0% found this document useful (0 votes)
131 views22 pages

05 C1 Hydraulic Calculation-Sewage Treatment Facility

The document contains hydraulic calculations for various components of a sewage treatment plant (STP) including: 1. Maximum daily and peak hour flows for Phase 1 and future capacity of the STP. 2. Water levels and discharge rates for the effluent discharge chamber and calculations of head loss. 3. Flow rates and water depths for the inflow and outflow parts of Parshall flumes and associated head losses. 4. Flow rate, water depth, velocity and head losses for the effluent collection chamber.

Uploaded by

manowar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views22 pages

05 C1 Hydraulic Calculation-Sewage Treatment Facility

The document contains hydraulic calculations for various components of a sewage treatment plant (STP) including: 1. Maximum daily and peak hour flows for Phase 1 and future capacity of the STP. 2. Water levels and discharge rates for the effluent discharge chamber and calculations of head loss. 3. Flow rates and water depths for the inflow and outflow parts of Parshall flumes and associated head losses. 4. Flow rate, water depth, velocity and head losses for the effluent collection chamber.

Uploaded by

manowar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

Appendix C

C1 Hydraulic Calculation - STP

C2 Hydraulic Calculation - Storm Water Drainage

C3 Soft ground Settlement Calculation

C4 Structure Foundation Stability Calculation

C5 Slope Stability Analysis

C6 Structural Calculation
□ Hydraulic Calculation
Type Hydraulic Calculation

Phase 1 CF

Maximum Daily Flow(MDF) Q= 150,000 ㎥/d 500,000 ㎥/d

Maximum Peak Hour Flow(PHF) Q= 300,000 ㎥/d 1,000,000 ㎥/d

※ CF : to be considered for future

High Water Level · H.W.L : 4.000 m

∴ Discharge Water Level

= 4.000 m

○ Effluent Discharge Chamber


Q= 1,000,000 ㎥/d = 11.574 ㎥/sec

Discharge Chamber · Diameter(D) : 1,500 ㎜

(Inverted Siphon) · No. of basins : 4 nos.

· Length(L) : 122.00 m

· Pipe Crown EL. : : -0.600 m

· Velocity(V) : = 11.574 ÷ 7.065 = 1.638 m/sec

· Slope (I) : 0.004

● Head Loss(H)= I ㆍ L + βㆍ (V2/2g) + α = 0.743 m

∴ Water level

= 4.000m + 0.743m = 4.743 m

-1-
C1 - 1
Type Hydraulic Calculation

○ Effluent Chamber
Q= 500,000 ㎥/d = 5.787 ㎥/sec

Outflow part of Parshall Flume · Specification : W 3.20m × H 1.90m × 4 nos.

~ Discharge Chamber · Length(L) : 14.80 m

· INV. EL : 3.000 m

· Coefficient of roughness(n) : 0.015

· Slope (I) : 1.000 ‰

# Calculation depth using hydraulic characteristic curve(Q/Qfull factor)

1) Qfull = A × V

A=W×H= 24.320 ㎡

V=1/n × R2/3 × I1/2 = 2.719 m/sec

n= 0.015 R=B×H/(B+2H)= 1.465

Qfull = A × V = 66.135 ㎥/sec

2) Q= 500,000 ㎥/d = 5.787 ㎥/sec

3) Q/Qfull = 0.088 ≒ 8.8 %

4) Caculation depth ratio using hydraulic characteristic curve

Depth ratio(%) = 20.0 %

∴Depth (H)= Ho × Depth Ratio = 0.380 m

Depth (H) : 1.743 > 0.380 ⇒ 1.743 m

· Specification : 3.200m × 1.743m × 4 nos.

· Velocity (V) = Q ÷ A

= 5.787 ÷ 22.315 = 0.259 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.005 m (fio = 1.5)

2) Friction Loss(hf) = (n × V / R2/3)2 × L = 0.000 m

(n= 0.015) (R=B×H/(B+2H)= 1.370)

∴∑Δh= 0.005 + 0.000 = 0.005 m

∴ Water level

= 4.743m + 0.005m = 4.748 m

-2-
C1 - 2
Type Hydraulic Calculation

Q= 125,000 ㎥/d/nos = 1.447 ㎥/sec

Parshall Flume · q (ℓ/sec) 1,447 ℓ/sec

· No. of basins : 4 nos.

· Width(W ) : 122 ㎝

· q = (3.711/(115.66×W0.026))×W×Ha1.39×w^0.026
1.595
· q = 5.591×Ha
1/1.595
· Water Depth(Ha=(0.340×q )/100) = 0.462 m

● Head Loss

∴∑Δh= 0.462 = 0.462 m

∴ Water level

4.748m + 0.462m = 5.211 m

Q= 125,000 ㎥/d/nos = 1.447 ㎥/sec

Inflow part of Parshall Flume · Specification : W 3.20m × H 1.90m × 4 nos.

· Length(L) : 20.00 m

· INV. EL : : 3.000 m

· Water Depth(H) : 5.211m - 3.000m = 2.211 m

· Area(A) = 12.800m × 2.211m = 28.296 ㎡

· Velocity(V) = Q ÷ A = 0.051 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.000 m (fio = 1.5)

2) Friction Loss(hf)

hf = (n × V / R2/3)2 × L = 0.000 m

(n= 0.015) (R=B×H/(B+2H)= 1.643)

∴∑Δh= 0.000 + 0.000 = 0.000 m

∴ Water level

5.211m + 0.000m = 5.211 m

Q= 500,000 ㎥/d = 5.787 ㎥/sec

Effluent collection chamber · Gate Specification : W 3.20m × H 1.90m × 4 pcs.

· Gate Bottom Elevation : (+) 3.000 m

· Water Depth(H) : 5.211m - 3.00m = 2.211 m

1.90m < 2.21m = 2.211 m

· Surface Area(A) : 12.80m × 2.21m = 28.296 ㎡

· Velocity(V) : Q ÷ A = 0.205 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.003 m (fio = 1.5)


2
2) Orifice Head Loss = (V/2.75) = 0.006 m

∴∑Δh= 0.003 + 0.006 = 0.009 m

∴ Water level

= 5.211m + 0.009m = 5.220 m

-3-
C1 - 3
Type Hydraulic Calculation

○ Secondary Clarifier
1 Q= 300,000 ㎥/d = 3.472 ㎥/sec

Outflow part of Secondary Clarifier · Diameter(D) : 1,500 ㎜

~ Effluent Chamber · Length(L) : 17.00 m

· Velocity(V) = 3.472 ÷ 1.766 = 1.966 m/sec


2
1) Exit Loss(hio) = fio×V /2g = 0.197 m (fio = 1)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)


2
h = f × (L /D) × (V / 2g) = 0.054 m (f = 0.024)

∴∑Δh= = 0.251 m

2 Q= 50,000 ㎥/d = 0.579 ㎥/sec

· Diameter(D) : 1,000 ㎜

· Length(L) : 5.00 m 4 pcs.

· Velocity(V) = 0.579 ÷ 0.785 = 0.738 m/sec


2 1/3
1) Friction loss(Darcy Equation) (f =124.5×n /(D) )
2
h = f × (L /D) × (V / 2g) = 0.004 m (f = 0.028)

2) Confluence Loss(h) = K×V2 /2g = 0.011 m (K = 0.4)

∴∑Δh= = 0.060 m

3 Q= 50,000 ㎥/d = 0.579 ㎥/sec

· Diameter(D) : 1,000 ㎜

· Length(L) : 81.00 m 1 pcs.

· Velocity(V) = 0.579 ÷ 0.785 = 0.738 m/sec


2 1/3
1) Friction loss(Darcy Equation) (f =124.5×n /(D) )
2
h = f × (L /D) × (V / 2g) = 0.063 m (f = 0.028)

2) Confluence Loss(h) = K×V2 /2g = 0.011 m (K = 0.4)

3) Bends Loss (hr) = fb×(V2/2g)×n= 0.014 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= = 0.088 m

4 Q= 200,000 ㎥/d = 2.315 ㎥/sec

· Diameter(D) : 1,500 ㎜

· Length(L) : 41.00 m

· Velocity(V) = 2.315 ÷ 1.766 = 1.311 m/sec

1) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)

h = f × (L /D) × (V2 / 2g) = 0.057 m (f = 0.024)

2) Confluence Loss(h) = K×V2 /2g = 0.035 m (K = 0.4)

∴∑Δh= = 0.092 m

-4-
C1 - 4
Type Hydraulic Calculation

5 Q= 150,000 ㎥/d = 1.736 ㎥/sec

Outflow part of Secondary Clarifier · Diameter(D) : 1,200 ㎜

~ Effluent Chamber · Length(L) : 41.00 m

· Velocity(V) = 1.736 ÷ 1.130 = 1.536 m/sec


2 1/3
1) Friction loss(Darcy Equation) (f =124.5×n /(D) )

h = f × (L /D) × (V2 / 2g) = 0.107 m (f = 0.026)

2) Confluence Loss(h) = K×V2 /2g = 0.048 m (K = 0.4)

∴∑Δh= = 0.155 m

6 Q= 100,000 ㎥/d = 1.157 ㎥/sec

· Diameter(D) : 1,200 ㎜

· Length(L) : 41.00 m

· Velocity(V) = 1.157 ÷ 1.130 = 1.024 m/sec


2 1/3
1) Friction loss(Darcy Equation) (f =124.5×n /(D) )
2
h = f × (L /D) × (V / 2g) = 0.047 m (f = 0.026)
2
2) Confluence Loss(h) = K×V /2g = 0.021 m (K = 0.4)

∴∑Δh= = 0.068 m

7 Q= 50,000 ㎥/d = 0.579 ㎥/sec

· Diameter(D) : 1,000 ㎜

· Length(L) : 81.00 m 1 pcs.

· Velocity(V) = 0.579 ÷ 0.785 = 0.738 m/sec

1) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)


2
h = f × (L /D) × (V / 2g) = 0.063 m (f = 0.028)
2
2) Confluence Loss(h) = K×V /2g = 0.011 m (K = 0.4)

3) Bends Loss (hr) = fb×(V2/2g)×n= 0.014 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= = 0.088 m

∴ Water level

5.220m + 0.803m = 6.023 m

-5-
C1 - 5
Type Hydraulic Calculation

Q= 25,000 ㎥/d = 0.289 ㎥/sec

Secondary Clarifier · TROUGH FL. = 6.110 m

· TROUGH Width(B) = 1.50 m

· TROUGH Length(L) = 97.40 m

· TROUGH Slope = 0.000 ‰

· Free Overfall

ho = [(2hc^2)+(hc-il/3)^2]^(1/2) - (2*i*l) /3
1/3
1) Critical Depth(hc)=(αQ²/g×B²) (α = 1.10)

= 0.161 m

2) Trough Upstream Depth(ho)= 0.279 m

∴ Trough Upstream : 6.110 + 0.279 = 6.389 m

∴ Trough Height : 6.389 < 6.710 = 6.710 m

∴ Weir Height : 6.710 = 6.710 m

· Notch Length : 0.2 m/EA

· Weir Height : 6.710 m

· Weir breadth : 97.4 m

· No. of Weir(V-notch) : 487 EA

Q= 25,000 ㎥/d = 0.289 ㎥/sec

· Flow per Notch = 0.00059 ㎥/sec

· Overflow Depth(H) = (Q/1.42)(2/5) = 0.045 m

∴ Water level

= 6.710m + 0.045m = 6.755 m

-6-
C1 - 6
Type Hydraulic Calculation

○ Biological Treatment Facilities


1 Q= 50,000 ㎥/d = 0.579 ㎥/sec

Outflow part of Oxidation Ditch · Diameter(D) : 800 ㎜

~ Secondary Clarifier · Length(L) : 40.00 m

· Velocity(V) = 0.579 ÷ 0.502 = 1.152 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.102 m (fio = 1.5)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)


2
h = f × (L /D) × (V / 2g) = 0.102 m (f = 0.03)

∴∑Δh= 0.102 + 0.102 = 0.204 m

2 Q= 50,000 ㎥/d = 0.579 ㎥/sec

· Diameter(D) : 800 ㎜

· Length(L) : 78.00 m 2 pcs.

· Velocity(V) = 0.579 ÷ 0.502 = 1.152 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.102 m (fio = 1.5)
2 1/3
2) Friction loss(Darcy Equation) (f =124.5×n /(D) )

h = f × (L /D) × (V2 / 2g) = 0.198 m (f = 0.03)

∴∑Δh= 0.102 + 0.198 * 2 = 0.498 m

∴ Water level

= 6.755m + 0.702m = 7.457 m

Q= 61,875 ㎥/d = 0.716 ㎥/sec

Oxidation Ditch · Weir Height : 7.500 m

· Weir Width(B) : 4.0 m/nos.

· No. of Weirs : 1 nos.

● Overflow Depth(H)= (Q/(C×B))2/3 = 0.212 m (C= 1.84)

∴ Water level

= 7.500m + 0.212m = 7.712 m

-7-
C1 - 7
Type Hydraulic Calculation

Q= 193,125 ㎥/d = 2.235 ㎥/sec

Inflow Part of Oxidation Ditch · Width(B) = 10.00 m

· Length(L) = 430.00 m

· Bottom EL. = 2.500 m

· Depth(H) : = 7.712 - 2.500 = 5.212 m

· Velocity(V) = 2.235 ÷ 5.212 = 0.429 m/sec

● Head Loss
2/3 2
1) Friction Loss(hf) = (n × V / R ) × L = 0.005 m

(n= 0.015) (R=B×H/(B+2H)= 2.552)


2
2) Bends Loss (hr) = fb×(V /2g)×n= 0.033 m (n = 7)

(n = No. of Bends, 90 degree bend fb= 0.5)

∴∑Δh= 0.005 + 0.033 = 0.038 m

∴ Water level

= 7.712m + 0.038m = 7.750 m

Q= 193,125 ㎥/d = 2.235 ㎥/sec

Anoxic Chamber · Gate Specification : W 0.76m × H 6.00m × 1 pcs.

· Gate Bottom Elevation : (+) 2.500 m

· Water Depth(H) : 7.750m - 2.500m = 5.250 m

· Surface Area(A) : 0.760m × 5.250m = 3.990 ㎡

· Velocity(V) : Q ÷ A = 0.560 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.024 m (fio = 1.5)

∴∑Δh= 0.024 = 0.024 m

∴ Water level

= 7.750m + 0.024m = 7.774 m

Q= 61,875 ㎥/d = 0.716 ㎥/sec

Anaerobic Chamber #3 · Gate Specification : W 6.75m × H 1.00m × 1 pcs.

· Gate Bottom Elevation : (+) 2.500 m

· Water Depth(H) : 7.774m - 2.500m = 5.274 m

1.000m < 5.274m = 1.000 m

· Surface Area(A) : 6.750m × 1.000m = 6.750 ㎡

· Velocity(V) : Q ÷ A = 0.106 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.001 m (fio = 1.5)

2) Orifice Head Loss = (V/2.75)2= 0.001 m

∴∑Δh= 0.001 + 0.001 = 0.002 m

∴ Water level

= 7.774m + 0.002m = 7.776 m

-8-
C1 - 8
Type Hydraulic Calculation

Q= 61,875 ㎥/d = 0.716 ㎥/sec

Anaerobic Chamber #2 · Gate Specification : W 5.00m × H 1.00m × 1 pcs.

· Gate Bottom Elevation : (+) 6.500 m

· Water Depth(H) : 7.776m - 6.500m = 1.276 m

1.000m < 1.276m = 1.000 m

· Surface Area(A) : 5.000m × 1.000m = 5.000 ㎡

· Velocity(V) : Q ÷ A = 0.143 m/sec

● Head Loss
2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.002 m (fio = 1.5)
2
2) Orifice Head Loss = (V/2.75) = 0.003 m

∴∑Δh= 0.002 + 0.003 = 0.005 m

∴ Water level

= 7.776m + 0.005m = 7.781 m

Q= 61,875 ㎥/d = 0.716 ㎥/sec

Anaerobic Chamber #1 · Gate Specification : W 5.00m × H 1.00m × 1 pcs.

· Gate Bottom Elevation : (+) 3.000 m

· Water Depth(H) : 7.781m - 3.000m = 4.781 m

1.000m < 4.781m = 1.000 m

· Surface Area(A) : 5.000m × 1.000m = 5.000 ㎡

· Velocity(V) : Q ÷ A = 0.143 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.002 m (fio = 1.5)


2
2) Orifice Head Loss = (V/2.75) = 0.003 m

∴∑Δh= 0.002 + 0.003 = 0.005 m

∴ Water level

= 7.781m + 0.005m = 7.786 m

Q= 37,500 ㎥/d = 0.434 ㎥/sec

Inlet Chamber · Weir Height : 7.000 m

· Weir Width(B) : 5.0 m

· No. of Weirs : 2 nos.

● Overflow Depth(H)= (Q/(C×B))2/3 = 0.082 m (C= 1.84)

∴ Water level

= 7.786m + 0.082m = 7.868 m

-9-
C1 - 9
Type Hydraulic Calculation

○ Distribution Tank
Q= 75,000 ㎥/d = 0.868 ㎥/sec

Distribution Tank · Diameter(D) : 1,000 ㎜

~ Biological Treatment Facilities · Length(L) : 96.00 m 1 pcs.

· Velocity(V) = 0.868 ÷ 0.785 = 1.105 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.093 m (fio = 1.5)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)


2
h = f × (L /D) × (V / 2g) = 0.168 m (f = 0.028)
2
3) Bends Loss (hr) = fb×(V /2g)×n= 0.032 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= 0.093 + 0.168 + 0.032 = 0.293 m(each)

Q= 75,000 ㎥/d = 0.868 ㎥/sec

· Diameter(D) : 1,000 ㎜

· Length(L) : 12.00 m 1 pcs.

· Velocity(V) = 0.868 ÷ 0.785 = 1.105 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.093 m (fio = 1.5)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)

h = f × (L /D) × (V2 / 2g) = 0.021 m (f = 0.028)


2
3) Bends Loss (hr) = fb×(V /2g)×n= 0.032 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= 0.093 + 0.021 + 0.032 = 0.146 m(each)

∴ Water level

= 7.868m + 0.439m = 8.307 m

Q= 150,000 ㎥/d = 1.736 ㎥/sec

Distribution Tank · Weir Height : 8.400 m

· Weir Width(B) : 2.0 m

· No. of Weirs : 4 nos.

● Overflow Depth(H)= (Q/(C×B))2/3 = 0.245 m (C= 1.84)

∴ Water level

= 8.400m + 0.245m = 8.645 m

Primary Clarifier (Future) Q= 500,000 ㎥/d = 5.787 ㎥/sec

1) Head Loss = 1.000 m

∴ Water level

= 8.645m + 1.000m = 9.645 m

- 10 -
C1 - 10
Type Hydraulic Calculation

○ Preliminary Treatment Works


1 Q= 200,000 ㎥/d = 2.315 ㎥/sec

Fine Screen Outlet Channel · Diameter(D) : 1,500 ㎜

~ Primary Clarifier (Future) · Length(L) : 20.00 m

· Velocity(V) = 2.315 ÷ 1.767 = 1.310 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.131 m (fio = 1.5)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)


2
h = f × (L /D) × (V / 2g) = 0.028 m (f = 0.024)
2
3) Bends Loss (hr) = fb×(V /2g)×n= 0.045 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= 0.131 + 0.028 + 0.045 = 0.204 m

2 Q= 200,000 ㎥/d = 2.315 ㎥/sec

· Diameter(D) : 1,800 ㎜

· Length(L) : 230.00 m

· Velocity(V) = 2.315 ÷ 2.545 = 0.910 m/sec


2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.063 m (fio = 1.5)

2) Friction loss(Darcy Equation) (f =124.5×n2/(D)1/3)

h = f × (L /D) × (V2 / 2g) = 0.124 m (f = 0.023)


2
3) Bends Loss (hr) = fb×(V /2g)×n= 0.022 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= 0.063 + 0.124 + 0.022 = 0.209 m

2 Q= 200,000 ㎥/d = 2.315 ㎥/sec

· Diameter(D) : 2,000 ㎜

· Length(L) : 440.00 m

· Velocity(V) = 2.315 ÷ 3.142 = 0.737 m/sec

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.042 m (fio = 1.5)


2 1/3
2) Friction loss(Darcy Equation) (f =124.5×n /(D) )

h = f × (L /D) × (V2 / 2g) = 0.134 m (f = 0.022)

3) Bends Loss (hr) = fb×(V2/2g)×n= 0.014 m (n = 1)

(n = No. of Bends, 90 degree bend fb= 0.51)

∴∑Δh= 0.042 + 0.134 + 0.014 = 0.190 m

∴ Water level

9.645m + 0.603m = 10.248 m

- 11 -
C1 - 11
Type Hydraulic Calculation

Q= 150,000 ㎥/d = 1.736 ㎥/sec

Fine Screen Outlet Channel · Specification : W 2.30m × H 2.80m × 1 nos.

· Length(L) : 4.00 m

· INV. EL : 9.000 m

· Coefficient of roughness(n) : 0.015

· Slope (I) : 1.000 ‰

# Calculation depth using hydraulic characteristic curve(Q/Qfull factor)

1) Qfull = A × V

A=W×H= 6.440 ㎡
2/3 1/2
V=1/n × R ×I = 1.839 m/sec

n= 0.015 R=B×H/(B+2H)= 0.815

Qfull = A × V = 11.846 ㎥/sec

2) Q= 150,000 ㎥/d = 1.736 ㎥/sec

3) Q/Qfull = 0.147 ≒ 14.7 %

4) Caculation depth ratio using hydraulic characteristic curve

Depth ratio(%) = 25.9 %

∴Depth (H)= Ho × Depth Ratio = 0.725 m

Depth (H) : 1.248 > 0.725 ⇒ 1.248 m

· Specification : 2.300m × 1.248m × 1 nos.

· Velocity (V) = Q ÷ A

= 1.736 ÷ 2.870 = 0.605 m/sec

● Head Loss
2/3 2
1) Friction Loss(hf) = (n × V / R ) × L = 0.001 m

(n= 0.015) (R=B×H/(B+2H)= 0.598)

∴∑Δh= 0.001 = 0.001 m

∴ Water level

= 10.248m + 0.001m = 10.249 m

- 12 -
C1 - 12
Type Hydraulic Calculation

Q= 150,000 ㎥/d = 1.736 ㎥/sec

Fine Screen Channel · Specification : W 2.30m × H 1.70m × 1 nos.

· Length(L) : 14.00 m

· INV. EL : (+) 9.000 m

· Water Depth(H) : 10.249m - 9.000m = 1.249 m

· Surface Area(A) = 2.300m × 1.249m = 2.873 ㎡

· Velocity(V) = Q ÷ A = 0.604 m/sec

● Head Loss

1) Friction Loss(hf)
2/3 2
hf = (n × V / R ) × L = 0.002 m

(n= 0.015) (R=B×H/(B+2H)= 0.599)

∴∑Δh= 0.002 = 0.002 m

∴ Water level

10.249m + 0.002m = 10.251 m

Q= 150,000 ㎥/d = 1.736 ㎥/sec

Fine Screen · Width(B) = 2.30 m

· INV. EL : = 9.000 m

· Water Depth(H) : = 10.249 - 9.000 = 1.249 m

- No. of basins = 1 nos.

- Clear spacing between bars(b) = 6.0 ㎜

- Thickness of bars(t) = 2.0 ㎜

- Angle of bar inclination(θ) = 75.0 ˚

sin(75˚) = 0.966

- Screen loss coefficient(β) = 2.42

- Velocity (V) = 1.736 ÷ 2.873 = 0.604 ㎥/sec

● Head loss

1) Head loss(hs) = β×sinΘ×(t/b)4/3×(V2/2g) = 0.010 m

∴∑Δh= 0.010 = 0.010 m

∴ Inlet Water Level

10.251m + 0.010m = 10.261 m

- 13 -
C1 - 13
Type Hydraulic Calculation

Q= 300,000 ㎥/d = 3.472 ㎥/sec

Grit Chamber · Specification : W 3.90m × H 2.20m × 1 nos.

~ Fine Screen Chamber · Length(L) : 4.00 m

· INV. EL : 10.200 m

· Coefficient of roughness(n) : 0.015

· Slope (I) : 1 ‰

# Calculation depth using hydraulic characteristic curve(Q/Qfull factor)

1) Qfull = A × V

A=W×H= 8.580 ㎡
2/3 1/2
V=1/n × R ×I = 2.156 m/sec

n= 0.015 R=B×H/(B+2H)= 1.034

Qfull = A × V = 18.496 ㎥/sec

2) Q= 300,000 ㎥/d = 3.472 ㎥/sec

3) Q/Qfull = 0.188 ≒ 18.8 %

4) Caculation depth ratio using hydraulic characteristic curve

Depth ratio(%) = 29.4 %

∴Depth (H)= Ho × Depth Ratio = 0.647 m

Depth (H) : 0.061 < 0.647 ⇒ 0.647 m

· Specification : 3.900m × 0.647m × 1 nos.

· Velocity (V) = Q ÷ A

= 3.472 ÷ 2.523 = 1.376 m/sec

● Head Loss
2/3 2
1) Friction Loss(hf) = (n × V / R ) × L = 0.004 m

(n= 0.015) (R=B×H/(B+2H)= 0.486)

2) Enlargement Loss(hge) = fge×V2 /2g = 0.070 m (fge = 0.72)

∴∑Δh= 0.004 + 0.070 = 0.074 m

∴ Water level

= 10.847m + 0.074m = 10.921 m

- 14 -
C1 - 14
Type Hydraulic Calculation

Q= 300,000 ㎥/d = 3.472 ㎥/sec

Grit Chamber · Specification : W 1.80m × H 1.70m × 2 nos.

· Length(L) : 18.40 m

· INV. EL : 10.200 m

· Roughness Coefficient (n) : 0.015

· Slope (I) : 1.000 ‰

· Weir Height : 11.000 m

· Weir Width(B) : 1.8 m

· No. of Weirs : 2 nos.

# Calculation depth using hydraulic characteristic curve(Q/Qfull factor)

1) Qfull = A × V

A=W×H= 6.120 ㎡
2/3 1/2
V=1/n × R ×I = 1.927 m/sec

n= 0.015 R=B×H/(B+2H)= 0.874

Qfull = A × V = 11.794 ㎥/sec

2) Q= 300,000 ㎥/d = 3.472 ㎥/sec

3) Q/Qfull = 0.294 ≒ 29.4 %

4) Caculation depth ratio using hydraulic characteristic curve

Depth ratio(%) = 37.2 %

∴Depth (H)= Ho × Depth Ratio = 0.632 m

Depth (H) : 0.721 > 0.632 ⇒ 0.721 m

· Specification : 1.80m × 0.721m × 2 nos.

· Velocity (V) = Q ÷ A

= 3.472 ÷ 2.595 = 1.338 m/sec

● Head Loss

1) Friction Loss(hf) = (n × V / R2/3)2 × L = 0.114 m

(n= 0.015) (R=B×H/(B+2H)= 0.129)

2) Weir Overflow(H)= (Q/(C×B))2/3 = 0.650 m (C= 1.84)

∴∑Δh= 0.114 + 0.650 = 0.764 m

∴ Water level

= 11.000m + 0.764m = 11.764 m

- 15 -
C1 - 15
Type Hydraulic Calculation

○ Influent Chamber
Q= 300,000 ㎥/d = 3.472 ㎥/sec

Outflow part of Parshall Flume · Specification : W 3.90m × H 2.10m × 1 nos.

~ Preliminary Treatment Works · Length(L) : 4.00 m

· INV. EL : 10.200 m

· Coefficient of roughness(n) : 0.015

· Slope (I) : 1.000 ‰

# Calculation depth using hydraulic characteristic curve(Q/Qfull factor)

1) Qfull = A × V

A=W×H= 8.190 ㎡

V=1/n × R2/3 × I1/2 = 2.124 m/sec

n= 0.015 R=B×H/(B+2H)= 1.011

Qfull = A × V = 17.392 ㎥/sec

2) Q= 300,000 ㎥/d = 3.472 ㎥/sec

3) Q/Qfull = 0.200 ≒ 20.0 %

4) Caculation depth ratio using hydraulic characteristic curve

Depth ratio(%) = 30.3 %

∴Depth (H)= Ho × Depth Ratio = 0.636 m

Depth (H) : 1.564 > 0.636 ⇒ 1.564 m

· Specification : 3.900m × 1.564m × 1 nos.

· Velocity (V) = Q ÷ A

= 3.472 ÷ 6.100 = 0.569 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.025 m (fio = 1.5)

2) Friction Loss(hf) = (n × V / R2/3)2 × L = 0.000 m

(n= 0.015) (R=B×H/(B+2H)= 0.868)

∴∑Δh= 0.025 + 0.000 = 0.025 m

∴ Water level

= 11.764m + 0.025m = 11.789 m

- 16 -
C1 - 16
Type Hydraulic Calculation

Q= 300,000 ㎥/d/nos = 3.472 ㎥/sec

Parshall Flume · q (ℓ/sec) 3,472 ℓ/sec

· No. of basins : 1 nos.

· Width(W ) : 250 ㎝
0.026 1.39×w^0.026
· q = (3.711/(115.66×W ))×W×Ha

· q = 5.591×Ha1.595

· Water Depth(Ha=(0.340×q1/1.595)/100) = 0.481 m

● Head Loss

∴∑Δh= 0.481 = 0.481 m

∴ Water level

11.789m + 0.481m = 12.270 m

Q= 300,000 ㎥/d/nos = 3.472 ㎥/sec

Inflow part of Parshall Flume · Specification : W 3.90m × H 2.10m × 1 nos.

· Length(L) : 84.90 m

· INV. EL : : 10.200 m

· Water Depth(H) : 12.270m - 10.200m = 2.070 m

· Area(A) = 3.900m × 2.070m = 8.072 ㎡

· Velocity(V) = Q ÷ A = 0.430 m/sec

● Head Loss

1) Friction Loss(hf)

hf = (n × V / R2/3)2 × L = 0.004 m

(n= 0.015) (R=B×H/(B+2H)= 1.004)

∴∑Δh= 0.004 = 0.004 m

∴ Water level

12.270m + 0.004m = 12.274 m

- 17 -
C1 - 17
Type Hydraulic Calculation

○ Main Pump Station


Q= 250,000 ㎥/d = 2.894 ㎥/sec

Distribution Channel · Gate Specification : W 2.00m × H 2.50m × 1 pcs.

~ Wet Well · Gate Bottom Elevation : (+) -10.800 m

· Water Depth(H) : -8.200m - -10.800m = 2.600 m

2.500m < 2.600m = 2.500 m

· Surface Area(A) : 2.000m × 2.500m = 5.000 ㎡

· Velocity (V) Q ÷ A = 0.579 m/sec

● Head Loss
2
1) Entrance and Exit Loss(hio) = fio×V /2g = 0.026 m (fio = 1.5)

2) Orifice Head Loss = (V/2.75)2= 0.044 m

∴∑Δh= 0.026 + 0.044 = 0.070 m

∴ Water level

= -8.200m + 0.070m = -8.130 m

Q= 250,000 ㎥/d = 2.894 ㎥/sec

Screen Channel · Specification : W 2.00m × H 5.20m × 2 nos.

· Length(L) : 13.00 m

· INV. EL : (+) -10.600 m

· Water Depth(H) : -8.130m - -10.600m = 2.470 m

· Surface Area(A) = 4.000m × 2.470m = 9.880 ㎡

· Velocity (V) = Q ÷ A = 0.146 m/sec

● Head Loss

1) Friction Loss(hf)

hf = (n × V / R2/3)2 × L = 0.000 m

(n= 0.015) (R=B×H/(B+2H)= 1.105)

∴∑Δh= 0.000 = 0.000 m

∴ Water level

-8.130m + 0.000m = -8.130 m

- 18 -
C1 - 18
Type Hydraulic Calculation

Q= 250,000 ㎥/d = 2.894 ㎥/sec

Screen · Width(B) = 2.0 m

· INV. EL : = -10.600 m

· Water Depth(H) : = -8.130 - -10.600 = 2.470 m

- No. of basins = 2 nos.

- Clear spacing between bars(b) = 6.0 ㎜

- Thickness of bars(t) = 2.0 ㎜

- Angle of bar inclination(θ) = 75.0 ˚

sin(75˚) = 0.966

- Screen loss coefficient(β) = 2.34

- Velocity(V) = 1.447 ÷ 4.940 = 0.293 ㎥/sec

● Head Loss
4/3 2
1) Head loss(hs) = β×sinΘ×(t/b) ×(V /2g) = 0.002 m

∴∑Δh= 0.002 = 0.002 m

∴ Inlet Water Level

-8.130m + 0.002m = -8.128 m

Q= 500,000 ㎥/d = 5.787 ㎥/sec

Inlet Chamber · Gate Specification : W 2.00m × H 2.50m × 2 pcs.

· Gate Bottom Elevation : (+) -10.600 m

· Water Depth(H) : -8.128m - -10.60m = 2.472 m

2.50m > 2.47m = 2.472 m

· Surface Area(A) : 4.00m × 2.47m = 9.888 ㎡

· Velocity(V) : Q ÷ A = 0.585 m/sec

● Head Loss

1) Entrance and Exit Loss(hio) = fio×V2 /2g = 0.026 m (fio = 1.5)

2) Orifice Head Loss = (V/2.75)2= 0.045 m

∴∑Δh= 0.026 + 0.045 = 0.071 m

∴ Water level

= -8.128m + 0.071m = -8.057 m

- 19 -