0% found this document useful (0 votes)
56 views9 pages

Duct Insulation

This document provides specifications for duct insulation. It outlines three types of insulation materials: flexible glass fiber duct wrap (Type A), rigid glass fiber duct board (Type B), and flexible glass fiber duct liner (Type C). It also specifies insulation requirements for exterior ducts, including installing insulation over sealed ductwork and covering joints with vapor barrier tape or adhesive. Installation instructions are provided for applying insulation to both interior and exterior ducts.

Uploaded by

phyolwin oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views9 pages

Duct Insulation

This document provides specifications for duct insulation. It outlines three types of insulation materials: flexible glass fiber duct wrap (Type A), rigid glass fiber duct board (Type B), and flexible glass fiber duct liner (Type C). It also specifies insulation requirements for exterior ducts, including installing insulation over sealed ductwork and covering joints with vapor barrier tape or adhesive. Installation instructions are provided for applying insulation to both interior and exterior ducts.

Uploaded by

phyolwin oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

SPECIAL SPECIFICATION

SECTION 15081S

DUCT INSULATION

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Thermal and acoustical insulation applied externally or internally to ductwork and air handling
devices; including:

1. Duct insulation.

2. Insulation jackets.

3. Duct liner.

1.02 RELATED SECTIONS

A. Section 09900S - Painting.

B. Section 15075S - Mechanical Identification.

C. Section 15891S - Ductwork

1.03 REFERENCES

A. ASTM C 553 - Mineral Fiber Blanket and Felt Insulation.

B. ASTM C 612 - Mineral Fiber Block and Board Thermal Insulation.

C. ASTM E 84 - Surface Burning Characteristics of Building Materials.

D. C 534 Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and


Tube Form.

1.04 SUBMITTALS

A. Include product description, list of materials, and thickness for each service and location.

Duct Insulation
Issue Date: November 4, 2002 15081S - 1
1.05 QUALITY ASSURANCE

A. Applicator Qualifications: Company specializing in duct insulation application with three years
minimum experience.

B. Materials: UL listed; flame spread/fuel contributed/smoke developed rating of 25/25/50 in


accordance with ASTM E 84.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Certainteed Corporation.

B. Knauf Fiber Glass.

C. Manville Corporation.

D. Owens-Corning Fiberglass Corporation.

2.02 MATERIALS

A. Type A: Flexible glass fiber duct wrap; ASTM C 553; commercial grade; 'k' value of 0.22
at 75 degrees F; 3/4 pound per cubic foot minimum density; 0.002-inch foil scrim kraft facing
for air ducts. The vapor barrier shall be legibly printed by the manufacturer to show
flame spread smoke developed, nominal thickness and type of insulation.

B. Type B: Rigid glass fiber duct board; ASTM C 612, Class 1; 'k' value of 0.22 at 75
degrees F; 0.002-inch foil scrim kraft facing for air ducts. The vapor barrier shall be
legibly printed by the manufacturer to show flame spread smoke developed, nominal
thickness and type of insulation.

C. Type C: Ductliner, flexible glass fiber; ASTM C 553; 'C' value of 0.25 at 75 degrees F for
1” thick and “C” value of 0.13 at 75oF for 2” thick; 1-1/2 pounds per cubic foot
minimum density; coated air side for maximum 4,000 feet per minute air velocity.

D. Type E: Flexible Elastomeric Thermal Insulation: Closed-cell, sponge- or expanded-


rubber materials. Comply with ASTM C 534, Type I for tubular materials and Type
II for sheet materials.

1. Adhesive: As recommended by insulation material manufacturer.

Duct Insulation
Issue Date: November 4, 2002 15081S - 2
2. Ultraviolet-Protective Coating: As recommended by insulation manufacturer.

3. Standard PVC: PVC covers manufactured from 20-mils thick, high-impact,


ultraviolet-resistant PVC.

4. Adhesive: As recommended by insulation material manufacturer.

E. Type D: Fiberglass Flexible Duct shall be installed in sizes and locations where
indicated on drawings. The flexible duct shall have: maximum interior air
temperature of 2000F, maximum static pressure 10”, maximum negative air
pressure ½” a C value of .23 BTU/hr./ft.2/F. or engineer approved equal.

F. Adhesives: Waterproof vapor barrier type, Childers CP-82.

G. Finish: Vapor barrier finish coating, Childers CP-33.

H. Jacket: Presized glass cloth, minimum 7.8 ounces per square yard.

I. Lagging Adhesive: Fire resistive to ASTM E 84, Childers CP-82.

J. Impale Anchors: Galvanized steel, 12 gage self-adhesive pad.

K. Lagging: 2 inch high density fiberglass, 6 pounds per cubic foot, covered with a 0.016
acoustically treated stucco embossed with 1-1/4 pounds per square foot aluminum cladding,
Childers Muffl-Jac.

L. Joint Tape: Glass fiber cloth, open mesh.

M. Tie Wire: Annealed steel, 16 gage.

2.03 FIELD-APPLIED JACKETS

A. Aluminum Jacket: Aluminum roll stock, ready for shop or field cutting and forming
to indicated sizes, or factor cut and rolled. Comply with ASTM B 209, 3003 alloy, H-
14 temper.

1. Finish and Thickness: Stucco-embossed finish, 0.016 inch thick.

2. Moisture Barrier: 1-mil thick, heat-bonded polyethylene and kraft paper.

3. Elbows: Preformed, 45- and 90-degree, short- and long-radius elbows; same
material, finish, and thickness as jacket.

B. PVC Jacket: White, 25/50 rated per ASTM E 84, UV resistant, minimum thickness
0.20” for insulation O.D. up to 18” and 0.030” for insulation O.D. above 18”

Duct Insulation
Issue Date: November 4, 2002 15081S - 3
2.04 ACCESSORIES AND ATTACHMENTS

A. Bands: Aluminum; 0.007 inch thick 3/4 inch wide.

B. Bands: Stainless Steel, ASTM A666, Type 304, 0.020 inch thick.

C. Manufactured Thermal Hanger Shields: Thermal inserts shall be 360 degree


calcium silicate extending 1 inch past the metal shield and with all service jacket.
Sized to fit the pipe diameter and match the outside diameter of the adjoining pipe
insulation. Metal shield shall be galvanized steel 180 degree for clevises and roller
type hangers and 360 degree for clamp type hangers and supports. Shield and insert
length and gauge shall be manufactures standard for the intended application.

PART 3 - EXECUTION

3.01 PREPARATION

A. Install exterior materials after duct has been tested and approved.

B. Clean surfaces for adhesives.

3.02 INSTALLATION

A. Install materials in accordance with manufacturer's instructions.

B. Provide insulation on exterior of all round duct.

C. Insulation (Types A and B) Application for exterior of duct in Interior of Building:

1. Secure insulation with vapor barrier with wires and seal jacket joints with vapor barrier
adhesive or tape to match jacket.

2. The duct wrap shall be applied over clear dry sheet metal duct work that has
been sealed air-tight at all seams and joints. Duct wrap shall be installed to
allow maximum fullness at corners (avoid excessive compression). Install without
sag on underside of ductwork. Use 4 inch wide strips of adhesive on 8 inch centers or
mechanical fasteners where necessary to prevent sagging. Seal vapor barrier
penetrations by mechanical fasteners with vapor barrier adhesive. Stop and point
insulation around access doors and damper operators to allow operation without
disturbing wrapping.

3. Insulate standing seams and stiffeners which protrude through the insulation with 1-1/2
inch thick, unfaced, flexible blanket insulation. Cover with glass cloth and coat with
vapor barrier finish coating.

4. On circumferential joints, the 2-inch flange on the facing shall be secured with 9/16-inch
outward clinch steel staples on 2-inch centers, and taped with a minimum 3 inch wide
strip of fold vapor barrier tape.

Duct Insulation
Issue Date: November 4, 2002 15081S - 4
5. Cover seams, joints, pin penetrations and other breaks finish coating reinforced with glass
cloth.

6. Outdoor Duct Insulation:


Insulate all heating, ventilating and air conditioning sheet metal ductwork,
outdoors, exposed to the weather, with 2” thick 6 lb. Density 705 ASJ Board or
approved equal.

Application:
Insulation shall be cut and fit tightly between standing seams. Insulation boards
shall be applied using mechanical fasteners, such as weld pins or stick clips.
Fasteners shall be located not less than 3” from each edge or corner of the
board. Pin or clip spacing along the duct should be no greater than 12” on
centers. Additional pins or clips may be required to hold the insulation tightly
against the surface where cross breaking is used for stiffening. Weld pin lengths
must be selected to insure tight fit but avoid “oil canning” effect.

Finish:
Air Conditioning, heating and ventilating ducts. Cover all joints and fastener
penetration with 3” wide pressure sensitive All Service Jacket (ASJ) tape. Rub
tape hard with a nylon sealing tool. Over the entire surface apply a 20 x 20
weave glass reinforcing cloth embedded between two 1/8” thick wet coats of
Breather mastic, i.e., B. Foster Seal Fast 6 PM 35-00-4500.

D. Liner (Type C) Application:

1. All portions of duct designated to receive duct liner shall be completely covered
with Duct Liner. Transverse joints shall be neatly butted and there shall be no
interruptions or gaps.

2. The black coated surface of the Duct Liner shall face the air stream.

3. The Duct Liner shall be adhered to the sheet metal with 100% coverage of
adhesive and all exposed leading edges and all transverse joints coated with
adhesive. Adhesive shall conform to Adhesive and Sealant Council Standards
for Adhesive for Duct Liner, ASC-A-7001C-1972.

4. The Duct Liner shall be additionally secured with mechanical fasteners


(Mechanical fasteners shall conform to Mechanical Fastener Standard MF-1-
1971, available from Sheet Metal and Air Conditioning Contractors National
Association), which shall compress the duct liner sufficiently to hold it firmly in
place.

Duct Insulation
Issue Date: November 4, 2002 15081S - 5
5. Duct Liner shall be cut to a assure overlapped and compressed longitudinal
corner joints.

6. For velocities to 2,000 feet per minute, fasteners shall start within 3” of the
upstream transverse edges of the Aeroflex Duct Liner and 3” from the
longitudinal joints and shall be spaced at a maximum of 12” o.c. around the
perimeter of the duct, except that they may be maximum of 12” from corner
break. Elsewhere they shall be a maximum of 18” o.c. except that they shall be
placed not more than 6” from a longitudinal joint of the liner nor 12” from a
corner break.

7. For velocities from 2,001 to 4000 feet per minute, fasteners shall start within 3”
of the upstream transverse edges of the liner and 3” from the longitudinal joints
and shall be spaced at a maximum of 6” o.c. around the perimeter of the duct,
except that they may be a maximum of 6” from a corner break. Elsewhere they
shall be a maximum of 16” o.c. , except that they shall be placed not more than
6” from a longitudinal joint of the liner nor 12” from a corner break. In addition
to the adhesive edge coating of transverse joints, any longitudinal joints shall be
similarly coated with adhesive.

8. For velocities from 4,000 to 6,000 feet per minute. Same as 2,001 to 4,000 a
FPM except that metal nosing shall be installed to secure the Aeroflex Duct
Liner at all upstream transverse edges.

E. Noise Control and Sound Traps (Type C):

1. For noise control and sound traps, use lagging. Secure insulation with 100 percent
coverage of lagging adhesive, pins and clips not more than 18 inches on center.

2. Secure bottom of duct insulation using alternate single and double clips. The first pin will
secure the insulation and the second clip will be used to secure the cladding. Isolate the
exterior clip from the cladding by using two 1/8-inch closed cell neoprene (Armaflex)
washers on either side of the cladding. Predrill holes in cladding and avoid contact with
pin during installation.

3. For round duct, secure insulation with 100 percent coverage of lagging adhesive. Secure
cladding with 3/4-inch, 0.020-inch stainless steel bands on 12 inch centers.

4. For joints and overlaps, fold cladding to form a double thickness hem 2 inches minimum.
Seal with a non-shrink, non-hardening sealing compound.

F. Walk-in Plenum Application: Adhere insulation on interior surface of plenum with adhesive
for 100 percent coverage. Secure insulation with mechanical fasteners. Seal and smooth
joints. Do not use nail-type fasteners.

Duct Insulation
Issue Date: November 4, 2002 15081S - 6
G. Continue insulation with vapor barrier through penetrations.

3.03 FLEXIBLE ELASTOMERIC THERMAL INSULATION APPLICATION

A. Follow manufacturer’s written instructions for applying insulation to straight pipes,


tubes, and fittings.

1. Seal longitudinal seams and end joints with manufacturer’s recommended


adhesive. Cement to avoid openings in insulation that will allow passage of air to
the pipe surface.

3.04 FIELD-APPLIED JACKET APPLICATION

A. Exterior: Apply aluminum jacketing to all external piping that is insulated. Cover
all fittings, valves, and specialties with aluminum jacketing.

B. Apply metal jacket where indicated, with 2-inch overlap at longitudinal seams and
end joints. Secure jacket with aluminum bands or sheet metal screws on 12 inches
centers and at end joints. On piping exposed to the weather, overlap longitudinal
seams arranged to shed water and seal end joints with weatherproof mastic.

C. Apply PVC jacketing where indicated, with 2-inch overlap at longitudinal seams and
and at fitting covers, the maximum the cover allows. Seal longitudinal seams by
joining with PVC welding solvent. Seal circumferential ends with 1/1/2” PVC tape.

3.05 SCHEDULE

A. Provide insulation or liner for duct in accordance with the following schedule:

ALL BUILDINGS EXCEPT MICROFAB


Insulation or
Duct Type Liner Thickness
Combustion Air Duct A or B 1"
Exhaust Ducts in Mechanical Rooms or within A or B 1"
10 feet of Exterior Openings and Exhaust Ducts
Exposed to Outdoor Air
Outside Air Intake Ducts C 2"
Plenums A or B 1"
Ventilation Equipment Casings A or B 2"
Concealed Round, Rectangular, Supply or Return A or B 1"
Ducts
Exposed Round Supply, Exhaust or Return Duct C 1"

Duct Insulation
Issue Date: November 4, 2002 15081S - 7
ALL BUILDINGS EXCEPT MICROFAB
Insulation or
Duct Type Liner Thickness
Rectangular or round Supply, Exhaust or return C 2"
ducts in Mechanical Rooms and within 30 feet
of the Mechanical Room or Air Handler
Return Air Boots C 1”
Supply ductwork downstream of VAV boxes. C 1”

Duct Insulation
Issue Date: November 4, 2002 15081S - 8
B. Provide insulation or liner for duct for the MicroFab only in accordance with the
following schedule:

MICROFAB

Duct Type Insulation


Thickness
Recirculation Units RAH 1-30 N/A N/A
Make-up Air Units MAH 1-3 Supply N/A N/A
Make-up Air Unit MAH 4
Supply Outside Bldg. B 1 ½”
Supply Inside Bldg. N/A N/A
Make-up Air Unit MAH 5
Supply Air Outside Bldg. B 1½”
Supply Air Inside Bldg. A or B 1-½”
Return Air Outside Bldg. B 1½”
Return Air Inside Bldg. N/A N/A
Supply Air Inside Building above Certified E ½”
Areas
Air Handling Units AHU 1, 3, 4, 5
Supply Air A or B 1½”
Return Air A or B 1½”
Air MicroFab Outside
Air Intakes B 1½”

END OF SECTION

Duct Insulation
Issue Date: November 4, 2002 15081S - 9

You might also like