0% found this document useful (0 votes)
11 views

Accounting

This document is an AC monitoring checklist for the month of January 2023. It lists the location, specifications, and status of 12 AC units in the Accounting office and 7 AC units in the IT Factory. The checklist tracks information like brand, model number, power usage, filter cleaning status, pressure measurements, and remarks. The technicians, senior technician, and section head are required to sign off at the bottom to confirm the inspection was completed.

Uploaded by

warehousega 846
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Accounting

This document is an AC monitoring checklist for the month of January 2023. It lists the location, specifications, and status of 12 AC units in the Accounting office and 7 AC units in the IT Factory. The checklist tracks information like brand, model number, power usage, filter cleaning status, pressure measurements, and remarks. The technicians, senior technician, and section head are required to sign off at the bottom to confirm the inspection was completed.

Uploaded by

warehousega 846
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

General Affair Department / Maintenance

AC Monitoring Ckecklist
Inspection : Monthly Year : 2023 Month Januari
Equipment : Ac Split & AC In- outdoor Location : Accounting Tanggal 28 Januari 2023

Engine Status AMPERE FILTER MEASUREMENT ASET


No. Location PK Merk No. Asset REMARKS
ON/stanby OFF R S T CLEAN DIRTY PREASSURE GGP SSA SKL TOP Other

1 R. Meting 2.5 Changhong 2400000037460


2 Kabag UJA 2 Panasonik
3 R. Ast Man Accounting Hitachi
4 R. Manager Panasonik 2400000070630
5 R. Manager Hitachi
6 R. Manager Panasonik 2400000037580
7 R. Admint Panasonik 2950000049110 Rusak
8 R. Manager Changhong 2400000000210 Rusak
9 R. Meting B 1 Panasonik
10 R. Manager Boy 1 Panasonik
11 Kantor Belakang 2 Panasonik 2400000074030
12 Kantor Container 2 Panasonik

1 IT Factory 2 Panasonik 2400000070690


2 R, Admint 1 Sharp
3 R. Kabag 1 Panasonik
4
5 R. Pak Bayu 1 Panasonik
6
7

TOTAL

Teknisi Nama : Ttd :

Senior Teknisi Nama : Ttd :

Section Head Nama : Ttd :


General Affair Department / Maintenance

AC Monitoring Ckecklist
Inspection : Monthly Year : 2023 Month Februari
Equipment : Ac Split & AC In- outdoor Location : Accounting Tanggal 25 Februari 2023

Engine Status AMPERE FILTER MEASUREMENT ASET


No. Location PK Merk No. Asset REMARKS
ON/stanby OFF R S T CLEAN DIRTY PREASSURE GGP SSA SKL TOP Other

1 R. Meting 2.5 Changhong 2400000037460 V


2 Kabag UJA 2 Panasonik V
3 R. Ast Man Accounting Hitachi V
4 R. Manager Panasonik 2400000070630 V
5 R. Manager Hitachi V
6 R. Manager Panasonik 2400000037580 V
7 R. Admint Panasonik 2950000049110 V Rusak
8 R. Manager Changhong 2400000000210 V Rusak
9 R. Meting B 1 Panasonik V
10 R. Manager Boy 1 Panasonik V
11 Kantor Belakang 2 Panasonik 2400000074030 V
12 Kantor Container 2 Panasonik V

1 IT Factory 2 Panasonik 2400000070690 V V


2 R, Admint 1 Sharp V
3 R. Kabag 1 Panasonik
4
5 R. Pak Bayu 1 Panasonik V
6
7

TOTAL

Teknisi Nama : Ttd :

Senior Teknisi Nama : Ttd :

Section Head Nama : Ttd :

You might also like