Abstract-Geographic information systems(G1S) spatial searching, spatial analysis and the selected substation
platform is used in spatial load forecasting (SLF) and the location retrieving, puts forward a new algorithm which can
mathematical models of the substation location and solve the multi-period optimal selecting problem of substation
capacity optimal problems are established in this paper. based on network flow theory. This method can decide the
Based on the theory of network flow, a new multi-period location and capacity of reasonable substation and its running
optimal selecting algorithm of substation is proposed, time to meet the needs of load development of planning period,
which could determine the reasonable location, capacity and minimize the expense of investment and running
and time that put into running of the substation. The real maintenance.
instance shows that this algorithm could solve the multi
period optimal selecting problem of substation in 11. GIs PLATFORM
distribution system planning (DSP) successfully, and has
the practical value. GIS is a crossing subject and technique among information
science, spatial science and geographic science. Since the
Index Terms-- Geographic information system, Spatial load 1980s, GIS has extended into many applying field, and its
forecasting, Substation, Distribution system planning, Optimal definition has enlarged, in a conclusion, the information
planning, Network flow.
system related geographic location all can be called GIs.
SLF and DSP both involve a great amount of special
1. INTRODUCTION
information. DSP must have a platform, i.e. GIS platform, to
W ith the fast development of city distribution system, it’s correlate the characteristic of distribution planning. GIS
an important subject for power system planning to platform not only provides an environment of distributing
extend distribution system planning (DSP). DSP is a complex devices’ spatial data (e.g. location, shape and connecting
systemic project. The prominent properties of its complexity relation) correlating with the properties’ data, but also supplies
are large-scale, uncertainty, much un-subtle factor and multi- the analytical tools (devices’ connection analysis, min-short
domains. DSP requires not only a great deal of the’ city path analysis) which allow the distribution system exploring
development history data, but also analyses totally the present staff to solve the professional problem on high point [6].
city network and the future city development. It is The mode of planning will change by introducing GIS
dissatisfactory for modern city distribution system to depend platform into DSP. Firstly, GIS is convenient for the
on the experience of planning staff to plan future power system. management of planning data and improve the productivity of
SLF is the basis of DSP and automatic planning. To plan the planning staff. Meanwhile the planning process is more direct
decision- variables of substation location and capacity, the and more interactive. Secondly, GIS conveniently assists
type of wire and its path, the equipment of switcher devices planning staff to decide location of the selected substation and
and their running time, the future load must be established in the corridor of aerial-wire and the path of cable, which may
each area of power distribution domain. SLF not only forecasts shorten the searching scopes of optimal planning procedure
the quantities of future load, but also provides the location of and let the planning result more accordant with the practice.
the load increment, i.e. the spatial distribution of hture load Thirdly, the introduction of GIS platform can synchronize the
[11-[31. DSP with the city planning.
SLF involves a great amount of spatial information. GIS can
provide a platform of collecting, processing data and 111. SPATIAL LOAD FORECASTING
forecasting results for SLF. Applying GIS to SLF can decrease
Load forecasting is the basic work of the distribution system
the quantities of data collecting, so it is practical and necessary
planning, the precision of which directly affects the quality of
for SLF.
the whole planning work. Load forecasting is consist of
This paper, based on SLF and applied GIS’s functions of
classified power and the forecasting of the whole power,
classified load and the forecasting of the entire load, load
ZHOU Quan, SUN Caixin, CHEN Guoqing, DENG Qun and LlAO curve forecasting and load distribution forecasting. The based
Ruijin are with the key Laboratory of High Voltage Engineering and Electrical and pivotal work is the load distribution planning, which is
New Technology, ChongQing University, Ministry of Education. China, also called spatial load forecasting.
400044 (e-mail. [email protected])
- 886 -
determine the geographic location, capacity and the time that J,-@her of the load point substation i supplies the
put into running of every substation in order to satisfy the need power for
of load development in the planning period and minimize the d,-the distance of line from substation i to load pointj
fee of invest and running maintain. Because the geographic &--the capacity of the No. i substation
location, power-supply scope, capacity and the time that put e(SJ-utilization rate of the No. i substation
into running of every substation is unknown and they influence
cos +-power factor
and restrict one another, there are a mass of combination
r -fee coefficient of network wastage
scheme .The whole problem is rather complicated plus other
factors , such as landform and traffic [7],[8].
The substation location and capacity optimal problems are
,.?
,=I , c l ,
d,, in objective function approximately
divided into objective year and middle year, which could be represented the network wastage and investment , when
solved step by step. Using the distribution network planning a,@'') are approximately equal. We can adjust the area of
GIS developed by ourselves, we can determine the geographic
every districts to make the load of every districts
location, capacity and power-supply area of substations in
approximately equal .The network flow model of optimizing
objective year which have been optimized, and quickly find
problem of substation is explained physically in
the optimizing planning scheme in middle years through
computer automatically searching big scopes in a electronical
external
map. tlux
Based on the theory of network flow, a new multi period
optimal selecting algorithm of substation is proposed. The
principle is to attribute the fees of all substations to each arc-
line from the substation to the load point, which sharply reduce
the calculation and avoid possibly non-convergence when
adopting network flow.
A The Mathematical and Network Flow Models of the
Substation Location and Capacity Planning Problems.
fig 2 The network tlow model of optimizing problem of substation
The fee of a substation includes two parts: one is the fixed,
another is the alterable. The former relates to design, using
The right nodes express the load points ,and the external
ground area and iron loss independent of the flux through the
flux at every point is negative , which indicate the needed
component. The other includes the part investment and copper
load ,. These lines represent the distribution lines, and have
loss of the substation .It increases with the growth of the flux ,
the linear fee and the corresponding capacity. Every arc-lines
while the bound fee descends a little . The fixed fee in fee
off the points represent the standby substations which satisfy
function is zero for the established substations. So the
load demand of the optimizing objective year, the value of hF
optimizing problem of the substation in single period can be
and hV respectively represent the fixed and variable fees of
represented as following:
N.SF "\U
present period investing substations. The capacity of arc-line
min Z= c ( h & xx, +hV, x A ) + x ( h V kx f , ) + . ~ C Wxd,/ represents economical supply of standby substations.
!=I k=l ,=I /El,
B. The optimizing problem of substation in the objective year
s.l. C w , < ~ , x e ( ~ , ) x c o s y ,( i = 1 , 2 , . . . ~ ) The optimizing problem of substation in the objective
/ e 1,
f, S X , X C XCOSY,
~ (k=I,2,...NSF) year is described as that: the location and capacity of
f, -< C, x COS^ ( k = 1,2;.. NSU) substation rest on the minimum fee of the investment and
running. We suppose that there exists a load point in the center
f, 2 0 ( k = 1,2,...N)
of every district, and the load is equal to load density
x, = 0 or 1 ( k = 1,2,...NSF) multiplying the area of this district, so the fee of all investment
in equation and running in whole year is shown in equation (1 ).
NSU-numbers of substations utilization c=c,+c, (1)
NSF-numbers of substations future In equation c-
N= NSU+ NSF
f; - t h e load magnitude of substation I, fee of construction investment and running.
c k -the
x, 7 ,
capacity of the No. k substation,
is equal to 1,if substation i is built during the C, = cc
N
Wfd,, - -the estimated fee of lower-
,=I I d #
current stage, or x, is equal to 0,
w ,--the load magnitude in load point j , voltage-network wastage ;
Equation ( 2 - 1 ) is reduced as following equation:
- a87 -
N N are the pending constructing substations and lines. The
rninC=Cfz(S,)+rCCW,d,/ (2) ’
,=I !=I ,El,
calculational result is shown in Tab.11.
s.t. CW,~ s , e ( s , ) c o s p i=1,2,...,N
I€!,
- 888 -
[7] E -C Yeh, H Tram “Information Integration in Computerized [SI V H Quintana, H K Temraz, K W Hipel “Two-stage Power System
Distribution System Planning” [J] lEEE Transacfronon Power Systems, Distribution Planning Algorithm”[J] IEE Proceedins-C, Vol40, NO I ,
Vol 12,No 3, pp 1008-1013, May 1997 pp 17-29, January I993
VIII. BIOGRAPHIES
Zhou Quan was bani in Zigong city of Sun Cnixin was born in Chongqing, China, on
SiChuan province, China, on January 30, 1973 December 13, 1944. He graduated in electrical
He graduated in electrical engineering from engineering from Chongqing University. He
Chongqing University with B E in 1994 and works in department of electrical engineering of
M E i n 1998, and has been assiduously Chongqing University from 1966 to present. He
studying Ph D degrees of Electrical Engineering is a standing director of China Electrotechnical
in Chongqing University, China, Meanwhile he Society and one of directors of Chinese Society
become the faculty of.department of electrical for Electrical Engineering. His current research
engineering of Chongqing University His interests include online detection of insulation
special fields of interest included power system condition and insulation fault diagnosis for HV
planning, DMS, SLF, and GIS apparatus, discharge mechanism in complicated
environment, geography infonnation system and high voltage technique
applied in biomedicine. Hle is an author ofover 200 publication and invention.
- 889 -