SVSW-007002-P05-0001 Rev B Factory Acceptance Test Procedure - Code 1

This document describes the factory acceptance test for a wellhead control panel and hydraulic pressure unit. It provides project details such as the customer, equipment, tag number, manufacturer, and release status. Test check sheets are included to inspect and test items like low voltage cables and electrical motors. Upon completion, representatives from the manufacturer, customer and joint operating company will sign off on the test results.

Uploaded by

chuminh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views186 pages

SVSW-007002-P05-0001 Rev B Factory Acceptance Test Procedure - Code 1

This document describes the factory acceptance test for a wellhead control panel and hydraulic pressure unit. It provides project details such as the customer, equipment, tag number, manufacturer, and release status. Test check sheets are included to inspect and test items like low voltage cables and electrical motors. Upon completion, representatives from the manufacturer, customer and joint operating company will sign off on the test results.

Uploaded by

chuminh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 186

FACTORY ACCEPTANCE TEST

PROJECT DESCRIPTION : STV EXTENSION – STV SOUTH WEST PROJECT

CUSTOMER : CUU LONG JOINT OPERATING COMPANY

EQUIPMENT : WELLHEAD CONTROL PANEL & HYDRAULIC


PRESSURE UNIT

TAG NO. : WHCP-2880

PURCHASE ORDER NO. : 147-2014/PTSCMC-TM/MHH-E

JOB NO. : C013/2860

MANUFACTURER : CONTROL AUTOMATION PTE. LTD.

LOCATION : SINGAPORE

RELEASE STATUS :

EX WORKS DATE :

Outstanding Items see Punch List page (If Applicable)

CAPL PTSC

Name Name

Sign Sign

Date Date

CUU LONG JOC

Name

Sign

Date

Page 20 of 20
Appendix-I
Page 1 of 1
Revision No.: A

APPENDIX - I

CHECK SHEET INDEX

Check Sheet Name Description

ELECTRICAL

E1 Low Voltage Cable

E2 Low Voltage Electrical Motor


STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-5 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS Su Tu Vang South West

Low Voltage Cable E1 Sheet 1 of 1


INFORMATION
Tag Number : EL-PBE-2880L-6 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : LIGHTING Description :
From Equip : SELECTOR SWITCH To Equip : LIGHTING FIXTURES
Core No. : 4 CORES Size (Sq.mm) : 2.5 mm2
Gland A Type : ICG 653/UNIV Gland B type : ICG 653/UNIV
Cable Spec. : TYPE L3 Voltage : 120 VAC
Layout Dwg : CO132860/WHCP/ES&WD Cable Sched :

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
Cables installed, identified, dressed, cleaned, rack/tray support, segregation and bending radius as per project
1.01
specification and design
1.02 Cable type and size in accordance with cable schedule.
Cable gland type and size in accordance with cable schedule. Check that barrier glands are installed (where
1.03
required)
1.04 Glanding, phase identification and termination kits, correctly installed to specification
1.05 Earthing arrangement correct to project specifications
1.06 Cable cores ferruled and terminated correctly
2 Testing

Continuity & insulation resistance checks

1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.

Minimum Core to Core Insulation Resistance .............. Meg Ohm.


2.01
Minimum Core to Earth Insulation Resistance .............. Meg Ohm.

2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.

Maximum measured Continuity Resistance ..............Ohms.

3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Low Voltage Electrical Motor E2 Sheet 1 of 1


INFORMATION
Tag Number : PBE-2880A Description : HP PUMP MOTOR
System : WELLHEAD CONTROL PANEL Description :
Sub-System : HP HEADER Description :
Voltage : 460 VAC FLC :
Frequency : 60 Hz KW/HP : 1.5 / 2
Manufacture : BALDOR RPM : 1755
Serial No. : 05F979W836G1 EX class : CLASS 1 DIV 2
Class : T3, GR C, D

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
1.01 Check the nameplate data against specification
1.02 Suitable Ex / IP certification for location
1.03 If installed check winding RTD's, and motor terminations are correct
1.04 Check for any mechanical damage, all bolts and blanking plugs fitted. Ex. equipment flange faces lightly greased
1.05 Check cable glanding, and motor terminations, Star / Delta links, correct to project drawings
1.06 Earthing to project specification
1.07 Mark up As-Built installation drawings
1.08 Record any defects on a system punchlist

2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Low Voltage Electrical Motor E2 Sheet 1 of 1


INFORMATION
Tag Number : PBE-2880B Description : HP PUMP MOTOR
System : WELLHEAD CONTROL PANEL Description :
Sub-System : HP HEADER Description :
Voltage : 460 VAC FLC :
Frequency : 60 Hz KW/HP : 1.5 / 2
Manufacture : BALDOR RPM : 1755
Serial No. : 05F979W836G1 EX class : CLASS 1 DIV 2
Class : T3, GR C, D

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
1.01 Check the nameplate data against specification
1.02 Suitable Ex / IP certification for location
1.03 If installed check winding RTD's, and motor terminations are correct
1.04 Check for any mechanical damage, all bolts and blanking plugs fitted. Ex. equipment flange faces lightly greased
1.05 Check cable glanding, and motor terminations, Star / Delta links, correct to project drawings
1.06 Earthing to project specification
1.07 Mark up As-Built installation drawings
1.08 Record any defects on a system punchlist

2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Low Voltage Electrical Motor E2 Sheet 1 of 1


INFORMATION
Tag Number : PBE-2883 Description : RE-CIRCULATION PUMP MOTOR
System : WELLHEAD CONTROL PANEL Description :
Sub-System : HP HEADER Description :
Voltage : 460 VAC FLC :
Frequency : 60 Hz KW/HP : 1.5 / 2
Manufacture : BALDOR RPM : 1755
Serial No. : 05F979W836G1 EX class : CLASS 1 DIV 2
Class : T3, GR C, D

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
1.01 Check the nameplate data against specification
1.02 Suitable Ex / IP certification for location
1.03 If installed check winding RTD's, and motor terminations are correct
1.04 Check for any mechanical damage, all bolts and blanking plugs fitted. Ex. equipment flange faces lightly greased
1.05 Check cable glanding, and motor terminations, Star / Delta links, correct to project drawings
1.06 Earthing to project specification
1.07 Mark up As-Built installation drawings
1.08 Record any defects on a system punchlist

2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Low Voltage Electrical Motor E2 Sheet 1 of 1


INFORMATION
Tag Number : PBE-2880C Description : HP PUMP MOTOR
System : WELLHEAD CONTROL PANEL Description :
Sub-System : HP HEADER Description :
Voltage : 460 VAC FLC :
Frequency : 60 Hz KW/HP : 7.5 / 10
Manufacture : BALDOR RPM : 1760
Serial No. : 07M600X813G1 EX class : CLASS 1 DIV 2
Class : T3, GR C, D

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
1.01 Check the nameplate data against specification
1.02 Suitable Ex / IP certification for location
1.03 If installed check winding RTD's, and motor terminations are correct
1.04 Check for any mechanical damage, all bolts and blanking plugs fitted. Ex. equipment flange faces lightly greased
1.05 Check cable glanding, and motor terminations, Star / Delta links, correct to project drawings
1.06 Earthing to project specification
1.07 Mark up As-Built installation drawings
1.08 Record any defects on a system punchlist

2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Low Voltage Electrical Motor E2 Sheet 1 of 1


INFORMATION
Tag Number : PBE-2880D Description : HP PUMP MOTOR
System : WELLHEAD CONTROL PANEL Description :
Sub-System : HP HEADER Description :
Voltage : 460 VAC FLC :
Frequency : 60 Hz KW/HP : 7.5 / 10
Manufacture : BALDOR RPM : 1760
Serial No. : 07M600X813G1 EX class : CLASS 1 DIV 2
Class : T3, GR C, D

INSPECTION/TEST OK N/A P/L No


1 Inspection Checklist
1.01 Check the nameplate data against specification
1.02 Suitable Ex / IP certification for location
1.03 If installed check winding RTD's, and motor terminations are correct
1.04 Check for any mechanical damage, all bolts and blanking plugs fitted. Ex. equipment flange faces lightly greased
1.05 Check cable glanding, and motor terminations, Star / Delta links, correct to project drawings
1.06 Earthing to project specification
1.07 Mark up As-Built installation drawings
1.08 Record any defects on a system punchlist

2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
Appendix-II
Page 1 of 1
Revision No.: A

APPENDIX - II

CHECK SHEET INDEX

Check Sheet Name Description

INSTRUMENT

I01 Instrument Cable

I02 Instrument Cold Loop Check


STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : LZT-2880-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Level Transmitter- LZT-2800-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PZT-2880-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PZT-2880-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PZT-2880-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PZT-2880-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2944-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2944-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2945-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2945-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2946-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2946-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2947-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2947-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2948-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2948-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2880A-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2880A-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PT-2880C-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Pressure Transmitter- PT-2880C-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2881-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Diff. Pressure Transmitter- DPT-2881-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2882-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Diff. Pressure Transmitter- DPT-2882-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2883-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBA-2880-01 To Equip : Diff. Pressure Transmitter- DPT-2883-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2944-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2944-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2944-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2945-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2945-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2945-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip :Solenoid Valve- SDY-2946-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2946-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2946-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip :Solenoid Valve- SDY-2947-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2947-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2947-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2948-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2948-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-2948-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3044-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-3044-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3045-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-3045-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3046-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-3046-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3047-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-3047-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3048-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- SDY-3048-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : ESD2-2880-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- ESD2-2880-2
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.5 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : ESD3-2880-3 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-01 To Equip : Solenoid Valve- ESD3-2880-3
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : HAWKE - 501/453/UNIV
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.5 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-SCSSV-O Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : SCSSV Open PB- HS-SCSSV-O
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-SCSSV-C Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : SCSSV Close PB- HS-SCSSV-C
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-SSV-O Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : SSV Open PB- HS-SSV-O
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-SSV-C Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : SSV Close PB- HS-SSV-C
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-WV-O Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : WV Open PB- HS-WV-O
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-WV-C Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : WV Close PB- HS-WV-C
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-LGV-O Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : LGV Open PB- HS-LGV-O
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-LGV-C Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : LGV Close PB- HS-LGV-C
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : Well Selection Discrepancy Alarm- XA-2880-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PB-ESD-2-WCP Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : ESD-2 WHCP/HPU PB - PB-ESD-2-WCP
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : PB-ESD-3-WCP Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : ESD-3 WHCP/HPU PB - PB-ESD-3-WCP
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1B Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880A START- HS-2880A-1B
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1A Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880A START- HS-2880A-1A
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1B Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880B STOP- HS-2880B-1B
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1A Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880B START- HS-2880B-1A
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1B Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880C STOP- HS-2880C-1B
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1A Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880C START- HS-2880C-1A
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1B Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880D STOP- HS-2880D-1B
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1A Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880D START- HS-2880D-1A
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2883-1B Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP PBE-2883 STOP- HS-2883-1B
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2883-1A Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP PBE-2883 START- HS-2883-1A
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 5 CORE
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880A-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880A STATUS- XA-2880A-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880B-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880B STATUS- XA-2880B-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880C-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880C STATUS- XA-2880C-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880D-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2880D STATUS- XA-2880D-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : XA-2883-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-03 To Equip : PUMP P-2883 STATUS- XA-2883-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I1 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880A-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880A-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880B-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
Cable Size : 1.0 mm2 Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880B-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880C-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880C-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880D-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880D-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880E-1-2 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880-E-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880E-1-1 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : Well Selection Illuminated PB
HS-2880-E-1
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2944-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : USD for Individual Well PB
HZ-2944-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2945-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : USD for Individual Well PB
HZ-2945-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2946-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : USD for Individual Well PB
HZ-2946-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2947-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : USD for Individual Well PB
HZ-2947-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cable I01 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2948-4 Description :
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :
From Equip : PJBD-2880-04 To Equip : USD for Individual Well PB
HZ-2948-4
Gland A Type : HAWKE - 501/453/UNIV Gland B Type : N/A
Cable Type : I3 Sheath Colour : GREY
2
Cable Size : 1.0 mm Pair/Core : 1 PR
Rated Voltage : 250 V Cable Sched :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist
1.01 Cable number is correct. Type and size are in accordance with the cable schedule
1.02 Cable segregation satisfactory
1.03 Cable correctly supported and mechanically protected along it's entire length
1.04 Cable dressed correctly and bend radius within specification
1.05 Cable earthed in accordance with reference drawing
1.06 Cable screen made-off correctly
Cable glanded correctly, ensure that the correct gland is installed. Barrier gland installed (where required).
1.07
Cable terminated correctly.
1.08 Cable cores ferruled correctly
1.09 Cable cores terminated correctly
2 Testing
MEGGER testing of cable to be carried out whilst cable is on the drum only (as per details in section 2.02)
2.01
Cable shall NOT be Meggered after cable has been terminated.
The cable insulation resistance is to be checked using a 250V / 500V Megger. (according to the cable rating)
Minimum acceptable resistance is 100 Meg Ohms. Each core is to be tested against all other cores, and earth.
The minimum measured insulation resistance is to be recorded below for core to core and core to earth.
2.02
Minimum Core to Core Insulation Resistance = Meg Ohms.

Minimum Core to Earth Insulation Resistance = Meg Ohms.

The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.

3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : LZT-2880-1 Description : Level Transmitter - Hydraulic Tank
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PZT-2880-1 Description : Pressure Transmitter - HP Header Pressure
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PZT-2880-2 Description : Pressure Transmitter- MP Header Pressure
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2944-4 Description : Pressure Transmitter - SCSSV
Output Pressure, Well 2844
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2945-4 Description : Pressure Transmitter - SCSSV
Output Pressure, Well 2845
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2946-4 Description : Pressure Transmitter - SCSSV
Output Pressure, Well 2846
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2947-4 Description : Pressure Transmitter - SCSSV
Output Pressure, Well 2847
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2948-4 Description : Pressure Transmitter - SCSSV
Output Pressure, Well 2848
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2880A-1 Description : Pressure Transmitter - HP Hydraulic
Pumps Pressure Header
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PT-2880C-1 Description : Pressure Transmitter - MP Hydraulic
Pumps Pressure Header
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2881-1 Description : Differential Pressure Transmitter -
MP Pumps Suction Filter
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2882-1 Description : Differential Pressure Transmitter -
HP Pumps Suction Filter
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : DPT-2883-1 Description : Differential Pressure Transmitter -
Re-circulation Pump Suction Filter
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-1 Description : Solenoid Valve - Open/Close SCSSV
Well 2844
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-2 Description : Solenoid Valve - Open/Close SSV
Well 2844
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2944-3 Description : Solenoid Valve - Open/Close WV
Well 2844
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-1 Description : Solenoid Valve - Open/Close SCSSV
Well 2845
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-2 Description : Solenoid Valve - Open/Close SSV
Well 2845
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2945-3 Description : Solenoid Valve - Open/Close WV
Well 2845
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-1 Description : Solenoid Valve - Open/Close SCSSV
Well 2846
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-2 Description : Solenoid Valve - Open/Close SSV
Well 2846
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2946-3 Description : Solenoid Valve - Open/Close WV
Well 2846
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-1 Description : Solenoid Valve - Open/Close SCSSV
Well 2847
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-2 Description : Solenoid Valve - Open/Close SSV
Well 2847
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2947-3 Description : Solenoid Valve - Open/Close WV
Well 2847
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-1 Description : Solenoid Valve - Open/Close SCSSV
Well 2848
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-2 Description : Solenoid Valve - Open/Close SSV
Well 2848
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-2948-3 Description : Solenoid Valve - Open/Close WV
Well 2848
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3044-1 Description : Solenoid Valve - Open/Close LGV
Well 2844
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3045-1 Description : Solenoid Valve - Open/Close LGV
Well 2845
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3046-1 Description : Solenoid Valve - Open/Close LGV
Well 2846
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3047-1 Description : Solenoid Valve - Open/Close LGV
Well 2847
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : SDY-3048-1 Description : Solenoid Valve - Open/Close LGV
Well 2848
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : ESD2-2880-2 Description : Solenoid Valve - ESD 2
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : ESD3-2880-3 Description : Solenoid Valve - ESD 3
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-SCSSV-O Description : SCSSV Open PB - HS-SCSSV-O
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-SCSSV-C Description : SCSSV Close PB - HS-SCSSV-C
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-SSV-O Description : SCSSV Open PB - HS-SSV-O
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-SSV-C Description : SCSSV Close PB - HS-SSV-C
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-WV-O Description : SCSSV Open PB - HS-WV-O
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-WV-C Description : SCSSV Close PB - HS-WV-C
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-LGV-O Description : SCSSV Open PB - HS-LGV-O
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-LGV-C Description : SCSSV Close PB - HS-LGV-C
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880-1 Description : Well Selection Discrepancy Alarm -
XA-2880-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PB-ESD-2-WCP Description : ESD-2 WHCP/HPU PB - PB-ESD-2-WCP
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : PB-ESD-3-WCP Description : ESD-3 WHCP/HPU PB - PB-ESD-3-WCP
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1B Description : PUMP P-2880A STOP- HS-2880A-1B
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1A Description : PUMP P-2880A START- HS-2880A-1A
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1B Description : PUMP P-2880B STOP- HS-2880B-1B
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1A Description : PUMP P-2880B START- HS-2880B-1A
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1B Description : PUMP P-2880C STOP- HS-2880C-1B
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1A Description : PUMP P-2880C START- HS-2880C-1A
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1B Description : PUMP P-2880D STOP- HS-2880D-1B
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1A Description : PUMP P-2880D START- HS-2880D-1A
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2883-1B Description : PUMP PBE-2883 STOP- HS-2883-1B
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2883-1A Description : PUMP PBE-2883 START- HS-2883-1A
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880A-1 Description : PUMP P-2880A STATUS- XA-2880A-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880B-1 Description : PUMP P-2880B STATUS- XA-2880B-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880C-1 Description : PUMP P-2880C STATUS- XA-2880C-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2880D-1 Description : PUMP P-2880D STATUS- XA-2880D-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : XA-2883-1 Description : PUMP P-2883 STATUS- XA-2883-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1-2 Description : Well Selection Illuminated PB
HS-2880A-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880A-1-1 Description : Well Selection Illuminated PB
HS-2880A-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1-2 Description : Well Selection Illuminated PB
HS-2880B-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880B-1-1 Description : Well Selection Illuminated PB
HS-2880B-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1-2 Description : Well Selection Illuminated PB
HS-2880C-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880C-1-1 Description : Well Selection Illuminated PB
HS-2880C-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1-2 Description : Well Selection Illuminated PB
HS-2880D-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880D-1-1 Description : Well Selection Illuminated PB
HS-2880D-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880E-1-2 Description : Well Selection Illuminated PB
HS-2880E-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HS-2880E-1-1 Description : Well Selection Illuminated PB
HS-2880E-1
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2944-4 Description : USD for Individual Well PB
HZ-2944-4
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2945-4 Description : USD for Individual Well PB
HZ-2945-4
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2946-4 Description : USD for Individual Well PB
HZ-2946-4
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2947-4 Description : USD for Individual Well PB
HZ-2947-4
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date
STV EXTENSION - STV SOUTH WEST PROJECT (SVSW)
EPCI FOR WHP-SVSW, PIPELINES AND CPP MODIFICATIONS
Su Tu Vang South West

Instrument Cold Loop Check I02 Sheet 1 of 1


INFORMATION
Tag Number : HZ-2948-4 Description : USD for Individual Well PB
HZ-2948-4
System : WELLHEAD CONTROL PANEL Description :
Sub-System : Description :

INSPECTION/TEST OK N/A P/L No


Item
1 Inspection Checklist

1.01 Confirm all relevant loop components, both Electrical and Instrument

Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.

Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10

Comments:-

Tested By Verified By Approved By


Company CAPL PTSC CLJOC
Name
Signature
Date