DRSLP I ES Compliance Requirement Matrix

The document discusses environmental and social compliance requirements for subprojects under the Drought Resilience and Sustainable Livelihoods Programme in Ethiopia. It notes that subprojects must comply with relevant Ethiopian laws and regulations as well as AfDB safeguard policies. Most subprojects will have localized, minor environmental and social impacts if properly screened and mitigation measures are implemented. Environmental and social impact assessments were conducted for water infrastructure subprojects. Screening checklists were also completed for other subproject types such as livestock marketing centers and animal health facilities.

Uploaded by

kechata6998
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views14 pages

DRSLP I ES Compliance Requirement Matrix

The document discusses environmental and social compliance requirements for subprojects under the Drought Resilience and Sustainable Livelihoods Programme in Ethiopia. It notes that subprojects must comply with relevant Ethiopian laws and regulations as well as AfDB safeguard policies. Most subprojects will have localized, minor environmental and social impacts if properly screened and mitigation measures are implemented. Environmental and social impact assessments were conducted for water infrastructure subprojects. Screening checklists were also completed for other subproject types such as livestock marketing centers and animal health facilities.

Uploaded by

kechata6998
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Federal Democratic Republic of Ethiopia

Ministry of Agriculture

Drought Resilience and Sustainable Livelihoods Programme-

Ethiopia Project (DRSLP I) Financed by AfDB

ENVIRONMENTAL AND SOCIAL COMPLIANCE REQUIREMENT REPORT

JULY, 2021

ADDIS ABABA, ETHIOPIA

Page | 1
Environment and Social Compliance requirement report for DRSLP-I, 2021
Environmental and social management requirements
The selection, planning, design and implementation of the subprojects under DRSLP have to be
consistent with the relevant national environmental and social management requirements as well
as the Africa Development Bank safeguards policies applicable to the program and its
subprojects and international conventions. In each case, national, regional, woreda and local
institutions to be involved in screening, reviewing and approving subprojects; and they were
carrying out their respective roles and responsibilities. The responsibilities may include
identification of subprojects, screening, conducting environmental and social assessment (ESA),
and reviewing the ESA report for ensuring compliance to obligatory requirements under laws
and regulations, and issuing approvals for subproject implementation.
Most of the subprojects planned under the DRSLP were vary in a scale. Due to some of the
DRSLP subproject like development and management of small scale dam, micro-irrigation
infrastructures subprojects, Animal Health post and PVC, PTC, construction of rural feeder road,
construction of market center, Rangeland management, and some of the negative environmental
and social impacts due to these subprojects may have localized impact but less sensitive, site
specific and perhaps reversible environmental impacts if appropriate screening was done and if
such impacts are not considered with regard to their locations or in the design of the subprojects.

Adverse Environmental and social impacts should be avoided, if possible or appropriately


mitigated and compensated while implementing any project activities. In such critical context, it
is relevant to prepare a safeguard guideline or implementation manual that can integrate
environmental and social safeguard issues at any levels of project life cycle so as to ultimately
ensure project sustainability.
The processes, procedures and institutional arrangements for addressing adverse environmental
and social concerns when identifying, preparing, approving and implementing subprojects are
defined in generic steps in this ESMF. When demand-driven subprojects are identified and
prepared at Kebele level by the communities or groups, these subprojects were screened at
Kebele level through environmental and social screening checklists prepared for this purpose.
Similarly, these subprojects were screened, ESIA (ESMP/ESIA) carried out, reviewed, and
approved at Woreda levels.

Page | 2
Environment and Social Compliance requirement report for DRSLP-I, 2021
The potential environmental and social impacts were identified by ESIA study and prepared
ESMP for implementation of mitigation measures for identified adverse impacts (18 in Afar and
42 out (23 were constructed) in Somale) 60 water infrastructures including micro dam, BH,
Birka pond, HDW, etc

Screened format, checklist filled and documented for project infrastructures such as 13 LMCs,
21 PTCs, 27 animal health facilities (24 AHP and 3 PVC) and 5 routes including small bridge
with access road. The total summary is presented on below table (a. for Somale and b. for Afar).

Page | 3
Environment and Social Compliance requirement report for DRSLP-I, 2021
a. Environmental and Social Compliance
Reporting Format for ESS Requirements
Ministry: …. MoA,…… For DRSLP-I
Region: Somali Region ……. Project consolidation
Location No of subprojects with
Type of Sub Quarte
projects/Activities Wored r year
Zone Kebele DR ESMP FA RAP PMP ESIA * Remark
a
Component 1: Natural Resource Management
new borehole Jarar Ararso Waryugle  
new borehole Jarar Ararso Garbadinle  
new borehole Jarar Ararso Dintaab  
new borehole Jarar Birkot Sankadane  
new borehole Jarar Birkot Elhar  
Koraha
k/dahar Elhar  
new borehole y
Koraha
Marsin Gabo gabo  
new borehole y
Koraha
Marsin Weylaguhid  
new borehole y
new borehole Fafen Goljano Kodahle  
new borehole fafen Goljano Anane  
new borehole Fafen Goljano Dalatowga  
new borehole Erar Kubi Gara  
new borehole Sitti Hadagala Biyogara  
new borehole Sitti Hadagala Harisa  
new borehole Sitti Hadagala Hore  
new ponds Dawa Mubarek/ Hawan  
new ponds Dawa Mubarek/ Wal-walo  
new ponds Dawa Mubarek/ Jare  
new ponds Dawa Mubarek/ Mubarek 02  
Borehole Fafan Goljano 01 kabale   conducted in
2015

Page | 4
Environment and Social Compliance requirement report for DRSLP-I, 2021
Rehabilitation
Borehole
Sitti Hadagala 01 kabale   >>
Rehabilitation
Hand Dug Well Sitti Hadigala Waruf/   >>
Kebrideha
Hand Dug Well Korahay r/ Lasdarkele   >>

Pond Jarar Ararso Waryugle/   >>


Pond Erer Kubbi Garaa/   >>
Pond Erer Kubbi Fookdeer/   >>
Pond Erer Kubbi Washako/   >>
Birka Korehay Marsin Marsin/   >>
Birka Korehay Marsin Nusdarik/   >>
Birka Korehay kabridahar Maraato/   >>
Birka Jarar Birkot/ Husaale   >>
Birka Dawa Mubarek/ War-walo   >>
Birka Jarar Ararso Mooyaha   >>
Birka Jarar Birkot/ Gomaar   >>
Birka Jarar Birkot/ Hilay   >>
Birka Korahay Marsin Gabogabo   >>
Birka Korahay Marsin Weylaguhid   >>
Birka Korahay Marsin Iskudonle   >>
Borehole Korehay kabridahar Galdid   >>
Borehole Afder Raaso Raso/   >>
Borehole 1 Dawa Mubarek/ Bidiru/   >>
Borehole 2 Dawa Mubarek/ Ceenyabo   >>
Component 2: Market and Livestock Infrastructures
Hawan and Wal- Conducted
Dawa Mubarak
walo  in 2015
Marsin, Nusdarik,
Construction of new Korehay Marsin Gabagabo and  >>
Animal Health Posts Waylaguhid
Hargaysa-yar and
Afder Raaso
Humbaweyne  >>

Erer Qubbi Harayoco and  >>

Page | 5
Environment and Social Compliance requirement report for DRSLP-I, 2021
Magaalocad
Didinle and Gadid-
Sitti Hadagala
kate  >>
Ararso,
Birkod, Haljid, (Hiley &
Goljano Gomar), (Daleta &
Jarar
and Malkaka) and  >>
Kebridaha Mara’ato.
r
Construction of new
PTCs Dawa Mubarak Bidirtu  >>
Wadiley and
Afder Raaso
Tigder  >>

Sitti Hadagala Gabi  >>


Washaaqo and
Erer Qubbi
Fooq-dheere  >>

Construction of new Fafan Goljano Sanhaskule  >>


PVC Korahay Shilabo Shilabo Town  >>
Kebridaha Kebridahar Town -
Rehabilitation of Korahay
r 01 Kebele  >>
existing LMC
Fafan Babile Cobosha Kebele  >>

conducted in
Erer Kubbi Kubi & Garaa  2017
Construction of feeder Malkaka & Ganbo conducted in
Fafan Goljano
Ase  2018
road
Ton'iley & conducted in
Korahay Marsin
Madahmarodi  2015
Jarar & Marsin
Korahay and Birkod
01 and 02 Kebeles  >>

Dawa Mubarak 02 Kebeles  >>


Construction of new Erer Qubbi 02 Kebeles  >>
LMC Jarar Ararso ararso  >>
Sitti Hadagala hadagalla  >>
Afder Raaso 03 Kebeles  >>
Component 3: Strengthening and Building Community and Institutional Capacity
TOT on Training on sanitation, Hygiene, Environmental and Social All DRSLP Woredas
All DRSLP Conducted in 2016
Safeguards (ESS) management for project staff at regional level for m=69 ,F=21 a total of 90
Zones & 2018
5 days
Sanitation, Hygiene and Social Environmental awareness at woreda m=1800, F=2700 a total of 4500 All DRSLP All DRSLP Woredas Conducted in 2018

Page | 6
Environment and Social Compliance requirement report for DRSLP-I, 2021
level
Zones

Ministry: -------MoA----------Region: Somali


Program/Project Type; (DRSLP I) --
Total Number of Project/Program summary by Woredas: ---------
Date: 30/06/2021

ESIA Prepared &


Approved
Environmental
Prepared
Category approved Remar
Screened &approve Implementati
Total No of sub (in No) k/
S/N Woredas &approved d (in No) on of
projects Certifi
(in No) E EMP/PMP
ed
S
1 2 3 ESIA M
PMP
P
1 Ararso 8 Screened 8 By 8

2 Birkot 9 Screened 9 9
Kabrida
Screened
3 har 6 6 6
Screened
4 Marsin 10 10 10
Screened
5 Raso 6 6 6
Mubare
Screened
6 k 10 10 10
Screened
7 Goljano 9 9 9
Screened
8 Kubi 10 10 10

Page | 7
Environment and Social Compliance requirement report for DRSLP-I, 2021
Hadigall
Screened
9 a 9 9 9

77 all 0 0 77 0 77 0 0 0

Name of Region:
Somali
Program/Project Type; (DRSLP I) ----
Date: 30/06/2021--
Prepared ESMP/
Land &approved PMP
Screene Envir ESIA
Name Types of acquisiti implemen
Name of d& onme Prepared
of sub on ted Remark/
S/N subproje proved ntal &approve (Yes/No)
Wored projects/ format Certified
ct site (Yes/N Categ d (Yes/No)
a activities
o) ory (Yes/No)
N
yes
o
ESMP PMP
Marsi Borehol ye Ongoin
1 e
Water yes III Yes Yes yes
g
n s
Borehol ye Ongoin
2 Kubi e
Water yes III Yes yes yes
g
s
ye Complet
3 Raso Pond Water yes III Yes yes yes
ed
s

Page | 8
Environment and Social Compliance requirement report for DRSLP-I, 2021
K/ ye Ongoin
4 Pond Water yes III Yes yes yes
g
dahar s
Total

List of Outstanding Issues and Responsible Body for Implementation


Name
S/ of Name of Types of Outstanding Responsible body for
Recommended actions Time schedule
N woreda subproject site subprojects Issues implementation
s
Mubare to handover a new site which is
1 Pond Water site change woreda and RPCU completed
k feasible for pond construction

protecting the
2 Ararso BH Water
BH
SWC on the upper side of the BH woreda Ongoing

Completed by: [Name Mohamud Osman, Email: [email protected], Phone: +251972309030]


Position: [Reginal focal Person of ESSS at DRSLP Regional CPU]

b. Environmental Compliance Reporting Format for ESS Requirements


Afar Region…….
Project consolidation for ESSG
No of sub-projects with
Type of Sub Location Quarter
projects/activities year DR ESMP FA RAP PMP ESIA
Woreda kebele
Component 1: Natural Resource Management
Woranso and
Borehole 420m Adaar hormati  
Borehole 450m Adaar Jeldi  
Borehole 362m Adaar Burka  
Borehole Erupt Albo  
Borehole Erupt Andergalo  
Borehole Erupt Fi’ad  

Page | 9
Environment and Social Compliance requirement report for DRSLP-I, 2021
Borehole Elidaar Gewahe  
Borehole Elidaar Elidaar  
Bore hole Hdelela Aftoha  
Borehole Afdera Namagubi  
Micro dam Elidaar Suula  
Birka Elidaar Elidaar  
Birka Elidaar Suula  
Birka Elidaar Manda  
Water pipeline distribution Elidaar Suula  
Maintenance hand pump Adaar Burka 
Maintenance hand pump Adaar Burka 
Maintenance hand pump Adaar Jeldi 
Pond Erupt Adu  
Pond Erupt Adu  
Irrigation canal Hdelela Abake bera  
No of sub-projects with
Type of Sub Location Quarter
projects/activities year DR ESMP FA RAP PMP ESIA
Woreda kebele
Component 1: Natural Resource Management
Adaar Burka 
Adaar Adaar 
Elidaar suulla 
Erupt Albo 
PTC Erupt Erupt 
Hdelela Aftoha 
Hdelela Abake ber 
Afdera kusurawad 
Afdera Ayitura 
Component 2: Market and Livestock Infrastructure
Hdelela Hdelela 
LMC Erupt Adu 
Elidaar Elidaar 

Page | 10
Environment and Social Compliance requirement report for DRSLP-I, 2021
Afdera Aliganda 
Adaar Siylu and woki 
Adaar Burka 
Erupt undergalo 
Animal Health post
Hdelela Leleda 
Geloalo Diyara 
Afdera kusurawad 
Animal Health Center Afdera Ayitura 
Access Road Elidaar Su’ula-karbilo 
Bridge with 4 km feeder Edaforo to
Geloalo 
road under construction Subuli
Component3: Strengthening and Building Community and Institutional Capacity
TOT on Training on sanitation, Hygien, Environmental and Social Safeguards
(ESS) management for project staff at regional level for 5 days m=132, F=5 a total of 137 All DRSLP Zones All DRSLP Woredas

I. Environmental Compliance Reporting Format (summary)


Ministry: -----------MoA------- Region: Afar
Program/Project Type; (DRSLP I)
Total Number of Project/Program Participating Woredas: -----six------ Date: 15 /7/2021

ESIA Prepared & Approved


Total Environmental
Screened
No of Category Prepared Implementation Remark/
S/N Woredas &approved approved (in No)
sub &approved (in No) of EMP/PMP Certified
(in No)
projects
1 2 3 ESIA ESMP PMP

1 Adaar 10 10 10 5 10

2 Elidaar 10 10 1 9 7 10

Page | 11
Environment and Social Compliance requirement report for DRSLP-I, 2021
3 Erupt 9 9 9 4 9

4 Hadelela 5 5 5 1 5

5 6 6 6 1 6
Afdera
Gela'alo/Bure 2
2 2 2
6 Mudaytu

42 42 0 1 41 18 42 0 0 0

List of exceptional Issues and Responsible Body for Implementation of subprojects


Name of
S/ Name of Type of Responsible body for
subproject exceptional issues Recommended Time schedule
N woreda subproject implementation
site
Delay of conflict woreda administration,
1 Adaar Burka Borehole Peace meeting Completed
resolution Regional PLD bureau
Monitoring follow up FPCU, RPCU, Afar
Micro
2 elidaar suula Contractor delays Disruption with Region water Completed
dam
contracture constriction enterprise
-The door and windows RPCU, Woreda
Erupt Adergalo AHP To repair and maintain, Ongoing
3 of the AHP was broken, Administration, Kebele,
The wind blows the Full repairment and
roof, Site selection maintain ace, Concrete
Livestock FPCU, RPCU, WPCU,
Afdera AHC problem. Drug and fence may recommend, Ongoing
infr. Regional LANRD
other chemicals stored Remove and dispose the
4 in the AHC drugs and chemicals.
Name of Region: Afar
Program/Project Type; (DRSLP I)
Project summary by each woredas

Date: 15 /7/2021
S/N Name of Name of Types of sub Screened Land Environmental ESIA Prepared ESMP/PMP Remark/
Woreda subproject site projects/ & proved acquisition Category Prepared &approved implemented Certified
activities (Yes/No) format &approved (Yes/No)
(Yes/No)

Page | 12
Environment and Social Compliance requirement report for DRSLP-I, 2021
(Yes/No)
yes No ESMP PMP
Water borehole Yes yes III Yes yes No
infrastructure HPM Yes yes III Yes yes yes
1 Adaar
Rangeland PTC Yes yes III yes yes
Livestock inf AHP Yes yes III yes yes
Micro dame Yes yes III Yes Yes No
Water Bore holes Yes Yes III Yes Yes No
infrastructure Line distribution Yes Yes III Yes Yes No
2 Elidaar Birka Yes Yes III Yes Yes No
Rangeland PTC Yes Yes III Yes
LMC Yes Yes III Yes
Livestock inf
Access road Yes III Yes
Water Borehole Yes Yes III Yes Yes No
infrastructure Pond Yes Yes III Yes Yes Yes
Rangeland
Erupt PTC Yes Yes III Yes Yes
management
Livestock LMC Yes Yes III Yes
market and
3 trade AHP Yes Yes III Yes

Water Bore hole Yes Yes III Yes Yes Yes


infrastructure Irrigation canal Yes Yes II Yes Yes Yes
4 Hadelela Rangeland
PTC Yes yes III Yes Yes
Development
AHP Yes yes III Yes Yes
Livestock infr.
LMC Yes Yes III Yes Yes
Bridge Yes Yes III Yes Yes
5 Gelalo Livestock infr.
AHP Yes Yes III Yes Yes
Water
Bore hole Yes Yes III Yes Yes Yes
infrastructure
Rangeland
PTC Yes Yes III Yes Yes
6 Afdera Development
AHP Yes Yes III Yes Yes
Livestock infr. AHC Yes Yes III Yes Yes
LMC Yes Yes III Yes Yes

Page | 13
Environment and Social Compliance requirement report for DRSLP-I, 2021
Completed by: [Name Tamiru Lekicho , Email: [email protected] Phone: -+251945149754-]
Position: [focal Person of ESSS for DRSLP-I Afar Region]
Date: [15 /7/2021]