Contractor's Site Safety Supervisor please refer to the FGV Bio Safety Officer (Face-To-Face Meeting).
Hard Barricade
Insurance
A. Insurance Erection All Risk.
Section 1
- Contract Works : RM Project Value
- Construction Plant And Machinery : Include
- Clearance of Debris : Include
- Professional Fees : Include
- PRINCIPAL'S EXISTING PROPERTY : RM1 Million
Section 2
- Third Party Liability : Include
B. Insurance Workmen's Compensation.
2. Hard Barricade
10. Submit Report after complete Job. Picture using Camera. HP Camera not allowed.
11. Payment term 30 days after FGV received Invoice (No progress payment).
12. Late Penalty: 0.5% per day, subject to a maximum of 10% of the Total Contract Value.
Confined Space Requirements
No Item Comply Comment
4. Fire Extinguisher.
5. Fire Blanket.
6. Face Shield.
7. Protective Gloves.
4. Lifting Plan.
Prepared by Contractor's Lifting Supervisor,
Approved by Contractor's Site Safety Supervisor,
Acknowledge by FGV Bio Safety Officer.
5. Mobile Crane Operator Certificate.
9. Walkie-Talkie.
Work at a Height Requirements
No Item Comply Comment
Lifting Requirement
No Item Comply Comment
1 Lifting Plan. /
2 Mobile Crane Operator Certificate. /
3 Lifting Supervisor Certificate. /
4 Lifting Rigger Certificate. /
5 Lifting Signalman Certificate. /
6 Walkie Talkie. /
Inspect of Dimension:
900mm L x 600mm W for
2
Heavy Duty Steel Drain
Cover
QC Inspection Report 4
Inspect of Joint: Frames
are anchored to Monsoon
Drain Concrete Beam
Inspect of Size:
5 Y10@150C/C for Monsoon
Drain Concrete Beam
Complete Date
by Category
PO Date
Attached the Schedule Planning
Report
JOB NO
PROJECT TITLE
CONTRACTOR NAME
DURATION (DAY)
No. Description Qty
by Category A
1
SAFETY
Site Safety Supervisor (SSS)
Site Safety Suprvisor
2 Safety Coordinator
3 Fire Safety Watch
4 Authorised Gas Tester for Confined Space
5 Authorised Entry Supervisor for Confined Space
A SAFETY 6 Other (Please Specify)
B MANAGEMENT TEAM
1 Site Safety Supervisor (SSS) 1 Project Manager
2 Project Engineer
2 Safety Coordinator 3 Draftman
4 QC Engineer
3 Fire Safety Watch 5 Other (Please Specify)
4 Authorised Gas Tester for Confined Space C
1
EXECUTION TEAM
Workshop Supervisor
5 Authorised Entry Supervisor for Confined Space 2 Site Supervisor
3 QC Supervisor
6 Other (Please Specify) 4 Work Leader (PTW)
5 Mechanical Fitter
B MANAGEMENT TEAM 6 Qualified Welder
7 NDT Technician (Dye Penetration Test)
1 Project Manager 8 Chargeman Electrical
2 Project Engineer 9
10
Wireman PW4
Blasting & Painting Supervisor
3 Draftman 11 Blasting & Painting Technician
12 Insulation Supervisor
4 QC Engineer 13 Insulation Technician
14 JIT Supervisor
5 Other (Please Specify) 15 JIT Technician (MTW)
16 Semi-Skilled
17 Helper
18 Scaffold Inspector
19 Scaffold Erector
20 Other (Please Specify)
D LIFTING TEAM
1 Crane Operator
2 Lifting Supervisor
3 Signalman
4 Rigger
5 Skylift Operator
6 Other (Please Specify)
E HPWJ TEAM
1 Hydrojetter
2 Pump Operator
3 Other (Please Specify)
TOTAL
Attached the Equipment Loading
EQUIPMENT LOADING
JOB NO
PROJECT TITLE
CONTRACTOR NAME
by Category A
1
SAFETY EQUIPMENT
Safety Signage/Work On Progress Signage
2 Fire Extingusher
3 Fire Blanket
4 Body Harness
5 Walkie Talkie
A SAFETY EQUIPMENT 6 Ventilation
7 Gas Detector
1 Safety Signage/Work On Progress Signage 8 SCBA
9 Lifeline
2 Fire Extingusher 10 Other (Please Specify)
B MACHINERIES & TRANSPORTATION
3 Fire Blanket 1 Lorry 3 mt
2 Lorry Crane 15 mt
4 Body Harness 3 Low Loader 5 axle
4 Crane 45 mt
5 Walkie Talkie 5 Skylift 24 meter
6 Other (Please Specify)
6 Ventilation C EQUIPMENT & TOOLS
1 Generator Set 45 kVA
7 Gas Detector 2 Extension Cable 240V
3 Distribution Box/Junction Box
8 SCBA 4 Air Compressor 175cfm
5 Air Hose and Manifold
9 Lifeline 6 Measuring Tools (Tape, Lasser)
7 Hand Tools (Spanner Screwdriver Set)
10 Other (Please Specify) 8 Power Tools (Drill)
9 Grinder
10 TIG Welding Machine
11 SMAW Welding Machine
12 Filler Rod
13 Plasma Cutter
14 Oxy Cutter
15 Oxygen/Acetyelen/Argon Gas
16 Sport Light 240 V
17 Hand Lamp 24 V
18 Hydraulic Test Pump 1000 bar
19 Manual Torque Wrench
20 Blind Flange
21 Canvas
22 BS Standard Tubular Metal Scaffolding
23 Other (Please Specify)
D LIFTING EQUIPMENT
1 Chainblock 10mt
2 Lever Block 10mt
3 Sling Belt 10mt
4 Lifting Beam 10mt
5 Other (Please Specify)
E CLEANING EQUIPMENT
1 High-Pressure Water Jetting 15k psi
2 HPWJ 25k psi Hi-Flow
3 High-Pressure Hose
4 High-Pressure Flexible Lance
5 High & Low Pressure Waterjet Hand Lances
6 High-Pressure 3D Rotating Nozzle
7 Other (Please Specify)
TOTAL
Attached the Bill of Material (BOM)
F GASKET
1 8in Gasket SPW, ANSI-150, Graphite/SS316 PC 1
BILL OF MATERIAL (BOM) 2 6in Gasket SPW, ANSI-150, Graphite/SS316 PC 3
3 3in Gasket SPW, ANSI-150, Graphite/SS316 PC 4
JOB NO. 4 2in Gasket SPW, ANSI-150, Graphite/SS316 PC 3
PROJECT TITLE 5 1in Gasket SPW, ANSI-150, Graphite/SS316 PC 3
CONTRACTOR NAME
G STUDBOLT A193 B8 2x NUT A194 8 (SS304)
No. Description Unit Qty 1 1 Flange = 8in ANSI-150, 3/4in x 110mm Studbolt x 2Nut, SS304 SET 8
2 3 Flange = 6in ANSI-150, 3/4in x 100mm Studbolt x 2Nut, SS304 SET 24
by Category A
1
PIPE SS304
6in Welded Pipe, SCH40, SS304 LGT 1
3
4
4 Flange = 3in ANSI-150, 5/8in x 90mm Studbolt x 2Nut, SS304
3 Flange = 2in ANSI-150, 5/8in x 80mm Studbolt x 2Nut, SS304
SET
SET
24
12
2 3in Welded Pipe, SCH40, SS304 LGT 2 5 3 Flange = 1in ANSI-150, 1/2in x 65mm Studbolt x 2Nut, SS304 SET 12
3 2in Welded Pipe, SCH40, SS304 LGT 1
4 1in Welded Pipe, SCH40, SS304 LGT 1
Note:
B FLANGE SS304 1 Flange = 1/2in ANSI-150, 1/2in x 60mm Studbolt x 2Nut, SS304 SET 4
1 6in SORF Flange, ANSI-150, SS304 PC 1 1 Flange = 3/4in ANSI-150, 1/2in x 65mm Studbolt x 2Nut, SS304 SET 4
2 3in SORF Flange, ANSI-150, SS304 PC 4 1 Flange = 1in ANSI-150, 1/2in x 65mm Studbolt x 2Nut, SS304 SET 4
3 2in SORF Flange, ANSI-150, SS304 PC 3 1 Flange = 1-1/4in ANSI-150, 1/2in x 70mm Studbolt x 2Nut, SS304 SET 4
4 1in SORF Flange, ANSI-150, SS304 PC 3 1 Flange = 1-1/2in ANSI-150, 1/2in x 70mm Studbolt x 2Nut, SS304 SET 4
5 8in WNRF Flange, ANSI-150, SS304 PC 1 1 Flange = 2in ANSI-150, 5/8in x 80mm Studbolt x 2Nut, SS304 SET 4
6 6in WNRF Flange, ANSI-150, SS304 PC 2 1 Flange = 2-1/2in ANSI-150, 5/8in x 90mm Studbolt x 2Nut, SS304 SET 4
7 3in Weldolet, ANSI-150, SS304 (At Header) PC 1 1 Flange = 3in ANSI-150, 5/8in x 90mm Studbolt x 2Nut, SS304 SET 4
8 2in Weldolet, ANSI-150, SS304 (At Header) PC 1 1 Flange = 3-1/2in ANSI-150, 5/8in x 90mm Studbolt x 2Nut, SS304 SET 8
9 1in Weldolet, ANSI-150, SS304 (At Header) PC 1 1 Flange = 4in ANSI-150, 5/8in x 90mm Studbolt x 2Nut, SS304 SET 8
1 Flange = 5in ANSI-150, 3/4in x 90mm Studbolt x 2Nut, SS304 SET 8
C FLANGE SA 105 1 Flange = 6in ANSI-150, 3/4in x 100mm Studbolt x 2Nut, SS304 SET 8
1 6in SORF Flange, ANSI-150, SA 105 PC 1 1 Flange = 8in ANSI-150, 3/4in x 110mm Studbolt x 2Nut, SS304 SET 8
1 Flange = 10in ANSI-150, 7/8in x 115mm Studbolt x 2Nut, SS304 SET 12
D VALVE 1 Flange = 12in ANSI-150, 7/8in x 120mm Studbolt x 2Nut, SS304 SET 12
1 6in Arita Globe Valve Flange, ANSI-150, SS304 PC 1 1 Flange = 14in ANSI-150, 1in x 130mm Studbolt x 2Nut, SS304 SET 12
2 3in Arita Globe Valve Flange, ANSI-150, SS304 PC 1 1 Flange = 16in ANSI-150, 1in x 135mm Studbolt x 2Nut, SS304 SET 16
3 2in Arita Globe Valve Flange, ANSI-150, SS304 PC 1 1 Flange = 18in ANSI-150, 1-1/8in x 150mm Studbolt x 2Nut, SS304 SET 16
4 1in Arita Globe Valve Flange, ANSI-150, SS304 PC 1 1 Flange = 20in ANSI-150, 1-1/8in x 160mm Studbolt x 2Nut, SS304 SET 20
1 Flange = 24in ANSI-150, 1-1/4in x 175mm Studbolt x 2Nut, SS304 SET 20
E FITTING
1 6in 90deg LR Elbow BW, SCH40, SS304 PC 4
2 3in 90deg LR Elbow BW, SCH40, SS304 PC 3
3 2in 90deg LR Elbow BW, SCH40, SS304 PC 2
4 1in 90deg LR Elbow BW, SCH40, SS304 PC 3
5 8in x 6in Con Reducer BW, SCH40, SS304 PC 1
Attached the Sketch Layout or ISO Drawing
ISO Drawing
Replace Red
Piping
Company Logo
Attached the Sketch Layout or ISO Drawing
Sketch Layout
Replace Red
Piping
Attached the Sketch Layout or ISO Drawing
Company
Logo
Attached the Site Safety Supervisor (SSS) Certificate
Company Logo
Attached the Fire Safety Watch Certificate
Attached the Lifting Supervisor Certificate, Rigger and Signalman
Safety briefing and JSA to all employees will take half a day on
the first day.
Job Safety Analysis (JSA) is prepared by the Contractor's Site Safety Supervisor
Company Name
Company Logo
Page 1/5
Ventilation Plan and Ventilation Calculation is prepared by the Contractor's AGTES
Contractor's Contractor's
Authorized Site Safety
Gas Tester Supervisor
3D Drawing – For Approval Before Starting Fabrication
3D Drawing – For Approval Before Starting Fabrication
3D Drawing – For Approval Before Starting Fabrication
Company Logo
3D Drawing – For Approval Before Starting Fabrication
Company
Logo
Company
Logo
Company
Logo
6. Final Report – FOR AUDIT PURPOSE
Final Report – FOR AUDIT PURPOSE
Company Company
Logo Logo
Inspection Report such as
- Dye Penetrant Inspection Report
- Hydrostatic Pressure Test Report
- Concrete Slump Test Report
- Concrete Cube Test (Strength) Report
- Piling Report
- Pile Dynamic Analysis (PDA) Report
- etc
7. Housekeeping and transfer Scrap Metal to the Scrap Yard
IMPORTANT! Please Avoid Re-Works
IMPORTANT! Please Avoid Re-Works