Environment and Social Compliance requirement report for DRSLP-I, 2021
Environmental and social management requirements
The selection, planning, design and implementation of the subprojects under DRSLP have to be
consistent with the relevant national environmental and social management requirements as well
as the Africa Development Bank safeguards policies applicable to the program and its
subprojects and international conventions. In each case, national, regional, woreda and local
institutions to be involved in screening, reviewing and approving subprojects; and they were
carrying out their respective roles and responsibilities. The responsibilities may include
identification of subprojects, screening, conducting environmental and social assessment (ESA),
and reviewing the ESA report for ensuring compliance to obligatory requirements under laws
and regulations, and issuing approvals for subproject implementation.
Most of the subprojects planned under the DRSLP were vary in a scale. Due to some of the
DRSLP subproject like development and management of small scale dam, micro-irrigation
infrastructures subprojects, Animal Health post and PVC, PTC, construction of rural feeder road,
construction of market center, Rangeland management, and some of the negative environmental
and social impacts due to these subprojects may have localized impact but less sensitive, site
specific and perhaps reversible environmental impacts if appropriate screening was done and if
such impacts are not considered with regard to their locations or in the design of the subprojects.
Page | 2
Environment and Social Compliance requirement report for DRSLP-I, 2021
The potential environmental and social impacts were identified by ESIA study and prepared
ESMP for implementation of mitigation measures for identified adverse impacts (18 in Afar and
42 out (23 were constructed) in Somale) 60 water infrastructures including micro dam, BH,
Birka pond, HDW, etc
Screened format, checklist filled and documented for project infrastructures such as 13 LMCs,
21 PTCs, 27 animal health facilities (24 AHP and 3 PVC) and 5 routes including small bridge
with access road. The total summary is presented on below table (a. for Somale and b. for Afar).
Page | 3
Environment and Social Compliance requirement report for DRSLP-I, 2021
a. Environmental and Social Compliance
Reporting Format for ESS Requirements
Ministry: …. MoA,…… For DRSLP-I
Region: Somali Region ……. Project consolidation
Location No of subprojects with
Type of Sub Quarte
projects/Activities Wored r year
Zone Kebele DR ESMP FA RAP PMP ESIA * Remark
a
Component 1: Natural Resource Management
new borehole Jarar Ararso Waryugle
new borehole Jarar Ararso Garbadinle
new borehole Jarar Ararso Dintaab
new borehole Jarar Birkot Sankadane
new borehole Jarar Birkot Elhar
Koraha
k/dahar Elhar
new borehole y
Koraha
Marsin Gabo gabo
new borehole y
Koraha
Marsin Weylaguhid
new borehole y
new borehole Fafen Goljano Kodahle
new borehole fafen Goljano Anane
new borehole Fafen Goljano Dalatowga
new borehole Erar Kubi Gara
new borehole Sitti Hadagala Biyogara
new borehole Sitti Hadagala Harisa
new borehole Sitti Hadagala Hore
new ponds Dawa Mubarek/ Hawan
new ponds Dawa Mubarek/ Wal-walo
new ponds Dawa Mubarek/ Jare
new ponds Dawa Mubarek/ Mubarek 02
Borehole Fafan Goljano 01 kabale conducted in
2015
Page | 4
Environment and Social Compliance requirement report for DRSLP-I, 2021
Rehabilitation
Borehole
Sitti Hadagala 01 kabale >>
Rehabilitation
Hand Dug Well Sitti Hadigala Waruf/ >>
Kebrideha
Hand Dug Well Korahay r/ Lasdarkele >>
Page | 5
Environment and Social Compliance requirement report for DRSLP-I, 2021
Magaalocad
Didinle and Gadid-
Sitti Hadagala
kate >>
Ararso,
Birkod, Haljid, (Hiley &
Goljano Gomar), (Daleta &
Jarar
and Malkaka) and >>
Kebridaha Mara’ato.
r
Construction of new
PTCs Dawa Mubarak Bidirtu >>
Wadiley and
Afder Raaso
Tigder >>
conducted in
Erer Kubbi Kubi & Garaa 2017
Construction of feeder Malkaka & Ganbo conducted in
Fafan Goljano
Ase 2018
road
Ton'iley & conducted in
Korahay Marsin
Madahmarodi 2015
Jarar & Marsin
Korahay and Birkod
01 and 02 Kebeles >>
Page | 6
Environment and Social Compliance requirement report for DRSLP-I, 2021
level
Zones
2 Birkot 9 Screened 9 9
Kabrida
Screened
3 har 6 6 6
Screened
4 Marsin 10 10 10
Screened
5 Raso 6 6 6
Mubare
Screened
6 k 10 10 10
Screened
7 Goljano 9 9 9
Screened
8 Kubi 10 10 10
Page | 7
Environment and Social Compliance requirement report for DRSLP-I, 2021
Hadigall
Screened
9 a 9 9 9
77 all 0 0 77 0 77 0 0 0
Name of Region:
Somali
Program/Project Type; (DRSLP I) ----
Date: 30/06/2021--
Prepared ESMP/
Land &approved PMP
Screene Envir ESIA
Name Types of acquisiti implemen
Name of d& onme Prepared
of sub on ted Remark/
S/N subproje proved ntal &approve (Yes/No)
Wored projects/ format Certified
ct site (Yes/N Categ d (Yes/No)
a activities
o) ory (Yes/No)
N
yes
o
ESMP PMP
Marsi Borehol ye Ongoin
1 e
Water yes III Yes Yes yes
g
n s
Borehol ye Ongoin
2 Kubi e
Water yes III Yes yes yes
g
s
ye Complet
3 Raso Pond Water yes III Yes yes yes
ed
s
Page | 8
Environment and Social Compliance requirement report for DRSLP-I, 2021
K/ ye Ongoin
4 Pond Water yes III Yes yes yes
g
dahar s
Total
protecting the
2 Ararso BH Water
BH
SWC on the upper side of the BH woreda Ongoing
Page | 9
Environment and Social Compliance requirement report for DRSLP-I, 2021
Borehole Elidaar Gewahe
Borehole Elidaar Elidaar
Bore hole Hdelela Aftoha
Borehole Afdera Namagubi
Micro dam Elidaar Suula
Birka Elidaar Elidaar
Birka Elidaar Suula
Birka Elidaar Manda
Water pipeline distribution Elidaar Suula
Maintenance hand pump Adaar Burka
Maintenance hand pump Adaar Burka
Maintenance hand pump Adaar Jeldi
Pond Erupt Adu
Pond Erupt Adu
Irrigation canal Hdelela Abake bera
No of sub-projects with
Type of Sub Location Quarter
projects/activities year DR ESMP FA RAP PMP ESIA
Woreda kebele
Component 1: Natural Resource Management
Adaar Burka
Adaar Adaar
Elidaar suulla
Erupt Albo
PTC Erupt Erupt
Hdelela Aftoha
Hdelela Abake ber
Afdera kusurawad
Afdera Ayitura
Component 2: Market and Livestock Infrastructure
Hdelela Hdelela
LMC Erupt Adu
Elidaar Elidaar
Page | 10
Environment and Social Compliance requirement report for DRSLP-I, 2021
Afdera Aliganda
Adaar Siylu and woki
Adaar Burka
Erupt undergalo
Animal Health post
Hdelela Leleda
Geloalo Diyara
Afdera kusurawad
Animal Health Center Afdera Ayitura
Access Road Elidaar Su’ula-karbilo
Bridge with 4 km feeder Edaforo to
Geloalo
road under construction Subuli
Component3: Strengthening and Building Community and Institutional Capacity
TOT on Training on sanitation, Hygien, Environmental and Social Safeguards
(ESS) management for project staff at regional level for 5 days m=132, F=5 a total of 137 All DRSLP Zones All DRSLP Woredas
1 Adaar 10 10 10 5 10
2 Elidaar 10 10 1 9 7 10
Page | 11
Environment and Social Compliance requirement report for DRSLP-I, 2021
3 Erupt 9 9 9 4 9
4 Hadelela 5 5 5 1 5
5 6 6 6 1 6
Afdera
Gela'alo/Bure 2
2 2 2
6 Mudaytu
42 42 0 1 41 18 42 0 0 0
Date: 15 /7/2021
S/N Name of Name of Types of sub Screened Land Environmental ESIA Prepared ESMP/PMP Remark/
Woreda subproject site projects/ & proved acquisition Category Prepared &approved implemented Certified
activities (Yes/No) format &approved (Yes/No)
(Yes/No)
Page | 12
Environment and Social Compliance requirement report for DRSLP-I, 2021
(Yes/No)
yes No ESMP PMP
Water borehole Yes yes III Yes yes No
infrastructure HPM Yes yes III Yes yes yes
1 Adaar
Rangeland PTC Yes yes III yes yes
Livestock inf AHP Yes yes III yes yes
Micro dame Yes yes III Yes Yes No
Water Bore holes Yes Yes III Yes Yes No
infrastructure Line distribution Yes Yes III Yes Yes No
2 Elidaar Birka Yes Yes III Yes Yes No
Rangeland PTC Yes Yes III Yes
LMC Yes Yes III Yes
Livestock inf
Access road Yes III Yes
Water Borehole Yes Yes III Yes Yes No
infrastructure Pond Yes Yes III Yes Yes Yes
Rangeland
Erupt PTC Yes Yes III Yes Yes
management
Livestock LMC Yes Yes III Yes
market and
3 trade AHP Yes Yes III Yes
Page | 13
Environment and Social Compliance requirement report for DRSLP-I, 2021
Completed by: [Name Tamiru Lekicho , Email: [email protected] Phone: -+251945149754-]
Position: [focal Person of ESSS for DRSLP-I Afar Region]
Date: [15 /7/2021]
Page | 14
Environment and Social Compliance requirement report for DRSLP-I, 2021