Monitoring Sheet For Commissioning
Monitoring Sheet For Commissioning
Status of contracts Name of Cost of Progress Issues if any/ scope not covered by
Engineering: agency work/Award Phy %/ Fin tenders if any
a) Earthwork/ formation/ minor bridges
S&T:
a) Outdoor works
Electrical
a) Augmentation
Other sanctioned
enabling tenders if anyload? Auto changeover/
(tree cutting/ AT supply.
Elect crossings etc)
MATERIAL SUPPLY STATUS
S.No. Description Total Quantity Done TDC/ Target Remarks
3 Opening Document(Electrical)
4 Machine Packing 1st Round
4.1 Machine Packing 2nd Round
4.2 Machine Packing 3rd Round
5 Handing over Points and Crossings to S&T
6 EIG submitted to Division
6.1 EIG IN HQs
6.2 EIG received
7 S&T Outdoor
8 S&T Indoor
9 JAG Inspection-Engineering
9.1 S&T
9.2 Electrical
10 SAG Inspection-Engineering
10.1 S&T
10.2 Electrical
11 Submission of Pre-NI/ NI Programme to Division
11.2 Submission of Pre-NI Programme to HQs/ NI
11.3 Approval of Pre NI/ NI program
MID SECTION
Total Quantity
S.No. Description Done Target Remarks
and length
1 Land
Utility Shifting / Infringements/ tree cutting/ power line
2
shifting
3 Earthwork in filling
4 Cutting
5 Blanketing
5(a) Minor Bridges nos
8 Ballast Collection
Special layouts:
20.1
Feeder wire/ drop/ Neutral section/ IOL
33 Bridge Certificate
YARDS
23 FOB/PF Shelter/
25 Bonding - S&T
26 Bonding - OHE
27 Fire Alarm
28 EMI Shielding/Lighting Protection
29 S&T = Painting = I/D, O/D
Geotech lab
Appendix for GSA,
D and CBR,
G - test LL, PL, OMC, FDD
record.
Certiicate for
Checklist for certificate
quality of earthwork by CE Constt
of earthwork
Strip chart
Slope stability analysis if required. Motor grader, Vibro roller, Sprinkler trucks, are
Machinery
Number of scale required and actually done. Sample
tests required mentioned and availability ensure or not?
checks?
transitions and actually plotted? Landd bounary
ESPs actual? as per revenue recor?