SP4150284 Rev2 Proposed Roof Layout
SP4150284 Rev2 Proposed Roof Layout
A GENERAL NOTES A
10917 3518
1. ALL DIMENSIONS ARE IN MILLIMETRES (MM) UNLESS NOTED OTHERWISE.
755 2355 4639 2412 755 2. USE MEASURED DIMENSIONS ONLY, DO NOT SCALE.
T
IN
533x210x82 UB FIXED 533x210x82 UB FIXED
18
+
JO
0x
M
18 O TER
TO 440 lg x 215 x 215 TO 440 lg x 215 x 215 3. ALL DIMENSIONS ARE TO BE CHECKED AND VERIFIED ON SITE. IT SHALL BE THE
T
OV
80
EN
0x VE NA
+ N IN
ON
x8
EM
EM
80 ME L
C40 PADSTONE USING C40 PADSTONE USING CONTRACTOR'S RESPONSIBILITY TO IDENTIFY DISCREPANCIES TO SP ENERGY
M
O
AN
IN
x8 N SK
EN
OV
TE
NETWORKS ENGINEER.
CO
2No. M20 BOLTS. T 2No. M20 BOLTS.
AN T J IN
R
JO
N
C O O IN S
NA
IN
W
L
N T
T
P2
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWINGS
SK
W
755
P2
IN
AND SPECIFICATIONS ISSUED BY SPEN.
S
8782
5. ALL LEVELS ARE IN METRES (M) ABOVE ORDNANCE DATUM.
20
SH
B B
0x
2087
AT 1200mm c/c INSTALLATION OF THE VENTILATION SYSTEM, THE
1200 95 CONTRACTOR WILL BE RESPONSIBLE FOR FINAL
WATERPROOFING AND SEALING OF THE ROOF. KEY
2. PRECAST DESIGNER TO CONFIRM SUITABILITY OF ROOF
OPENINGS WITHOUT ADDITIONAL SUPPORTS. IF MJ - MOVEMENT JOINT
67
ADDITIONAL SUPPORTS ARE REQUIRED, THESE WILL BE
203x133x25 UB
203x133x25 UB
1200x1200 DESIGNED BY THE CONTRACTOR TO SUIT ALL SITE
STRUCTURAL SPECIFIC ENVIRONMENTAL LOADINGS.
1200
C OPENING C
2815
203x133x25 UB
67
CONCRETE SLAB AROUND
VENT OPENINGS FORMED ALL BEAMS 203x203x60 UC,
NT
WITH IN-SITU CONCRETE ALL PADSTONES 440x215x215 PARAPET WALL AND COPING STONE
OI
TJ
M AND PROFILED METAL DECK RC40 CONCRETE
EN
OV
EM
EM
OV
EN
M
TJ
FALL
533x210x82 UB
OI
533x210x82 UB
x6
NT
S 00
FALL
SH 0x2
20
D DRAINAGE OUTLET
D
12576
203x203x60 UC
20 S
ROOF VENT
20
1480
0x
PRECAST CONCRETE
FALL
UNITS 100mm BEARING TO INSIDE FACE OF INNER
ON STEEL BEAM LEAF BRICK WALL
95 1200 PARAPET WALL AND COPING STONE
7076
FALL
1200
STRUCTURAL
UNITS 100mm BEARING LOW LEVEL ROOF
OPENING
ON STEEL BEAM
203x203x60 UC
203x203x60 UC
FALL
FALL
FALL
ROOF VENT
203x133x25 UB SETTING OUT DIMENSIONS
67
F FALL FALL F
x6
PARAPET WALL AND COPING STONE PARAPET WALL AND COPING STONE
S 00
SK INT P2
18
+
AL JO W
0x
M SCALE 1:100
RN NT ON
OV
80
ON
TE E C
M
x8
EM
S
IN VEM AN
OV
IN
M
AN
IN
OV
TE
CO
TJ
EM
RN
EN
+ 0x8
OI T
AL
EN
NT
W
18
JO
P2
TJ
SK
I
PLAN ON PC UNITS NT
OI
IN
NT
S
G G
SCALE 1:50
70mm x 5mm THICK SIMPSON STRONG ROOF MEMBRANE MATERIALS ARE TO BE LAID AND SEE ROOF
PRECAST SINGLE 1NO. LAYER OF GREY MINERALISED FELT TYPE
TIE RESTRAINT STRAP BOLTED TO LAPPED IN STRICT ACCORDANCE WITH MANUFACTURERS CONSTRUCTION
HT ELASTOMERIC 3.8kg/m² ROOF VENTS
PRECAST UNITS BOLTS. TO BE M10x80 WEATHERED COPING RECOMMENDATIONS. ROOF CONSTRUCTION ACHIEVE A DETAILS
OUTLET LINED WITH CODE 6 LEAD 'SURESPAN' THERMALLY BROKEN SINGLE LEAF HATCH OR EQUAL APPROVED.
HILTI HAM HARD SLEEVE ANCHORS AT STONE "U" VALUE NOT EXCEEDING 0.35W/M²/°C 1NO. LAYER OF UNDERLAY TYPE HT 450 GUTTER PROFILE
SANDWICHED BETWEEN FELT AND DRESSED FIRE RATED - UP TO 60MIN RESISTANCE FOR INTEGRITY BS476:PART 22:1987
85
300mm CENTRES ELASTOMERIC 1.8kg/m² WITH 25mm LOW LEVEL ROOF MATERIAL - ALUMINIUM / FIRE MATERIAL ENCASED IN GALVANISED MILD STEEL.
.0°
NEXUS UNDERSLUNG OVER TOP OF HEAD WITH 150X75mm DEEP
50x50 TANALISED S.W TILTING CROSSFALL 1492
DEEP RECESS SUPPORT VAPOUR ESCAPE SHEET (TYPE 3G) LIP, DRESS UP SIDES OF OUTLET AND TUCK FINISH: MILL FINISH.
FILLET PLUGGED TO BLOCKWORK FITTED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. 146 1200 STRUCTURAL OPENING 146
ARRANGEMENT FACE FIXED FELT OVER BRICKWORK
TO PRECAST PLANKS AND 100mm THICK CELOTEX TC3000 INSULATION
75
H H
EITHER SIDE. PRECAST TO LOCALLY CUT / PLACED TO SUIT
146
25mm THICK SAND/CEMENT SCREED FOR OUTLET LINER MANUAL SAFETY STAY
BE DESIGNED TO SUPPORT
FOR USE DURING MAINTENANCE
OFFSET PARAPET LYTAG LWA (4/8mm LYTAG AGGREGATE)
100 OR WINDY CONDITIONS
ARRANGEMENT. PRECAST SCREED LAID ON BONDING AGENT SBR. LINER DRESSED INTO HOPPER
385 DESIGNER TO PROVIDE 100-25mm (LAID TO FALL)
360
CELOTEX CW4000 PRECAST CONCRETE SLAB GROUTED WITH
1492
1200mm x 70mm x 5mm THICK 25MM THICK 30N/mm² CONCRETE USING 6/10mm AGGREGATE SCALE 1:20
SIMPSON STRONG TIE RESTRAINT TYPICAL ROOF OUTLET DETAIL.
J STRAP ARE TO BE BENT DOWN 900mm
AND FIXED TO INNER LEAF USING 3 NO.
TYPICAL WALL/ROOF CONSTRUCTION DETAILS. SCALE 1:20 GAS SPRINGS J
146
BE SUPPORTED FROM SUPPORT
RESTRAINT DETAIL HEPWORTH OR SIMILAR
15
APPROVED.
28
50
LEVEL VARIES
215
DETAIL OF ROOF
ROOF MAKE-UP AS ABOVE.
OUTLET LINER.
SCALE 1:20 P - TRAP
COPING MOVEMENT JOINT DETAIL. 2 19/12/2023 SY CS IMcC FOR COMMENT / REVIEW
SCALE 1:20 200mm DEEP BISON HOLLOWCORE PRECAST C20/25 CONCRETE BED AND TEMPORARY STABILITY: 1 09/08/2023 RMS CS IMcC VFC ISSUE
CONCRETE SLABS SURROUND UNTIL NECESSARY
COVER ACHIEVED MASONRY WALL PANELS RELY ON HORIZONTAL/VERTICAL Rev Date Drawn Reviewed Approved Description of Change
L MIN 12mmØ 1000mm LONG REINFORCING BAR SUPPORT FROM RETURN WALLS, STEEL/WIND POSTS AND Drawing State:
Project:
FOUNTAINBRIDGE PRIMARY REINFORCEMENT L
SET IN POCKETS TO TIE IN PLANKS AND VOID
FILLED WITH 30N/mm² CONCRETE USING 6/10mm
RAINWATER CONNECTION DETAIL PRE-CAST CONCRETE ROOF FOR STABILITY IN PERMANENT APPROVED
ROOF SUPPORT SCALE 1:20 STATE. THE CONTRACTOR IS TO FULLY CONSIDER WALL
AGGREGATE. PRECAST DESIGNER TO CONFIRM Location: Voltage:
STEELWORK FOUNTAINBRIDGE EDINBURGH 33/11kV
EXACT REQUIREMENTS FOR TYING PLANKS AT
INTERSECTIONS.
STABILITY DURING CONSTRUCTION AND IS TO PROVIDE Approval Status: Drg. Title: