Design Sheet
Design Sheet
Cc : [email protected]
Comments : MAKES OF ALL EQUIPMENTS / ITEMS SHOULD BE AS PER NTPC CQA APPROVED
7010-364-002-TVC-C-054/04/CAT-I/Page: 1 of 32
Client : NTPC
1. Add Diffuser Quantity Ass Diffuser qty calculations for aeration tank equalization tank, SHT& TUBE SETTLER. Diffuser Quantity Calculation add in PDC
-
2. Add Anoxic Tank Also add anoxic tank & rection tank as equipment’s & provide their sizing calculations. We added Anoxic Tank -
3. Coarse Screen Chamber .3-.6 AS PER METCALF & EDDY TABLE 5.2 PG NO 316 Changes Are Done -
4. Coarse Screen Chamber WIDTH OF BAR: 25 mm Changes Are Done
multiplication factor: 1+25/20= 2.25 hence area of coarse bar screen: .021*2.25 accordingly -
select the area of coarse bar and of screen chamber
5. Stilling Chamber 1 20-25 minutes Not Required 20-25 mint. If Hydraulic retention time is more for stilling chamber-1 then impurities will settle
down and create problem. Retention time of 60 sec is provide for Uniform flow which
Comment reiterated is goes further to Fine Screen. And it is preeceding by Raw sewage sump which is
also used as holding tank, So 60 sec retention time is sufficient for Stilling Chamber
1.
6. 0.3-0.6 m/s Checked and Mentioned. Fine Screen is adjacent with Grit Chamber, So the volume
Fine Screen Chamber width of bar 10 mm & gap between two bars of screen -5 mm. Design accordingly (calculate as Changes Are Done PLS CHK SIZE TO CATER TO CALCULATED VOLUME provided for Fine screen chamber is suffiecient and so the dimensions for better
commented in coarse screen working of plant.
7. Grit Chamber 0.3 m as per NTPC TECH SPECS, PART-B SEC-8 SUB SEC-C CL 4.02.01 Changes Are Done -
8. Oil & Grease Chamber: CONSIDER PEAK FLOW Changes Are Done -
IS THIS FOR EACH TANK Yes, Two MBBR Tanks is used each tank have volume of 60 Cum.
10. Air Requirement basis of formula? attach document Done AIR BLOWER QUANTITY SHOULDN'T BE LESS THAN LAST REV. i.e.320
Done
Cu.M
11. Tube Settler Tank basis? attach ref? Done attach reference Reference attached
12. Sludge Holding Tank Attach ref. Done -
13. DESIGN DETAILS OF PUMPS Please add pump head selection calculations & dosing quantity calculations Done -
14. Dosing Quantity
The dosing quantity is selected as per inlet parameters of raw sewage. It may be
- - What is the basis of dosing quantity of all type of dosings?
increase and decrease as per the site conditions and inlet parameters..
14. Inlet Level Mark inlet level Done DOES THE INV. LVL. OF LAST MANHOLE LIES ABOVE NGL?PLEASE As per the drawing NGL is 410.307, IL is 410.933 and Road Level is 413.400. IL is
REVIEW. above the NGL But it is below the Road level.
15. Add ANOXIC TANK Add ANOXIC TANK Done -
16. Add Chlorine Tank CHLORINE CONTACT TANK Done -
17. Add Table Pease add a table mentioning top level of fluid (SWL) in all the tanks & MENTION FLOW BY Done
-
GRAVITY OR PUMPING.
18. Mark SWL Also mark the fluid level on all the tanks. Done -
REF- 7010-364-002-TVC-C-054-06
Date- 13/03/2023
STP CONTRACTOR:
CONTENT
S. No. PARTICULARS
1.0 INTRODUCTION
1.0 INTRODUCTION
Treatment process shall be MBBR (Moving Bed Bio-Reactor). Inlet & Outlet parameters
shall be considered for designing the Sewage Treatment Plant as under: -
INLET OUTLET
S. No. PARAMETER
(Raw Sewage) (After Treatment)
1. Quantity of wastewater, 250 m3/day 250 m3/day
2. pH 6.5-8 7-8
3. TSS, mg/l 300 <15
4. Oil & Grease, mg/l 20-30 <10
5. COD, mg/l 450 <50
6. BOD, mg/l 250 <10
7. Coliform Count (Counts/ml) 1000/100 100/100
8. Residual Chlorine (ppm) -- 0.5
1
7010-364-002-TVC-C-054/04/CAT-I/Page: 5 of 32
2
7010-364-002-TVC-C-054/04/CAT-I/Page: 6 of 32
DESCRIPTION VALUES
Design Flow (Qp) 45 m3/hr (Peak Flow)
Flow velocity (v) 0.5 m/s (As per Metcalf & Eddy Table No.- 5.2
Page No.- 316)
Clear Area of Bar Screen(A) A= Qp/v = 0.025 m2
Multiplication Factor = 1 + (width of bar /gap b/w bars)
= 1 + (25/20)= 2.25
Adjust for the flow-area blocked by the = Area x Multiplication factor
bars = 0.025 x 2.25= 0.0567 m2
Selected Dimension (Considering Garbage 1.2m(L) x 0.6m (B) x 0.8m(SWD)+ 0.3m(FB)
Accumulation) {as per STP-TS clause no. 4.01.01, Upto 0.5 m
above the FGL & IL -0.6}
Screen 20 mm spacing coarse screen, Manual type
Width of Bar in mm 25 mm, Mild steel bar
Location Starting of STP
DESCRIPTION VALUES
Design Flow (Qp) 45 m3/hr (Peak Flow)
Hydraulic Retention Time (HRT) 1 Hr
Tank Volume (V) V= Qp x HRT= 45 m3 (in Two Parts)
Number of Sump 2
Dimension 2 x [4m (L) x 2m (B) x 2.8m (SWD) + 0.3m(FB)
{as per STP-TS clause no. 4.01.01, Upto 0.5 m
above the FGL & IL -0.6.}
Location After coarse Screen Chamber
DESCRIPTION VALUES
Design Flow (Qp) 45 m3/hr (Peak Flow)
Hydraulic Retention Time (HRT) 60 sec
Tank Volume (V) V= Qp x HRT= 0.75 m3
Dimension 1.5m (L) x 0.5m (B) x 1m (SWH)+0.3m(FB)
Location After Raw Sewage Sump
3
7010-364-002-TVC-C-054/04/CAT-I/Page: 7 of 32
DESCRIPTION VALUES
Design Flow (Qp) 45 m3/hr (Peak Flow)
Flow velocity (v) 0.4 m/s (As per Metcalf & Eddy Table No.- 5.2
Page No.- 316)
Clear Area of Bar Screen (A) A= Qp/v = 0.031 m2
Multiplication Factor = 1 + (width of bar /gap b/w bars)
= 1 + (10/5)= 3
Adjust for the flow-area blocked by the = Area x Multiplication factor
bars = 0.031 x 3= 0.093 m2
Calculated Dimensions of cross section = 300 mm x 300 mm
Selected Dimension (Considering Garbage = Volume= 0.3521 m3
Accumulation) = 0.5 m (L) x 0.7 m (B) x 0.6m (SWD) +
0.35m (FB)
Screen 5 mm spacing fine screen, Manual type
Width of Bar in mm 10 mm, Mild steel bar
Location After Stilling Chamber 1
DESCRIPTION VALUES
Design Flow (Qp) 45 m3/hr (Peak Flow)
SOR 959 m3/ m2/day
(As per CPHEEO Manual Appendix A 5.7)
Plan Area A= Qp/SOR = 45x20/959 = 0.94 m2
Area taken 1 m2
Detention Period 60 sec.
(As per CPHEEO Manual 5.6.2.7.1.3)
Water depth taken 0.25m
free board 0.3m
(as per STP-TS clause no. 4.02.01)
grit storage space 0.25m
Total depth of grit chamber 0.8m (SWD) + 0.3m (FB) = 1.1 m
Chamber Volume 2 x 0.8 m3 (considering extra chamber in
standby)
Dimension {1.5m(L) x 0.7m(b) x 0.8m(SWD)+0.4(fb)}x2
Location After Fine Screen Chamber
4
7010-364-002-TVC-C-054/04/CAT-I/Page: 8 of 32
DESCRIPTION VALUES
Design Flow (Q) 45 m3/hr
HRT 20 min
Tank Volume (V) V= Q x HRT = 15 m3
Dimension 3.75 m (L)x 2m(B) x2m(SWD)+0.45m(FB)
Location After Grit Chamber
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 5-6 Hrs
Tank Volume V= Q x HRT = 85 m3
as per STP-TS clause no. 4.03.01
Dimension 5.2 (D) x 4 m(SWD) +0.5m (FB)
Location After Oil & Grease Chamber
DESCRIPTION VALUES
Diffuser Coarse Bubble Diffuser
Type of diffuser Ceramic Disc type
Air flow per diffuser 0.6-6 m3/hr (As per Metcalf & Eddy Table No.-
5.27 Page No.- 437)
Size in mm 80 mm
No. of diffusers = Total air requirement for Equalization and
Sludge Holding Tank/Air flow per diffuser
= 100/4 = 25 No.
Location In Equalization Tank and Sludge Holding Tank
DESCRIPTION VALUES
Average Flow/Pump Flow 15 m3/hr
Hydraulic Retention Time (HRT) 30 sec
Tank Volume (V) V= Qp x HRT= 0.4 m3
Dimension 0.8m(L) x 0.5m(B) x 0.9m(SWD)+0.3m(FB)
Location After Equalization Tank
5
7010-364-002-TVC-C-054/04/CAT-I/Page: 9 of 32
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 1.5-2 Hrs (As per CPHEEO Manual 5.18.13.5.c)
Tank Volume V= Q x HRT = 30 m3
Dimension 3.15m (D) x 3.8 m(SWD) +0.4m (FB)
Location After Stilling Chamber 2
DESCRIPTION VALUES
Flow (Q) 15 m3/hr
BOD Load per Day BOD (mg/l) x Q/1000
= 250x250/1000 = 62.5 kg/Day
OLR 1.2 kg BOD/m3/Day (As per CPHEEO Manual
5.18.13.5.c)
Volume Load/OLR = 62.5/1.2 = 52 m3
HRT for decomposition = Volume of tank (m3)/Flow(m3/hr)
= 52/15 = 3.5 hr (Take 4 hr retention) (As per
CPHEEO Manual 5.18.13.5.c)
Tank Volume (V) (For Each Tank) V= Q x HRT = 15x4 = 60 m3
Number of tanks 2
Dimensions (MBBR Each Tank) 4.5(D) x 3.7 m(SWD)+0.5m (FB)
Location After Anoxic Tank
l) Air Requirement:
DESCRIPTION VALUES
Oxygen requirement 1.0-1.2 kg O2/kg BOD (As per CPHEEO Manual
Part B, Table B4.2-2)
Standardized amount of O2 required = 62.5x1.2/20= 3.75 kg/h ~ 4 kg/h
Density of air 1.206 kg/m3
Std. O2 transfer efficiency (S.O.T.E.), % 7.5 % (air diffuser)
membrane type diffuser (6-8%)
% Oxygen in air by weight 23%
Air Required in m3/hr under field = O2 required per h/density of air
condition = 4/1.2 = 3.334 m3/h
Air Required according to efficiency of = Air Required in m3/hr under field
diffusers condition/Transfer efficiency
= 3.334 /0.075 m3/h = 44.4445 m3/h
6
7010-364-002-TVC-C-054/04/CAT-I/Page: 10 of 32
DESCRIPTION VALUES
Diffuser Fine Bubble Diffuser
Type of diffuser Tubular type (Non porous plastic tube)
Air flow per diffuser 1.8-12 m3/hr (As per Metcalf & Eddy Table
No.- 5.27 Page No.- 437)
Size in mm 90 OD x 1000 L
No. of diffusers = Total air requirement for MBBR/Air flow
per diffuser
= 200/10 = 20 No. (Taken No. of diffusers= 22
for safety consideration)
Location In MBBR Tank with diffusion grid
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 20 min (as per STP-TS clause no. 5.01.00)
Tank Volume V= Q x HRT = 5 m3
Dimension 1.8 (D) x 2.0 m (SWD)+0.3m (FB)
Location After MBBR Tank
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 3-4 Hrs
Tank Volume V= Q x HRT = 45 m3
Surface loading rate (SOR) 20 m3/ m2/day (As per CPHEEO Manual
Chapter-5, Table- 5.8)
Area (A) A= Q/SOR= 15x20/20= 15 m2
Dimension 5m(L) x 3m(B) x 2.7m(SWD)+0.4m (FB)+
0.8m(Hopper)
7
7010-364-002-TVC-C-054/04/CAT-I/Page: 11 of 32
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 1 Hr (as per STP-TS clause no 6.00.00 Sr. No. 1)
Tank Volume V= Q x HRT = 15 m3
Dimension 1.65m(L) x 3m(B) x 3.1m(SWD)+0.5m (FB)
Location After Tube Settler Tank
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
Daily dry sludge generation = (Inlet BOD x Flow) x percentage of removal
x percentage of removed contaminant
(BOD removal percentage according to converted into sludge convert into sludge /
outlet is 96%) 1000
100 % of removed contaminants are = (250 x 250) x 0.96 x 1/1000
= 60 kg-DS/day
converted to sludge
(As per CPHEEO Appendix Page no. A-185)
Wet sludge concentration Biological Sludge of 1-2 % Solids Consistency
Taken Wet sludge concentration 2 % Solids Consistency
Sludge volume per day 56 [kg-DS/day]/(2/100)/1,000 = 2.8 m3/day
Wet sludge retention 5 Days
Tank Volume 2.8 (m3/day) x 5 day = 14 m3
Dimension 2.35m (L) x 2 m (B) x 3m (SWD) +0.3m (FB)
Location After Tube Settler Tank
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
HRT 8 Hr
Tank Volume V= Q x HRT = 125 m3
as per STP-TS clause no. 6.00.00 Sr. No. 6
Dimension 7m (L) x 4.5m (B) x 4m (SWD) +0.5m (FB)
Location After DMF & ACF
8
7010-364-002-TVC-C-054/04/CAT-I/Page: 12 of 32
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
Filtration velocity (V) 15 m/hr
as per STP-TS clause no. 6.00.00 Sr. No. 4
Area A= Q/V= 1 m2
Diameter of filter 1150 mm
H/D ratio 1.0 : 1.2
Proposed SOH of filter 1400 mm
Media Bed Height 840 mm
Media Size Layer 1 - size of pebble 20-40 mm: 100 mm depth
layer 2 - size of gravel 8-12 mm: 50 mm depth
layer 3 - size of gravel 4.5- 8 mm: 35 mm depth
layer 4- size of gravel 4.5-2.5 mm : 25 mm depth
layer 5- size of silica sand 0.68 - 7.0 mm : 150 mm
depth
layer 6- anthracite: 480 mm depth
Pressure 3.5 kg/sqcm (Design pressure)
5.2 kg/sqcm (Max. Pressure)
Location After Filter feed tank
DESCRIPTION VALUES
Design Flow (Q) 15 m3/hr
Filtration velocity (V) 12 m/hr
as per STP-TS clause no. 6.00.00 Sr. No. 4
Area A= Q/V= 1.25 m2
Diameter of filter 1250 mm
H/D ratio 1.0 : 1.2
as per STP-TS clause no. 6.00.00 Sr. No. 4
SOH of filter 1500 mm
Media Bed Height 900 mm
Media Size Layer 1 - size of pebble 20-40 mm: 100 mm depth
layer 2 - size of gravel 8-12 mm: 60 mm depth
layer 3 - size of gravel 4.5- 8 mm: 40 mm depth
layer 4- size of gravel 4.5-2.5 mm : 30 mm depth
layer 5- size of silica sand 0.68 - 7.0 mm : 170 mm
depth
layer 6- activated carbon: 500 mm depth
Pressure 3.5 kg/sqcm (Design pressure)
5.2 kg/sqcm (Max. Pressure)
Location After DMF
9
7010-364-002-TVC-C-054/04/CAT-I/Page: 13 of 32
DESCRIPTION VALUES
Raw Sewage Sump Pump (1w+1s) 24 m3/hr@ 10 m head
Sewage Transfer Pump (1w+1s) 15 m3/hr@ 10 m head
Air Blower (1w+1s) 320 m3/hr@ 0.5 kg/sqcm
Filter Feed Pump (1w+1s) 15 m3/hr@ 35 m head
Sludge Transfer Pump (1w+1s) 7 m3/hr@ 15 m head
Treated Water Transfer Pump (1w+1s) 15 m3/hr@ 30 m head*
Centrifuge Feed Pump (1w+1s) 2 m3/hr@ 25 m head
Agitator for Mixing in Anoxic Tank Agitator for mixing of 5 HP in Anoxic Tank
Hypochlorite dosing Pump (1w+1s) 0-6 LPH@ 3 kg/sqcm
PE dosing Pump (1w+1s) 0-20 LPH@ 3 kg/sqcm
PAC dosing Pump (1w+1s) 0-20 LPH@ 3 kg/sqcm
DWPE dosing Pump (1w+1s) 0-10 LPH@ 3 kg/sqcm
Note: Data sheets having detailed specifications shall be submitted before material
dispatch for approval.
Note: Head loss taken is the highest value of head loss by Darcy Weisbach and Hazen
Williams formula.
Head loss due to valve and fittings = 0.2 m
= Formula used = k x v2/2g
Total Head = 5.31 + 2.76 + 0.2 = 8.27 m
Pump Head with 20% factor of safety = 8.27 + (8.27x20%) = 9.924 m ~ 10 m
10
7010-364-002-TVC-C-054/04/CAT-I/Page: 14 of 32
11
7010-364-002-TVC-C-054/04/CAT-I/Page: 15 of 32
12
7010-364-002-TVC-C-054/04/CAT-I/Page: 16 of 32
13
7010-364-002-TVC-C-054/04/CAT-I/Page: 17 of 32
Date- 13/03/2023
STP CONTRACTOR:
REFERENCE LIST: -
1
7010-364-002-TVC-C-054/04/CAT-I/Page: 19 of 32
- As per NTPC Technical Specification, Reference taken- (STP-TS clause no. 4.01.01, Upto 0.5
m above the FGL & IL -0.6). Reference is attached below.
2
7010-364-002-TVC-C-054/04/CAT-I/Page: 20 of 32
3
7010-364-002-TVC-C-054/04/CAT-I/Page: 21 of 32
4
7010-364-002-TVC-C-054/04/CAT-I/Page: 22 of 32
5
7010-364-002-TVC-C-054/04/CAT-I/Page: 23 of 32
- As per CPHEEO Manual Chapter-5, Point- 5.6.2.7.1.3, Detention time for grit chamber not
exceed 60 sec. Reference is attached below.
6
7010-364-002-TVC-C-054/04/CAT-I/Page: 24 of 32
7
7010-364-002-TVC-C-054/04/CAT-I/Page: 25 of 32
8
7010-364-002-TVC-C-054/04/CAT-I/Page: 26 of 32
- As per CPHEEO Manual 5.18.13.5 (Kaldnes Process), Calculating the settling velocity by
using stokes law, then used formula of efficiency to calculate SOR. Reference is attached
below.
9
7010-364-002-TVC-C-054/04/CAT-I/Page: 27 of 32
- As per CPHEEO Manual Part B Table- B4.2-2, O2 required for removal of per kg is 1-1.2 kg
O2 / kg BOD. We choose highest value 1.2 for calculation of air requirement. Reference is
attached.
10
7010-364-002-TVC-C-054/04/CAT-I/Page: 28 of 32
10. Air Flow per diffusers for Tubular type (Non porous plastic tube): -
- As per Metcalf & Eddy Table No.- 5.27 Page No.- 437 – Air Flow per diffuser range is 1.8-12
m3/hr. Reference is attached below. So we take it 4 m3/hr for design calculation.
11
7010-364-002-TVC-C-054/04/CAT-I/Page: 29 of 32
- As per CPHEEO Manual Chapter-5, Table- 5.8, SOR for Tube settler taken as 15 -35
m3/m2/day. It is taken as 20 m3/m2/day for design calculation. Reference is attached below.
12
7010-364-002-TVC-C-054/04/CAT-I/Page: 30 of 32
- As per CPHEEO Appendix Page no A-185, Sludge generation can be calculated by using
formula given below: -
13
7010-364-002-TVC-C-054/04/CAT-I/Page: 31 of 32
- As per NTPC Technical Specification, Reference taken- (STP-TS clause no. 6.00.00 Sr. No. 4).
Reference is attached below.
14
7010-364-002-TVC-C-054/04/CAT-I/Page: 32 of 32
- As per NTPC Technical Specification, Reference taken- (STP-TS clause no. 6.00.00 Sr. No. 4).
Reference is attached below.
15