This document provides a quantity sheet for compound wall construction. It lists 16 items of work required, including earthwork excavation, refilling excavated soil, PCC beds and footings, brickwork, plastering, painting, and reinforcement. The total quantities of each item are given in units like CUM, SQM, and tons. The document also provides the rates for each item and calculates the total amount to Rs. 40,701,176.36.

Uploaded by

Sitaram PREDCR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views8 pages

Compound wall-SOUTH

This document provides a quantity sheet for compound wall construction. It lists 16 items of work required, including earthwork excavation, refilling excavated soil, PCC beds and footings, brickwork, plastering, painting, and reinforcement. The total quantities of each item are given in units like CUM, SQM, and tons. The document also provides the rates for each item and calculates the total amount to Rs. 40,701,176.36.

Uploaded by

Sitaram PREDCR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

COMPOUND WALL QUANTITY SHEET

S.NO Discription Unit NO's. Length Width Depth

1 Earth work Excavation for


Footings
HWALL CUM 41 1.3 1.3 1.2
HWALL CUM 4 1.8 1.3 1.2
TOTAL QTY CUM

2
Earth work Excavation for CRS:-
CUM 1 144.24 0.6 0.6
TOTAL QTY CUM

3 Refilling with Excavated soil for Footings


Footings earth work total Qty CUM
Deduction
PCC Bed for Footings
HWALL CUM 41 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
FOOTING
HWALL CUM 41 1 1 0.3
HWALL CUM 4 1.5 1 0.3
COLUMN
HWALL CUM 45 0.3 0.23 1.2
TOTAL QTY CUM

4 P.C.C. Bed FOR FOOTINGS


HWALL CUM 41 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
TOTAL QTY CUM

5 PCC BED FOR CRS WALL


CUM 1 144.24 0.6 0.1
TOTAL QTY CUM

6 P.C.C. Bed below Plinth Beam


CUM 1 133.89 0.38 0.1
CUM 1 48.72 0.38 0.1
TOTAL QTY CUM
7 FOOTING
HWALL CUM 41 1 1 0.3
HWALL CUM 4 1.5 1 0.3
TOTAL QTY CUM

8 COLUMN
HWALL CUM 45 0.3 0.23 6.5
TOTAL QTY CUM

9 PLINTH BEAM
HWALL CUM 1 133.89 0.23 0.3
TOTAL QTY CUM

10 BEAM
HWALL CUM 1 144.24 0.23 0.3
TOTAL QTY CUM

11 CRS WALL CUM 1 144.24 0.6 2.45


TOTAL QTY CUM

12 9" Brick work


HWALL CUM 1 133.89 1.93 0.23
TOTAL QTY CUM

13 External Walls Plastering


HWALL SQM 1 144.24 1.93
TOTAL QTY SQM

14 External Walls Painting


HWALL SQM 1 144.24 1.93
TOTAL QTY SQM

15 Centring Work
A BED CONCRETE
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM

B FOOTING MAT
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM

C Columns SQM 45 1.06 6.5


TOTAL QTY SQM
D Plinth Beams
HWALL SQM 1 133.89 1.06
CWALL SQM 1 48.72 1.06
TOTAL QTY SQM
E Floor Beams
HWALL SQM 1 144.24 1.06
CWALL SQM 1 52.63 1.06
TOTAL QTY SQM
TOTAL QTY

Providing High Yield Strength


Deformed (HYSD) Steel bars (Fe 500
grade as per IS 1786-1985) of 8mm to
40mm diameters, cutting, bending, to
required sizes and shapes placing in
position with cover blocks of approved
size and binding wire of 20SWG,
forming grills for reinforcement work
as per approved designs and
drawings including cost and
conveyance of bars from approved
sources to site of work, including cost
16 and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers,
dowels, wastage etc., and all
operational, incidental, and labour
charges such as cutting, bending,
placing in position tying etc., and sales
& other taxes,on cost of all materials
complete for finished item of work
(APSS No. 126)

TONS
Quantity Remarks

83.15
11.23
94.38

51.9264
51.93

94.38

6.93
0.94

12.30
1.80

3.73
76.14

6.93
0.94
7.87

8.65
8.65

13.39
4.87
18.26

12.3
1.8
14.10

20.1825
20.18

9.23841
9.24

9.95256
9.95

212.0328
212.03

59.433771
59.43

278.3832
278.38

278.3832
278.38

63.96
6.72
70.68

63.96
6.72
70.68

310.05
310.05
141.9234
51.6432
193.57

152.8944
55.7878
208.68
853.66

8
COMPOUND WALL

S.No Description of Work UNIT QUANTITY RATE


Earth work Excavation for
1 CUM 94.38 300
Footings

Earth work Excavation for CUM


2 51.93 300.00
CRS:-

Refilling with Excavated soil


3 CUM 76.14 200.00
for Footings

5 P.C.C. Bed FOR FOOTINGS CUM 7.87 5,500.00

6 P.C.C. Bed below Plinth Beam CUM 18.261 5500

7 P.C.C Below CRS Wall CUM 8.6544 5500

8 FOOTING CUM 14.1 8650

9 COLUMNS CUM 20.18 9,250.00

10 PLINTH BEAM CUM 9.24 8,650.00

11 BEAMS CUM 9.95 9,000.00

12 CRS WALL CUM 212.03 6,500.00

13 9" Brick work CUM 59.43 8,000.00

14 External Walls Plastering SQM 278.38 600.00

15 External Walls Painting SQM 278.38 175.00

16 Centring Work SQM 853.66 600.00

17 Reinforcement tons 8.00 95,000.00

TOTAL
Amount
28314

15577.92

15228.2

43257.5

100435.5
0
47599.2

121965

186688.125

79912.2465

89573.04

1378213.2

475470.168

167029.92

48717.06

512195.28

760000

4070176.36