QF-DEV-01 APQP Time Chart 01.03.2020

This document provides a time-line chart for advanced product quality planning of a new product or similar product type. It outlines 43 key activities organized into 5 phases: 1) Plan & Define, 2) Product Design & Development, 3) Process Design, 4) Product & Process Validation, and 5) Feedback Assessment & Corrective Action. The timeline spans from December 2018 through August 2019 and identifies target start and completion dates for each activity.

Uploaded by

Manoj Hedaoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
229 views

QF-DEV-01 APQP Time Chart 01.03.2020

This document provides a time-line chart for advanced product quality planning of a new product or similar product type. It outlines 43 key activities organized into 5 phases: 1) Plan & Define, 2) Product Design & Development, 3) Process Design, 4) Product & Process Validation, and 5) Feedback Assessment & Corrective Action. The timeline spans from December 2018 through August 2019 and identifies target start and completion dates for each activity.

Uploaded by

Manoj Hedaoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Doc.

No : QF/DEV/01

R Engineerings Pvt. Ltd. ADVANCED PRODUCT QUALITY PLANNING TIME-LINE CHART Rev.No : 03

Date : 01.03.2020

Original Date : Categories of Product NEW PRODUCT NEW PRODUCT(Similar type) ECN/PCN Layout Change Location Change

Customer Name : Part No. : Part Name :

Project Completion Target Date : Team Leader Sign :

Sample Trial Date: Plant Head Sign :

Customer Events : Sample Approval: Core Team : Plant Head, Marketing, D & D, Production, Quality, Purchase PCB Manufacture

SOP: Vendor Events : Stencil Manufacture


Sr.
Review Freq. :Weekly/Fortnightly.

Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19


Target / Completion
Activity Planning Start Date Status Remarks
Date
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5

PHASE 1 - PLAN & DEFINE


No.

1 Receipt Of Drawing or reference of sample

2 CFT Formation

3 Design Input review & Feasibility study

4 Details of past defects for similar components

5 Preliminary bill of material

6 Preliminary process flow chart

Preliminary list of special product / process


7
characteristics

8 Preparation APQP Timing Plan

PHASE 2 - PRODUCT DESIGN & DEVELOPMENT

9 DFM & DFA

10 Engg. Specifications

11 Material specifications

12 DFMEA

13 Review of DFMEA

14 Prototype - Control plan

15 Prototype Sample Trial

16 Design verification

17 Design reviews

18 Sample Submission & Customer review

Development & manufacturing of Die / Tool /


19
PCB / Gauge/ Fixture/Jig

20 Process flow chart

21 PFMEA

22 Pre-launch control plan

23 Preparation of Work Instruction


Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19
Target / Completion
Activity Planning Start Date Status Remarks
Date
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5

No.
Training to concerned Supervisor , Operator
24
and Inspector

25 Sample Trial

26 Sample Submission and review with Customer

27 Packaging specifications

28 Floor plan layout

29 Process Output Review

30 SPC & MSA plan

PHASE 4 - PRODUCT & PROCESS VALIDATION

31 Production trial run(Pilot Lot)

32 Measurement System Analysis & Evaluation

33 Preliminary Product & Process capability study

34 Product & Process Validation & Testing

35 Preparation of PPAP Documents

Submit Pilot Lot & PPAP Documents and Review


36
with Customer

Preparation of Production & Process Control


37
Plan

38 Review of control plan

39 Quality planning Sign-off

PHASE 5 - Feedback Assessment & Corrective Action

40 Review of TGW & TGR

41 Delivery & service

Update APQP (APQP timing plane or other


Document ) whenever required based on
42 Review done &customer Feedback after SOP at
customer Identify stage also do PDCA for any
quality issue (observed in project)

43 Start of Initial Production Control

CFT Review

Top Management Review

Note : 1) Weekly CFT Meeting Should be conducted & Plant head/Top Management (Drop Box Review)review should be Fortnightly (IF Development lead time ≤ 2 Months)

2) Fortnightly CFT Meeting Should be conducted & Plant head/Top Management (Drop Box Review) review should be Monthly (IF Development lead time ≥ 2 Months)

Sign Off :

1) HEAD D & D : _____________________ 4) HEAD PROD : _____________________

2) HEAD MKT : ______________________ 5) HEAD PUR : ______________________

3) HEADQA : ______________________ 6) PLANT HEAD : ______________________

Prepared By : Approved By :
Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19
Target / Completion
Activity Planning Start Date Status Remarks
Date
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5

No.