with Gate,Fabricated Angle Bars and Lightpost c/o PEO
3000-000-1-___-___-___ Construction of Drainage Canal System c/o PEO
3000-000-1-___-___-___ Embankment and Concreting of CDH grounds 20,000,000
3000-000-1-___-___-___ Rehabilitation of BEMONC Building (Labor room,individual CR/room) c/o PEO
3000-000-1-___-___-___ Rehabilitation of Surgery Ward c/o PEO
3000-000-1-___-___-___ Construction of Central Supply Room c/o PEO
Rehabilitation/Rewiring of electrical system with connection to Gen set (ER, Respi,
3000-000-1-___-___-___ covered WW, Dormitory, Multipurpose, Isolation, Radio Bldg, Lab, Doctors Q) c/o PEO
3000-000-1-___-___-___ Construction of Water Reservoir from rainwater collection c/o PEO
359,200,000.00
NON-OFFICE:
Regulation
PHIC Accreditation Jan-23
DOH Licensing Jan-23
Animal Bite Treatment Center Sep-23
PHA Membership Oct-23
NEQAS
Bureau of Fire
TB-DOTS
EMB
PERSONNEL SERVICES:
* Preparation For Level 1 LTO Hospital
Creation of the following Positions:
Admin. Officer V SG 18
Supply Officer I SG 10
Process Server SG 5
Dental Aide 1 SG 4
Cook 1 SG 3
Laboratory Aide 11 SG 4
Billing Officer
Medical Specialist I SG 21
Medical Officer IV SG 20
Medical Officer III SG 18
Medical Technologists II SG 11
Pharmacist II SG 12
Nusing Attendant II SG 6
Computer Operator I
Administrative Aide I SG 1
Administrative Aide IV SG 4
Administrative Aide VI (14,510/month)/ 175,000.00/annum/PERA
2,000/monthly/24,000.00/annum (Lateral Position for Rosemarie P. Recto)
SCHEDULE OF
EXPECTED OUTPUTS
AIP IMPLEMENTING IMPLEMENTATION
REFEREN PROGRAM/PROJECT/ACTIVITY OFFICE/
CE CODE DEPARTMENT Completion Performance/Success
Starting Date
Date Indicators
2. Personal Management
- Service Record Record of Personnel Update
- Leave Maintenance Updated leaves (VL, SI and ot
- Personnel Evaluation IPCR evaluated semi-annually
- NOSA/NOSI NOSA/NOSI prepared accurate
- Payroll and Remittance Preparation Payroll prepared
- Personnel Monitoring and mentoring meeting/conference conducte
3. Planning and Budgeting
Budget proposals and plans
Budget Proposal prepared and submitted
6. Cashiering
8. Medicare
- Medicare claims/Reports Prepared Claims prepared within 60 day
upon discharge of patients
accurately ICD 10 coded with
minimal denied/return
to hospital claims
9. Pharmacy
- Drug Care and Inspection Affordable and adequate
supply of medicines are
available in accordance with
PNDF
- Inventory (EDPMS Reporting) Accurate submission regularly
10. Supply
Procurement and Storage Precise and prompt preparatio
of PRs for a continous supply
of DM medical/laboratory
supply in the hospital
11. Dietary
- Provision of adequate and 100% of patients provided
Appropriation Nutritious adequate and nutritious foods
- Meals to all patients 3x a day per doctor's order
PERSONAL SERVICES:
Salaries and Wages
Personnel Economic Relief Allowance (PERA)
Representation Allowance
Transportation allowance
Clothing Allowance
Subsistence, Laundry and Quarter Allowance
Hazard Pay
Cash Gift
Year End Bunos
Life & Retirement Insurance Contributions
Pag-ibig Contribution
Philhealth Contributions
ECC Contributions
MOOE:
Travelling Expenses
Training Expenses
Office Supplies Expenses
Accountable Forms
Food Supplies Expenses
Drugs and Medicines Expenses
Medical Dental and Laboratory Expenses
Gasoline, Oil and Lubricants Expenses
Electricity Expenses
Electricity Expenses-Magna Carta
Cooking Gas Expenses
Postage and Deliveries
Telephone Expenses-Landline
Telephone Expenses-Mobile
Internet Expenses
Consultancy
Repairs and Maintenance-HH Center
Repairs and Maintenance-Office Equipments
Repairs and Maintenance-Furniture and Fixtures
Repairs and Maintenance-IT Equipment
Repair and Maintenance-Motor Vehicles
Fidelity Bond
Other Maintenance & Operating Expenses
CAPITAL OUTLAY:
1 PABX with Intercom:
System
Special Units (4 units)
Ordinary Units (22 units)
Installation
2 Solar Panels
3 Re-Wiring of Hospital Electrical Wirings
4 CCTV (Foscam Philippines)
5 Service Vehicle(Toyota Hilux)
6 Photocopier (Multi-Purpose-Kyocera Taskalfa 1800)
Component (Latest Sony with Mic) (3
7 set)
8 Refrigerators (no frost- 4 units))
9 Steel Cabinets-Big NBS (5 units)
10 Vacuum Cleaner Heavy Duty (2 units)
11 Mist Fan (4 units)
12 LED TV (4 units)
13 Vault
14 Rustrum CDH (1 unit)
15 Desktops (10 units)
16 Wall Fans (10 unit)
20% DF :
Construction of Drainage System (Front /Back)
Cementing the parking area w/ lights and benches
NON-OFFICE:
Regulation
PHIC Accreditation
DOH Licensing
Animal Bite Treatment Center
PHA Membership
NEQAS
Bureau of Fire
EMB
OTHER SOURCE:
Ambulance (Toyota Commuter)
1 LTO cert
LTO and Cert.
1 Cert.
1cert
1 PHIC Accre. Cert
1Permit
4 Bond
All
All
All
All
39 payrolls
13
1
1
All
All
All
All
100%
100%
ately and timely
98%
10 coded with
All Medicines
ssion regularly
98%
All patients
nutritious foods
all areas
All
Hospital
prepmises
100%
pipes,electrical
100%
17,895,405.60
11,385,777.20
1,267,200.00
59,400.00
59,400.00
264,000.00
1,045,440.00
950,400.00
264,000.00
944,648.10
1,360,294.10
63,360.00
170,038.00
61,448.20
###
192,500.00
180,000.00
545,000.00
53,720.00
876,000.00
3,322,611.00
4,347,860.00
275,000.00
1,463,000.00
19,800.00
49,500.00
1,100.00
60,000.00
60,000.00
78,000.00
1,000,000.00
110,000.00
110,000.00
11,000.00
11,000.00
165,000.00
16,800.00
5,500.00
5,370,000.00
3
20,000.00
16,000.00
44,000.00
10,000.00
1,000,000.00 16
500,000.00 9
200,000.00 1
2,000,000.00 2
500,000.00 6
135,000.00 10
120,000.00 7
75,000.00 13
40,000.00 11
40,000.00 14
100,000.00 12
30,000.00 8
20,000.00 15
500,000.00 4
20,000.00 5
2,000,000.00
1,500,000.00
5,500.00
3,300.00
5,500.00
2,200.00
33,000.00
1,000.00
11,000.00
2,000,000.00
3,500,000.00
61,500.00
2,000,000.00
17,895,405.60 12,953,391.00 5,370,000.00 ###
GRAND TOTAL : 41,780,296.60