Duct Insulation
Duct Insulation
SECTION 15081S
DUCT INSULATION
PART 1 - GENERAL
A. Thermal and acoustical insulation applied externally or internally to ductwork and air handling
devices; including:
1. Duct insulation.
2. Insulation jackets.
3. Duct liner.
1.03 REFERENCES
1.04 SUBMITTALS
A. Include product description, list of materials, and thickness for each service and location.
Duct Insulation
Issue Date: November 4, 2002 15081S - 1
1.05 QUALITY ASSURANCE
A. Applicator Qualifications: Company specializing in duct insulation application with three years
minimum experience.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Certainteed Corporation.
C. Manville Corporation.
2.02 MATERIALS
A. Type A: Flexible glass fiber duct wrap; ASTM C 553; commercial grade; 'k' value of 0.22
at 75 degrees F; 3/4 pound per cubic foot minimum density; 0.002-inch foil scrim kraft facing
for air ducts. The vapor barrier shall be legibly printed by the manufacturer to show
flame spread smoke developed, nominal thickness and type of insulation.
B. Type B: Rigid glass fiber duct board; ASTM C 612, Class 1; 'k' value of 0.22 at 75
degrees F; 0.002-inch foil scrim kraft facing for air ducts. The vapor barrier shall be
legibly printed by the manufacturer to show flame spread smoke developed, nominal
thickness and type of insulation.
C. Type C: Ductliner, flexible glass fiber; ASTM C 553; 'C' value of 0.25 at 75 degrees F for
1” thick and “C” value of 0.13 at 75oF for 2” thick; 1-1/2 pounds per cubic foot
minimum density; coated air side for maximum 4,000 feet per minute air velocity.
Duct Insulation
Issue Date: November 4, 2002 15081S - 2
2. Ultraviolet-Protective Coating: As recommended by insulation manufacturer.
E. Type D: Fiberglass Flexible Duct shall be installed in sizes and locations where
indicated on drawings. The flexible duct shall have: maximum interior air
temperature of 2000F, maximum static pressure 10”, maximum negative air
pressure ½” a C value of .23 BTU/hr./ft.2/F. or engineer approved equal.
H. Jacket: Presized glass cloth, minimum 7.8 ounces per square yard.
K. Lagging: 2 inch high density fiberglass, 6 pounds per cubic foot, covered with a 0.016
acoustically treated stucco embossed with 1-1/4 pounds per square foot aluminum cladding,
Childers Muffl-Jac.
A. Aluminum Jacket: Aluminum roll stock, ready for shop or field cutting and forming
to indicated sizes, or factor cut and rolled. Comply with ASTM B 209, 3003 alloy, H-
14 temper.
3. Elbows: Preformed, 45- and 90-degree, short- and long-radius elbows; same
material, finish, and thickness as jacket.
B. PVC Jacket: White, 25/50 rated per ASTM E 84, UV resistant, minimum thickness
0.20” for insulation O.D. up to 18” and 0.030” for insulation O.D. above 18”
Duct Insulation
Issue Date: November 4, 2002 15081S - 3
2.04 ACCESSORIES AND ATTACHMENTS
B. Bands: Stainless Steel, ASTM A666, Type 304, 0.020 inch thick.
PART 3 - EXECUTION
3.01 PREPARATION
A. Install exterior materials after duct has been tested and approved.
3.02 INSTALLATION
1. Secure insulation with vapor barrier with wires and seal jacket joints with vapor barrier
adhesive or tape to match jacket.
2. The duct wrap shall be applied over clear dry sheet metal duct work that has
been sealed air-tight at all seams and joints. Duct wrap shall be installed to
allow maximum fullness at corners (avoid excessive compression). Install without
sag on underside of ductwork. Use 4 inch wide strips of adhesive on 8 inch centers or
mechanical fasteners where necessary to prevent sagging. Seal vapor barrier
penetrations by mechanical fasteners with vapor barrier adhesive. Stop and point
insulation around access doors and damper operators to allow operation without
disturbing wrapping.
3. Insulate standing seams and stiffeners which protrude through the insulation with 1-1/2
inch thick, unfaced, flexible blanket insulation. Cover with glass cloth and coat with
vapor barrier finish coating.
4. On circumferential joints, the 2-inch flange on the facing shall be secured with 9/16-inch
outward clinch steel staples on 2-inch centers, and taped with a minimum 3 inch wide
strip of fold vapor barrier tape.
Duct Insulation
Issue Date: November 4, 2002 15081S - 4
5. Cover seams, joints, pin penetrations and other breaks finish coating reinforced with glass
cloth.
Application:
Insulation shall be cut and fit tightly between standing seams. Insulation boards
shall be applied using mechanical fasteners, such as weld pins or stick clips.
Fasteners shall be located not less than 3” from each edge or corner of the
board. Pin or clip spacing along the duct should be no greater than 12” on
centers. Additional pins or clips may be required to hold the insulation tightly
against the surface where cross breaking is used for stiffening. Weld pin lengths
must be selected to insure tight fit but avoid “oil canning” effect.
Finish:
Air Conditioning, heating and ventilating ducts. Cover all joints and fastener
penetration with 3” wide pressure sensitive All Service Jacket (ASJ) tape. Rub
tape hard with a nylon sealing tool. Over the entire surface apply a 20 x 20
weave glass reinforcing cloth embedded between two 1/8” thick wet coats of
Breather mastic, i.e., B. Foster Seal Fast 6 PM 35-00-4500.
1. All portions of duct designated to receive duct liner shall be completely covered
with Duct Liner. Transverse joints shall be neatly butted and there shall be no
interruptions or gaps.
2. The black coated surface of the Duct Liner shall face the air stream.
3. The Duct Liner shall be adhered to the sheet metal with 100% coverage of
adhesive and all exposed leading edges and all transverse joints coated with
adhesive. Adhesive shall conform to Adhesive and Sealant Council Standards
for Adhesive for Duct Liner, ASC-A-7001C-1972.
Duct Insulation
Issue Date: November 4, 2002 15081S - 5
5. Duct Liner shall be cut to a assure overlapped and compressed longitudinal
corner joints.
6. For velocities to 2,000 feet per minute, fasteners shall start within 3” of the
upstream transverse edges of the Aeroflex Duct Liner and 3” from the
longitudinal joints and shall be spaced at a maximum of 12” o.c. around the
perimeter of the duct, except that they may be maximum of 12” from corner
break. Elsewhere they shall be a maximum of 18” o.c. except that they shall be
placed not more than 6” from a longitudinal joint of the liner nor 12” from a
corner break.
7. For velocities from 2,001 to 4000 feet per minute, fasteners shall start within 3”
of the upstream transverse edges of the liner and 3” from the longitudinal joints
and shall be spaced at a maximum of 6” o.c. around the perimeter of the duct,
except that they may be a maximum of 6” from a corner break. Elsewhere they
shall be a maximum of 16” o.c. , except that they shall be placed not more than
6” from a longitudinal joint of the liner nor 12” from a corner break. In addition
to the adhesive edge coating of transverse joints, any longitudinal joints shall be
similarly coated with adhesive.
8. For velocities from 4,000 to 6,000 feet per minute. Same as 2,001 to 4,000 a
FPM except that metal nosing shall be installed to secure the Aeroflex Duct
Liner at all upstream transverse edges.
1. For noise control and sound traps, use lagging. Secure insulation with 100 percent
coverage of lagging adhesive, pins and clips not more than 18 inches on center.
2. Secure bottom of duct insulation using alternate single and double clips. The first pin will
secure the insulation and the second clip will be used to secure the cladding. Isolate the
exterior clip from the cladding by using two 1/8-inch closed cell neoprene (Armaflex)
washers on either side of the cladding. Predrill holes in cladding and avoid contact with
pin during installation.
3. For round duct, secure insulation with 100 percent coverage of lagging adhesive. Secure
cladding with 3/4-inch, 0.020-inch stainless steel bands on 12 inch centers.
4. For joints and overlaps, fold cladding to form a double thickness hem 2 inches minimum.
Seal with a non-shrink, non-hardening sealing compound.
F. Walk-in Plenum Application: Adhere insulation on interior surface of plenum with adhesive
for 100 percent coverage. Secure insulation with mechanical fasteners. Seal and smooth
joints. Do not use nail-type fasteners.
Duct Insulation
Issue Date: November 4, 2002 15081S - 6
G. Continue insulation with vapor barrier through penetrations.
A. Exterior: Apply aluminum jacketing to all external piping that is insulated. Cover
all fittings, valves, and specialties with aluminum jacketing.
B. Apply metal jacket where indicated, with 2-inch overlap at longitudinal seams and
end joints. Secure jacket with aluminum bands or sheet metal screws on 12 inches
centers and at end joints. On piping exposed to the weather, overlap longitudinal
seams arranged to shed water and seal end joints with weatherproof mastic.
C. Apply PVC jacketing where indicated, with 2-inch overlap at longitudinal seams and
and at fitting covers, the maximum the cover allows. Seal longitudinal seams by
joining with PVC welding solvent. Seal circumferential ends with 1/1/2” PVC tape.
3.05 SCHEDULE
A. Provide insulation or liner for duct in accordance with the following schedule:
Duct Insulation
Issue Date: November 4, 2002 15081S - 7
ALL BUILDINGS EXCEPT MICROFAB
Insulation or
Duct Type Liner Thickness
Rectangular or round Supply, Exhaust or return C 2"
ducts in Mechanical Rooms and within 30 feet
of the Mechanical Room or Air Handler
Return Air Boots C 1”
Supply ductwork downstream of VAV boxes. C 1”
Duct Insulation
Issue Date: November 4, 2002 15081S - 8
B. Provide insulation or liner for duct for the MicroFab only in accordance with the
following schedule:
MICROFAB
END OF SECTION
Duct Insulation
Issue Date: November 4, 2002 15081S - 9