P&Ids: Diagr

The document outlines the project timeline and milestones for a piping project. It includes stages for developing piping designs, issuing purchase orders for materials and equipment, creating engineering drawings and documentation, and fabricating and installing the piping. The critical path shows work being completed in a logical sequence over an 18 month period to deliver the project.

Uploaded by

Mohammad Asad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views1 page

P&Ids: Diagr

The document outlines the project timeline and milestones for a piping project. It includes stages for developing piping designs, issuing purchase orders for materials and equipment, creating engineering drawings and documentation, and fabricating and installing the piping. The critical path shows work being completed in a logical sequence over an 18 month period to deliver the project.

Uploaded by

Mohammad Asad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Month: 6 I 12 !

18 I
Piping materials supply 70% piping
PSIDFD
IFR in-line In-line instr.
materials
e&IDsreviewPIDs instr. POs Vendor dwgs PLast
delivered
Prping Package IFC start
klasses Piping |Eqt Vendor
1" IFC
vendor PIDs Piping
Line >MIO IED Piping
SMTO dwgs P&IDS dwgs |fab.
Fluids Diagr. (General UG uEP)
list networks Pipe supports MTO
S0% up
Fire Piping isosdates
PR st
Plot rotection
Plan >Main cable
PO calcs dwgs Piping MTO
Piping studies IEC up-dates
PFDS Piping
HMB HIFR
routing PR
Isometrics
Piot Plan stress analysis found
Review IFC !
30% 60% 90%
Szed|T system model 3D MODELA model model
|Eqt set-up review,
list review review,

HX sizing Piping
Eqt Eqt Guide
IFD Piot IFC Plot Process |UG piping
& cable GADS
sizing drawings
Plan Plan str IFC trench IFC
Eqt Equipment GADs Final Equipment,
PDS Eqt
Equipment POs found packages and in-line
LEqt spec Eqt setting UFC instrument vendor
S-MSD MDS MR plan & loads dwgs
Eqt T8TS The il &Cin EgineKriny Guide, Editions Technip