Compound wall-SOUTH
Compound wall-SOUTH
2
Earth work Excavation for CRS:-
CUM 1 144.24 0.6 0.6
TOTAL QTY CUM
8 COLUMN
HWALL CUM 45 0.3 0.23 6.5
TOTAL QTY CUM
9 PLINTH BEAM
HWALL CUM 1 133.89 0.23 0.3
TOTAL QTY CUM
10 BEAM
HWALL CUM 1 144.24 0.23 0.3
TOTAL QTY CUM
15 Centring Work
A BED CONCRETE
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM
B FOOTING MAT
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM
TONS
Quantity Remarks
83.15
11.23
94.38
51.9264
51.93
94.38
6.93
0.94
12.30
1.80
3.73
76.14
6.93
0.94
7.87
8.65
8.65
13.39
4.87
18.26
12.3
1.8
14.10
20.1825
20.18
9.23841
9.24
9.95256
9.95
212.0328
212.03
59.433771
59.43
278.3832
278.38
278.3832
278.38
63.96
6.72
70.68
63.96
6.72
70.68
310.05
310.05
141.9234
51.6432
193.57
152.8944
55.7878
208.68
853.66
8
COMPOUND WALL
TOTAL
Amount
28314
15577.92
15228.2
43257.5
100435.5
0
47599.2
121965
186688.125
79912.2465
89573.04
1378213.2
475470.168
167029.92
48717.06
512195.28
760000
4070176.36