Chapter 5 Learning Objectives
After completing this chapter, students will be able to:
Understand the importance of scope management for
project success.
Understand the significance of developing a scope
statement.
Construct a Work Breakdown Structure for a project.
Develop a Responsibility Assignment Matrix for a
project.
Describe the roles of changes and configuration
management in assessing project scope.
Deliverables are
1.2.1 1.3.1 major project
components
1.2.2 1.3.2
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Figure 5.7 05-12
Defining a Work Package
Lowest level in WBS
Deliverable result
One owner
Miniature projects
Milestones
Fits organization
Trackable
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Figure 5.8 05-15
Cost Account Rollup Using OBS
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Figure 5.10 05-16
Responsibility Assignment Matrix
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Figure 5.11 05-17
Defining a Project Work Package
1. Work package forms lowest level in WBS.
2. Work package has a deliverable result.
3. Work package has one owner.
4. Work package may be considered by its owner as a
project in itself.
5. A work package may include several milestones.
6. A work package should fit organizational procedures and
culture.
7. The optimal size of a work package may be expressed in
terms on labor hours, calendar time, cost, reporting
period, and risks.
o Design
o Trend monitoring
o Document
o Acquisition
o Specification