Where the grass regrows
awe were nie ee
isolution for all
wironments
mesh System
stv ston filed font face unt 1m to 0.5m thick can be
for:
‘ertical wal
‘tepped walls.
rove erosion protection for rive and steams where the
lis exposed to permanent water
inTerramesh System
-sthetic solution combining engineered soi reinforcement
on set at a maximum angle of 70" to ensure sufficient
‘ater penetration to support longterm vegetation growth.
roviding permanent engineered structure hidden by natural
sliage.
quires no rock front face resulting in one ofthe most
conomica retaining structure eve.
Penyelesaian untuk
semua persekitaran
Sistem Terramesh
Unit muka depan sian batu yang menark dengan ketebalant
1m hingga 0.5m boleh digurakan untuk
+ Tembok tegak
* Tembok bertangga
‘© Menyediakan pertindungan hatisan untuk sungai dan atu dh
‘mana tembok tersebut sntiasa terdedah kepada ai.
Sistem Green Terramesh
Penyelesian este yong menggaungkanpenyelesaan tab
beretuang yong dtetapkan pada suit maksimur 70" bagi
tmemasttan penembusan air hujan yang cukup bagi
_menggalotéan pertunbuhan tunbultumbuhan dalam angka
ponang
* Menyedokan struktrteeka bent eka yang terselining
€tsebalic imbunan dun seach.
«Tio memerlan mua depan btu, menjocannyaantara
strat penohan yang pain menjnatkon./Compacted
Sand Fil
429m Teams tetaeing wal ora gld mine in
_ Sumbena indonesia
5 Embankment infrced wth Terameint, fentong Rural
oad, Route F058 Pahang Masaya
{6 Sipe stbilZation and protection ving Green
snes, Shah Alam Stadium. Selangor“ Malaya,
7. felorced hil slope wth Terrase, Kuala Kral,
Fecal Route, Gua Musang Rood Malaya,
4 Tembok penghan Teramest® 250 untuk lombong
cemosd Sombana Indore
5 Tembat yang dneteguh dengan Terrames, alan Doss
entang,talvan F068, Pahang Alay,
§.pertbion dn pega in eragnakan
‘Groen Teams Sada Shap Am
Selangor“ Malan.
2. Memperteguhtarcaan buble dengan menagunaéa
Terramesh Kula Ra Lalan Perchatuan
us nang = aloo,he reinforcement: solutions
eneguhan: penyelesaianThe Terramesh® System
Sistem Terramesh®
Close cooperation with construction companies has alowed
Macafritoofe products created to reduce the placement cost
and problems on the consruction sit
Instaltion ofthe Teramesh® system can be easily and rapidly
executed by unskled staf ater proper taining.
Compliance with the installation instructions given by Maccafer
is fundamental to obtain aso lasting and cost-effective
structure
In ation, they ensure safety onthe jb ite
Compaction and preparation of sols cared outwith traditional
eipmentin acordance with al leant local specications for
road construction
Te structural embankment should be of selected good quality
sxanular fil witha high daining capacity an high angle of
intemal ction, Particular ts characteristics must remain
unatered in time. If ths snot posible it's necessary to make
sure that the design has taken into account the characteristics of
the soi used dung placement.
‘The results ofthe tests have demonstrated that grading, varying
{rom 0.2mm upto 6 mm (100% passin) isan optimum scale of
values for the embankment You can also use greater gradations
incase a partial safety factors inserted in the reinforcement to
prevent possible coatings damage.
In the case of aren fac, in oder to obtain the maximum
effectiveness inthe greening process itis necessary to prepare a
smal layer of vegetal ol inthe area immediately lying behind the
external face.
An appropriate hyeoseeding and fing f plant cutings wil
have tobe considered to ensure the greening proces aking into
account the local climatic situation, the exposure, the geometry of
‘the project, and the floristic vegetaton characteristics of
‘the area,
Kesjasama erat dengan syaritat-syarkat pembinaan telah
‘membolekan Maccaferi menawarkan produkproduk yang
ddreka cipta untuk mengurangkan kas pemasangan dan masala
rmasalah di fapak pembinaan.
Sister Terramest? boleh dipasang dengan mudah dan cepat oleh
Kakitangan yang tidak mahi selepas menjalan latiban. Arahan-
arakan pomasangan yang diber oleh Maccafer amat pening
dlipatuhi bagi mendspatkanstuktur yang kul, tafan lama dan
berkesan kas. Di samping itu, a juga menjaminkeselamatan di
tapak ke.
Pemadatan dan penyediaan tanahdijtankan menggunakan
kelengkapan tadisiona selaras dengan semua spsifiast
tempatan yang relevan bagi pembinaan jalan. Tanah Tambak
hharuslah teri darpade sian berbutirberkualit tinggi yong
tepith dengan keupayazn penyalian yang gg dan sudut
geseran yang tinggi. Cir-cinya terutamanya mestlah kekal tidak
brubah amakan masa, Kalau ini tidak boleh dlaksanakan, maka
perllah cipasican bahawa rekabentuk tesebut telah mengambil
Kira circ tanah yang digunakan semasa pemasangan.
asi fan menunjukkan bahawa penggredan, berbeza-beza
daria 0.02mm hingga 6m (penemtusan 100%) merypakan
sala nile yang optimur bagi tambak. Anda juga boleh
‘menggunakan penggredan yang lett besarsekianya faktor
eselamatan separa dimasukkan ke dalam peneguhan untuk
‘mencegah kemungkinan Berlakunya kerasekan pada salutan.
Bagi perrukaan hij pula, bagi memperoleh Keberkesanan yang
‘ptimum dalam proses penghjauar, maka perllahdisediakan
seapican kell anah vegetal di kawasan yang tvetak di
belakang permukaan liar Hcroperyemaian yang sesuai dan
penanaman Keatan tumbuhan perulah dpetimbangkan bagh
‘memastitan proses penghjauan tersebut trut mengambi kira
eadaanikim setempat, pendedatan, geomet projek, dan ci