The document outlines the test plan for WhatsApp. It details the objectives to ensure reliability, functionality, compatibility and security. Both manual and automated testing will be used, including unit, integration, system and acceptance testing. The plan assumes a stable test environment and developer support. Risks include delays, compatibility issues and additional security testing needs. Testing will occur over 6 weeks with all defects tracked.
The document outlines the test plan for WhatsApp. It details the objectives to ensure reliability, functionality, compatibility and security. Both manual and automated testing will be used, including unit, integration, system and acceptance testing. The plan assumes a stable test environment and developer support. Risks include delays, compatibility issues and additional security testing needs. Testing will occur over 6 weeks with all defects tracked.
Ensure that WhatsApp meets all functional and non-
functional requirements. Identify and fix all bugs before the release of the application. Ensure that WhatsApp is a high-quality, user-friendly application. 1. Ensure the reliability and performance of the Objectives WhatsApp application. 2. Validate the functionality of core features such as messaging, calls, and multimedia sharing. 3. Verify compatibility with various devices and operating systems. 4. Assess security measures and data privacy.
All functional and non-functional requirements of
WhatsApp are in scope. The following features are out Scope of scope: WhatsApp Pay, WhatsApp Business, WhatsApp Web/Desktop A combination of manual and automated testing will be used. Manual testing will be used for complex Test Methodology scenarios and to verify usability. Automated testing will be used for regression testing and to verify performance. The following testing phases will be executed: Unit testing, Integration testing, System testing, Approach Acceptance testing. The following testing techniques will be used: Black box testing, White box testing, Grey box testing. The test environment is stable and reliable. The test data is accurate and complete. The developers are available to fix bugs. Assumptions . The development team will provide regular builds for testing. 2. Test environments will simulate real-world usage conditions. The test environment may not be stable or reliable. The test data may not be accurate or complete. The developers may not be available to fix bugs. 1. Delays in development may affect the testing Risks schedule. 2. Compatibility issues with various devices and OS versions. 3. Data privacy concerns may require additional security testing. The test plan will be executed over a period of 6 Schedule weeks. Defect Tracking All defects will be tracked in a bug tracking system.
Test Deliverables Test plan, Test cases, Test reports