Project Proposal

This 3 sentence summary provides an overview of the key details from the document: The document proposes a solid waste management project called "Hakbang tungo sa kalinisan" for Brgy. Calibungan, Victoria Tarlac from June to August 2023, with the objectives of educating residents on proper waste disposal, implementing waste sorting, and evaluating the effectiveness of the new system. The project would be managed by Jerold Gonzaga and aims to reduce waste in the streets by 90%, recycle 80% of recyclables, and ensure 95% of residents understand recycling by the end of July 2023.

Uploaded by

omaygashinderu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views

Project Proposal

This 3 sentence summary provides an overview of the key details from the document: The document proposes a solid waste management project called "Hakbang tungo sa kalinisan" for Brgy. Calibungan, Victoria Tarlac from June to August 2023, with the objectives of educating residents on proper waste disposal, implementing waste sorting, and evaluating the effectiveness of the new system. The project would be managed by Jerold Gonzaga and aims to reduce waste in the streets by 90%, recycle 80% of recyclables, and ensure 95% of residents understand recycling by the end of July 2023.

Uploaded by

omaygashinderu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROPOSAL TITLE: Hakbang tungo sa kalinisan: A proposal for solid waste

management
TYPE OF PROJECT: Waste segregation and collection

Number of Beneficiaries: more than 20 people and/or families


Location of beneficiaries: Brgy. Calibungan, Victoria Tarlac
Project duration: June 5 – August 31, 2023
Area of project implementation: Calibungan, Victoria tarlac
Budget requirement: Php 15,000
Budget requested: None

I Background/Situational Analysis
The management of solid waste is a major issue in our Barangay. We produce waste
every day, and incorrect waste disposal can have a negative impact on the environment
and our health. Our initiative, "Hakbang tungo sa kalinisan," seeks to resolve this
problem by putting in place a solid waste management system in our neighborhood.
This project of ours will aim to address the increasing environmental concerns
associated with improper waste disposal and promote a cleaner, greener, and more
sustainable place. By adopting waste management strategies, we can minimize waste
generation, and reduce the overall environmental impact of improper waste
management

II Project objectives
The Hakbang tungo sa kalinisan: A proposal for solid waste management aims to:
 Educating the community on the importance of waste management and its
impact on the environment and public health.
 Create a method for sorting and separating waste so that recyclable,
compostable, and non-recyclable waste are properly separated.
 Monitor and evaluate the effectiveness of the waste management system
through regular assessments and feedback.
III Expected output
By the end of July 2023 the outputs expected are as follows:
1. More than 90% of the Barangay’s solid waste will be reduced off the streets

2. 80% of the Barangay’s recyclable waste will be recycled

3. 95% of the Barangay’s residents will know the variety of recyclables and its
benefits to our lives

4. 100% of the Barangays’ residents will be fully acknowledge the awareness


on proper waste management

IV Risk management plan

Cost overrun
Proper financial planning and monitoring are essential to prevent cost overruns. In
order to prevent it we need to develop a realistic budget by conducting detailed cost
estimations and accounting for contingencies, we can also Implement effective cost
control measures, such as careful procurement processes, regular financial
reporting, and careful cost management strategies

Community opposition
Address community concerns by charming in open and obvious communication.
Conduct community consultations, public gatherings, and information gatherings to
determine correct project information and address misunderstandings. Seek
recommendation from community representatives, address their concerns, and
include them in decision-making processes. Implement community engagement and
reach programs to support a sense of partnership and involvement

Delays in project
We will need to develop emergency plans to account for potential delays and
establish clear communication channels along contributors to immediately address
any issues. Regularly monitor the project's progress and take full of enthusiasm
measures to mitigate delays, in the way that adjusting timelines, assigning
additional resources, or pursuing alternative solutions
V Project organizing and staffing

Staff designated Duties and responsibilities Contact person

Project manager  Develop and implement the project


management plan, including setting
objectives, timelines, and resource Jerold Gonzaga
allocation. 0983XXXXXXX

 Coordinate and oversee all project


activities, ensuring adherence to
the project plan.

Technical  Design waste management John Manansala


experts systems, including collection, 0976XXXXXXX
transportation, treatment, and
disposal methods. Vincent Mangahas
0991XXXXXXX
 Conduct regular inspections and
monitoring of waste management
facilities to ensure compliance with
technical standards and
regulations.

 Develop and implement


Environmental environmental control plans and Eleena Malaluan
specialists method 0989XXXXXXX

 Provide management on waste Katlyn Duarte


minimization, recycling, and 0965XXXXXXX
environmental best uses
Project work plan
Phases of Activity Output/Target Indicator Person in
the project charge

June Start of To talk on how the The community will Jerold Gonzaga
5,2023 the project community will participate activities
divide themselves in order to create a
to clean the healthier
barangay environment

August Recycling To gather as much The community Amanda


21,2023 the as plastic bottles, may be able to use Samonte
recyclable cardboards, glass these materials for
waste bottles and any future purposes or
other recyclable simply recycle it for
scraps the better use

VI Project work plan

VII Detailed budget requirement


Supplies and Materials
Budget line item Description Amount needed Proposed source

Cleaning materials Will be used by the


community in Php 8,000 Donations
order to clean the
Barangay

Waste collection Vehicles such as Php 5,000 Local government


equipment garbage trucks agencies
and waste
compactors that
collect and
transfers waste

VIII Signatories
Prepared by:
Cuaresma, Niccolo james
Villamor Aprilyn
From 11-HUMSS-PLATO

Jerold Gonzaga
Project Manager

Domingo R. Baldovino
Sanior high school principal

Ariel Tumamao
Barangay Captain, Barangay Calibungan, Victoria, Tarlac