RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER &
WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Use a safe means of access and egress Ensure that any ladders are tied and footed Ensure the correct usage of step ladders Ensure that operatives are aware of the hazards of working at height through TBT Ensure that mobile platforms are not to be moved unless clear of operatives Ensure that scaffoldings and platforms are provided with toe board. Ensure that the working platform and surroundings are adequately barricaded and that access and egress to the building are provided with suitable overhead sheeting. Ensure that mobile platforms are not to be moved unless cleared of equipment, tools and materials.
Residual
High High
Monitoring Mechanism
01
Work at Heights
People falling from height
Serious injury, death
General foreman / Safety Officer
Falling equipment, tools, materials and rubbish
Serious Injury or death
General foreman / Safety Officer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Scaffolds must only be erected, dismantled or altered by competent persons. Scaffolds must not be overloaded. Adequate controls and supervision must be established. Appropriate PPE must be worn. All equipment, tools and materials to be correctly hoisted and lowered. ( No throwing ) No go area to be designated at the base by barricading during erection or dismantling. Materials on scaffolds must not be stacked higher than the toe board unless brick guards or similar materials are in place. The minimum width of a working platform is 600mm and must be kept clear for access along the scaffold. All scaffolds and working platforms must be fully boarded, guarded irrespective of height and inspected by a competent person prior to use and on daily basis. Safety harnesses must be worn where necessary. Guardrails and toe-boards are required to all working platforms irrespective of height and must not be removed by unqualified personnel.
02
All Scaffolding
Collapse through overloading
Injury to head and upper body, serious Injury, death
People falling from height
Serious Injury or Death
Prepared By(HSE Dept) : Reviewed By(Project Manager):
Residual
Monitoring Mechanism
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Ensure the concrete pump is properly maintained and sufficient number of operatives to handle the hose. Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement. Ensure a competent supervisor is present at all times. Ensure proper scaffolding or platform is being used. Ensure that operatives are aware of the hazards of working at height through TBT Inspect the shuttering to ensure strength and safety prior to pouring. The inspection shall be done by the Engineer. Ensure that competent supervision at all times
02
Concreting
Concrete pump hose whipping and contact with cement
Residual
High High High
Monitoring Mechanism
Injury, Blindness, Chemical burns and Dermatitis
General Foreman / Safety Officer
Fall from height
Injuries/ Death
General Foreman/ Safety Officer
Collapse of shuttering
Injury/ Death through spillage of concrete and falling materials to workers
General Foreman /Project Engineer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement and chemical Ensure a competent supervisor is present at all times. Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE (full body harness) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times.
Residual
High High
Monitoring Mechanism
02
Plastering
Contact with Cement and Chemical
Blindness, Chemical burns and Dermatitis
General Foreman / Safety Officer
Fall from height
Injuries/ Death
General Foreman / Safety Officer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement and chemical Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE ( full body harness ) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times. Ensure to use appropriate PPE ( Mask and eye protection ). Ensure to use the correct and in good repair power tools. Ensure that guards are in place. Ensure that power cords are not damage and plugs are in place
02
Marble/Tiling Work
Contact with cement based adhesive and Chemical
Residual
High High High
Monitoring Mechanism
General Foreman / Safety Officer
Blindness, Chemical burns and Dermatitis
Fall from height
Serious injury or death
General Foreman / Safety Officer
Cutting of Marble / Tile with power tools
Respiratory Infection, Injury and Electrocution
General Foreman / Safety Officer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Ensure that third party inspection certificate is valid. Ensure that daily check by operator is carried out. Ensure that weekly / monthly inspection and servicing is carried out Ensure to monitor the wind speed and not to use crane if wind speed exceed the maximum limit. Ensure that tag lines are use during lifting of bulky materials or equipment Ensure that only trained slingers and signalers are allowed to work with lifting operation Ensure that operators are having license, trained and certified by accredited third party safety consultant Only trained slingers and signalers are allowed to work on lifting operations. Ensure that sling capacity is not exceeded and not damaged
02
Lifting / Crane Operation
Crane collapse through disrepair / poor maintenance
Residual
High High High High
Monitoring Mechanism
Serious bodily injuries and death
Lifting Supervisor/ Safety Officer
Operating and using crane during high wind condition
Serious bodily injury, Damage to equipment and property
Lifting Supervisor/ Safety Officer
Incorrect use of crane or poor operating standards Falling of loads being lifted
Serious bodily injuries, crushing ,death and damage to equipment and property Severe injury, death and damage to property
Lifting Supervisor/ Safety Officer Lifting Supervisor/ Safety Officer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE ( full body harness ) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times. Ensure to use the correct and in good repair power tools. Ensure that guards are in place. Ensure that power cords are not damage and plugs are in place
Residual
High High
Monitoring Mechanism
02
False Ceiling
Fall of persons
Serious Injury or death
General Foreman / Safety Officer
Use of power tools
Injury and electrocution
General Foreman / Safety Officer
Prepared By(HSE Dept) : Reviewed By(Project Manager):
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
02
Prepared By(HSE Dept) : Reviewed By(Project Manager):
Residual
Monitoring Mechanism
RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity
S. No.
Activity
Hazard
Risk
Control Measures
02
Prepared By(HSE Dept) :
Residual
Monitoring Mechanism
Reviewed By(Project Manager):