APPENDIX - I
ELECTRICAL
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
1. The cable insulation resistance is to be checked using a 500V Megger. Minimum acceptable resistance is
100 Meg Ohm. Each core is to be tested against all other cores, and earth. The minimum measured insulation
resistance is to be recorded bellow for core to core, and core to earth.
2. The cable continuity is to be tested using a suitable multimeter, set to Ohms maximum permissible resistance
should not exceed 0.5 Ohms.
3 Testing
Make: Model: Serial No.: Calibration Expiry:
Make: Model: Serial No.: Calibration Expiry:
Comments:-
2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-
2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-
2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-
2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-
2 Insulation Checklist
Test and record the motor winding resistance:-
L1 - L2 = ohm
2.01
L2 - L3 = ohm
L1 - L3 = ohm
Test and record the motor insulation resistance:-
2.02
Test Result = MΩ
Comments:-
APPENDIX - II
INSTRUMENT
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
The cable continuity is to be tested using a suitable multimeter, set to the Ohms range, maximum permissible
resistance should not exceed 0.5 Ohms
2.03
Maximum measured Continuity Resistance = Ohms.
3 Testing
Make: Model: Serial No.: Calibration Cert. No.:
Make: Model: Serial No.: Calibration Cert. No.:
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-
1.01 Confirm all relevant loop components, both Electrical and Instrument
Confirm all Cabling / Terminations / Earthing / Pipework conforms to project specifications and is correctlly
1.02
installated as per Loop drawings and Hook Up diagrams.
Confirm that all loop components of EX and IP rating are correct for the hazardous area in which they are installed.
1.03
(Check against Hazardous Area Drawings).
Confirm loop detail are correct against all Project / Vendor information.
1.04 i.e. P & ID's, I/O schedule, Data sheet / Instrument index / Alarm & Trip schedule (including Rack / Slot / Channel
location for all I/O device(s).
Using certified test equipment confirm the loop installation, and verify the loop polarity is correct at the
1.05
Marshalling Cabinet and the field device (s)
2 Loop Check:
Loop Tag No. Field Device Tag No.
1
2
3
4
5
6
7
8
9
10
Comments:-