This document outlines the tasks, durations, start and finish dates, and dependencies for a project called SATS to design, install, test, and hand over a solar power system. The project involves design and procurement from July to August, site mobilization and structural works in August, panel and wiring installations in August and September, testing and commissioning in October, defect resolution in October, and final handover in November. The critical path runs through design, procurement, installation, testing and commissioning activities to ensure the system is handed over on schedule by mid-November.

Uploaded by

chengsy.us
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Timeline SATS

This document outlines the tasks, durations, start and finish dates, and dependencies for a project called SATS to design, install, test, and hand over a solar power system. The project involves design and procurement from July to August, site mobilization and structural works in August, panel and wiring installations in August and September, testing and commissioning in October, defect resolution in October, and final handover in November. The critical path runs through design, procurement, installation, testing and commissioning activities to ensure the system is handed over on schedule by mid-November.

Uploaded by

chengsy.us
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ID Task Task Name Duration Start Finish Predecessors Jul '23 Aug '23 Sep '23 Oct '23

h Predecessors Jul '23 Aug '23 Sep '23 Oct '23 Nov '23
Mode 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12
1 SATS 91 days Fri 7/7/23 Fri 10/11/23
2 Design and Preliminary stages 36 days Fri 7/7/23 Fri 25/8/23
3 Site Visit 1 day Fri 7/7/23 Fri 7/7/23
4 Detail Design, Discussion, Review and Approval 15 days Mon 10/7/23 Fri 28/7/23
5 Procurement 25 days Mon 24/7/23 Fri 25/8/23
6 Site Mobilization 1 day Mon 21/8/23 Mon 21/8/23
7 Structural Works 16 days Mon 21/8/23 Mon 11/9/23
8 Material Delivery On Site 1 day Mon 21/8/23 Mon 21/8/23
9 Site Marking and Works 5 days Wed 23/8/23 Tue 29/8/23
10 Installation of Mini Rails 11 days Fri 25/8/23 Fri 8/9/23
11 Installation of Earthing Inter Module/ Tables 3 days Thu 7/9/23 Mon 11/9/23
12 Panel Works 20 days Mon 21/8/23 Fri 15/9/23
13 Material Delivery on Site 1 day Mon 21/8/23 Mon 21/8/23
14 Hoisting Panel (Terminal Block) 2 days Sat 26/8/23 Sun 27/8/23
15 Hoisting Panel (Terminal Block) 2 days Sat 2/9/23 Sun 3/9/23
16 Hoisting Panel (Carpark Block) 2 days Sat 9/9/23 Sun 10/9/23
17 Panel Alingment and Interconnection Module Works 15 days Mon 28/8/23 Fri 15/9/23
18 DC Works 25 days Mon 21/8/23 Fri 22/9/23
19 Material Delivery On Site 1 day Mon 21/8/23 Mon 21/8/23
20 Trunking Works 5 days Mon 4/9/23 Fri 8/9/23
21 DC Cable Laying 8 days Mon 11/9/23 Wed 20/9/23
22 DC Cable Testing 6 days Sun 17/9/23 Fri 22/9/23
23 AC Works 12 days Mon 4/9/23 Tue 19/9/23
24 Material Delivery On site 1 day Mon 4/9/23 Mon 4/9/23
25 Trunking Works 4 days Tue 5/9/23 Fri 8/9/23
26 AC Cable Laying 5 days Mon 11/9/23 Fri 15/9/23
27 AC Cable Testing 3 days Sat 16/9/23 Tue 19/9/23
28 Temination Works 2 days Sat 23/9/23 Sun 24/9/23
29 AC Termination and Shutdown Works 2 days Sat 23/9/23 Sun 24/9/23
30 Communication Works 6 days Mon 25/9/23 Mon 2/10/23
31 Installation of Sensor and Wiring Works 2 days Mon 25/9/23 Tue 26/9/23
32 Sensor Testing 4 days Wed 27/9/23 Mon 2/10/23
33 Testing and Commisioning 11 days Mon 2/10/23 Sun 15/10/23
34 DC Cable Testing 1 day Mon 2/10/23 Mon 2/10/23
35 Inverter Testing 1 day Mon 2/10/23 Mon 2/10/23
36 AC Cable Testing 1 day Mon 2/10/23 Mon 2/10/23
37 System Commisioning 6 days Tue 3/10/23 Tue 10/10/23
38 System PR Testing 4 days Wed 11/10/23Sun 15/10/23
39 Defect List 6 days Mon 16/10/23Mon 23/10/23
40 Site Walk and Findings 2 days Mon 16/10/23Tue 17/10/23
41 DL Makegood 4 days Wed 18/10/23Mon 23/10/23
42 Handing Over 13 days Wed 25/10/23Fri 10/11/23
43 Documentation Preparation 13 days Wed 25/10/23Fri 10/11/23
44 Request for Meeting 7 days Thu 2/11/23 Fri 10/11/23

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: SATS Split External Tasks Inactive Summary Manual Summary Progress
Date: Wed 16/8/23 Milestone External Milestone Manual Task Start-only
Summary Inactive Task Duration-only Finish-only

Page 1
ID Task Task Name Duration Start Finish Predecessors Jul '23 Aug '23 Sep '23 Oct '23 Nov '23
Mode 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12
45 Handover Meeting and Training 5 days Mon 6/11/23 Fri 10/11/23

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: SATS Split External Tasks Inactive Summary Manual Summary Progress
Date: Wed 16/8/23 Milestone External Milestone Manual Task Start-only
Summary Inactive Task Duration-only Finish-only

Page 2

You might also like