DETAILED SPECIFICATIONS
PLINTH : 1.6 FROM FINAL ROAD TOP
FLOOR : 10’0” CLEAR HEIGHT
PARAPET WALL : 3’0” FROM FLOOR LEVEL
BOUNDARY WALL : 5’0” FROM FINAL ROAD TOP
DOOR FRAME : MAIN DOOR IN SAGWAN WOOD (SECOND)
ALL INNER DOORS – LAMINATED FLUSH DOORS
ONE SIDE.
ALL DOORS FRAMES WILL BE PROVIDED IN
PLYWOOD FINISHED WITH LAMINATE.
SIZES
MAIN DOOR : 3’3” X 7’0”
INTERIOR DOOR : 3’0” X 7’0”
KITCHEN & BATHROOM : 2’6” X 7’0”
FIXTURES ARE IN SS OR ALLUMINUM
WINDOWS : ALL WINDOWS ARE OF ALUMINIUM 0 .75 SECTIONS
WITH GLASS 3.5 MM REFLECTIVE WITH POWDER
COATED.
(DOUBLE/ TRIPLE TRACT AS PER STRUCTURE).
STRUCTURE
STEEL BRAND USED WILL BE MORYA/ ETC
CEMENT JK SUPER, BIRLA OR ANY EQUIVALENT
SAND NEMAWAR NARMADA
GITTEE 12 MM & 10 MM BLACK
FOUNDATION RCC COLUMNS AND FOOTINGS WITH 1:2:4
MORTAR OR M20
PLINTH RCC PLINTH BEAM WITH 1:2:4 MORTAR OR M20
LINTEL PROVIDED OVER ALL DOORS AND WINDOWS
ROOF RCC SLAB 1:2:4 MORTAR OR M20
BRICK WORK GUTKHA
4” WALL OUTER AND INNER WALLS 4” THICKNESS
PLASTER INTERNAL WALLS DOUBLE COAT 12-15 MM IN 1:4 CEMENT MORTAR
EXTERNAL WALLS DOUBLE COAT 20-25 MM IN 1:4 CEMENT MORTAR
KITCHEN PLATFORM BLACK GRANITE (RS. 85/-) PER SQ/FT)
2’X3” WIDE & LENGTH AS PER UNIT PLAN
HEIGHT 2’X 6”
SINK STAINLESS STEEL SINK 18”X24” OF ISI MARK
WALL TILES TILES ON WALL UPTO 2 FT HEIGHT
OF RS. 30-35 PER SQ/FT RANGE
ELECTRICAL ALL CABLING SHALL BE CONCEALED PVC CONDUITS
IN COPPER WIRING WITH PROPER MCB & EARTHING
WIRES BRANDED ISI MARKED OR EQUIVALENT BRAND
SWITCHES BRANDED ISI MARKED OF WESTERN OR EQUIVALENT
SOCKETS POINTER MINI MODULAR
AC SWITCH 1 AC SWITHC WILL BE PROVIDED IN ALL ROOMS.
TOILETS TILES CERAMIC IMPORTED TILES OR EQUIVALENT
UPTO 7’X0” HEIGHT OF RS. 40/- PER SQ/FT RANGE
PLUMBING SANITARY &
SEWAGE
KITCHEN POINTS FRESH & TANK WATER POINT IN SINK WITH ROPOINT
MIXER WITH GEYSER POINT, NORMAL WATER POINT
TOILET POINTS TAB IN WASH BASIN
NORMAL TAB BRANDED IN BATHROOM & WC PVC
FLUSH TANK PROVIDED WITH EUROPEAN W.C.
(JAGUAR BRAND/ ECONOMIC SERIES OR EQUIVALENT)
PLUMBING ISI MARKED BRANDED CPVC LINES OF TEXMO BRAND
FOR HOT AND COLD WATER. C.P. FITTINGS OF
(JAGUAR/ ECONOMIC SERIES OR EQUIVALENT)
SANITARY BRANDED (EROS/BELL OR ANY EQUIVALENT)
ONE BASIN PER BATHROOM WILL BE GIVEN AND
ONLY ONE EXTRA BASIN WILL BE GIVEN.
FLUSH VALVE OF BRANDED MAKE
P.V.C. PIPES & FITTINGS OF KISSAN BRAND OR
EQUIVALENT)
SEWERAGE ALL SEWAGE PIPES EXTERNAL SHALL BE OF PVC
WATER STORAGE TANK 4000 LTRS BASE TANK & 1000 LTRS AT ROOF TOP
FLOORING TILES 2’X2’/ 32”X32” VITRIFIED TILES OF BRANDED
QUALITY WILL BE PROVIDED IN COMPLETE HOUSE
MAXIMUM OF RS. 40/- PER SQ. FT.
PORCH CHECKERED TILES MAX. RS. 35-40/- PER SQ.FT. RANGE
IRON/STEEL WORK
GRILLS MS SQUARE BARS 12 SQ.MM & MS FLATS WEIGHING
1.25 KG/ SQFT.
RALLINGS DESIGNER SS RAILINGS RS. 350/- PER SQ/FT.
MAIN GATE DESIGNER IRON GATE ( QNTY. 1 NO. WEIGHT 80 KG)
FINISHES INTERNAL WALLS PLASTIC PAINT WITH DOUBLE WALL PUTTY OF
BIRLA WHITE ( ONLY ON INTERIOR WALLS)
EXTERNAL WALLS NEROLAC/ASIAN/APEX/ DULUX (PLASTIC PAINT
WEATHER EMULSION ON ELEVATION)
STEEL WORK OIL PAINT OVER 1 COAT OF PRIMER
WOOD WORK FINISHED WITH TOUCH WOOD
ALL COLOUR WORK NEROLAC/ BERGER/ ASIAN /DULUX
PAYMENT TERMS AND CONDITIONS :
- All payments would be required before/ after the commencement / completion of the different
stages of construction that would be mentioned in payment schedule that makes a part of this
contract.
- Variation from the contract does not include in the payment schedule and contract amount.
Any changes/ variation from the main scope of works as per the above shall contribute to the
Variation in the contract and will be signed and agreed between both the parties beforehand.
- Construction would be done as per Engineer Site Plan and if there would be any changes/
variation in this then that will be charged extra.
-
NOTES :-
- All additions and alterations in Site Plan/ change in specifications shall be charged extra.
- False ceiling will be provided in Hall only.
- Modular kitchen below kitchen stand will be the part of contract.
- Wall papers and texture and any other interior work will be the part of contract.
- Permanent Electricity Connection will be done by the purchaser and all cost involved in this
will be borne by purchaser.