Assignment-2 (Group) - v3
Assignment-2 (Group) - v3
Name xxxxxxxxx
Total
Final Grade
Table of Contents
1. Project Management Plan....................................................................................................................1
1.1 Updated Scope Management Plan:................................................................................................2
1.2 Updated Requirements Document.................................................................................................3
1.2.1 User Interface Requirement.....................................................................................................4
1.2.2 UI Interference working...........................................................................................................5
1.3 Create WBS......................................................................................................................................6
1.4 Schedule Management Plan............................................................................................................8
1.4.1 Tools and Techniques used to Create Schedule for Sunshine Motors:.................................8
1.4.2 Gantt Chart:..............................................................................................................................9
1.5 Project Cost Management.............................................................................................................11
1.5.1 Cost estimation & Budget:.....................................................................................................12
1.6 Risk Management Plan:............................................................................................................13
1.6.1 Risk Register:..........................................................................................................................14
1.7 Plan Stakeholder Engagement......................................................................................................15
2. References & Citations........................................................................................................................17
1. Project Management Plan
Following input from the project team and the primary stakeholders, the Project Manager designs
the project management strategy. A Project Management Plan is an official, authorized document
that specifies the implementation, tracking, and control of the project. It may be a summary or a
comprehensive text, including baselines, plans for subsidiary management, and other documents
for planning. This document is used to describe the project team's approach to the project's
intended project management scope.
As the work continues, the project performance is calculated against the baseline for
performance assessment in the project management plan. The baseline of scope, the baseline of
schedule, and the cost baseline are collectively referred to as the baseline of success
measurement. The project manager deals with them by making changes to address the variance if
there is a variance from the baseline when the work is being performed. If these corrections fail
to correct the deviations, formal requests for changes to the baselines are needed.
Project managers spend much time ensuring that baselines are met, ensuring that the sponsor of
the project and the company get the full benefits of their projects. In addition to careful
preparation, the expertise of a project manager often lies in managing the project effectively and
ensuring that project deliverables are on schedule and that the project is executed according to
the project management plan.
1
1.1 Updated Scope Management Plan:
“The Scope is the process where a project must be prepared and defined before
execution. This process will help with the decision about whether the project should
proceed or not (Fageha & Aibinu, 2013).”
During the planning phase of the project, there are many versions created of a Scope
management plan. Through configuration management, these documents are adequately
controlled until the approval of the final version. Hence, once approved then any change
in the scope management plan should only be incorporated with the approval of the
Integrated change control board (ICCB)
3
Instant forgot password
access associated with
registered mobile number
The account will be locked
after three unsuccessful
attempts
Service Proforma
Service proforma with all
the services required for
the vehicle
Previous service record of
the vehicle
Auto bill calculation but to
be shown only to the
invoicing counter
4
1.2.2 UI Interference working
The management system's entire design is divided into several categories, such as
the part to be handled by the mechanics, the part to be used by the managers, and
the part linked to the payment details. The mechanics entitled to a rostered day off
will enter their information of serving the customers at either of the terminals.
Mechanics can also access the system wherever they're free to allocate their next
day work order. -- work order includes standard work items for particular
services, and customers can also notice whether there is a fault within the
services. With various services, mechanics may need new parts to be used to
access the log details of the parts, and the system updates the system's inventory
database simultaneously.
The next part of the system includes specifications relating to the invoice.
Customers are provided with an invoice message regarding the payment to be
made when picking up any vehicles, and once the payment is made, the ticket will
be locked. Customers who have a system account can receive a monthly system
update. The payment system is designed to send a copy of the payment to the
customers in their account or via text messages if the customer has their mobile
numbers inside the system
5
1.3 Create WBS
6
1.4 Schedule Management Plan
“Establishing a project management schedule involves listing milestones, activities, and
deliverables with intended start and finish dates, of which the scheduling of employees
may be an element. A production process schedule is used for the planning of the
production or the operation, while a resource schedule aids in the logistical planning for
sharing resources among several entities. (Kianfar and Ranjbar 2011)”
The Schedule Management Plan is established during the planning process phase of the
project and is known as a component of the Project Management Plan ( PMP). The
Schedule Management Strategy describes how the project schedule is handled over the
entire lifecycle of the project. The plan provides guidelines and sets standards for
preparing, creating, managing, implementing, and monitoring project schedule policies
and procedures.
Sunshine Motors will use MS Project (Gantt Chart) to capture the schedule of the
complete project and will update the project on daily basis.
The Gantt or bar charts are useful and used to plan activities defined within a time period of projects that provide a visual
representation of the processes. In addition, they display activities with cascading arrows that are interdependent and can be used to
label project milestones and deliverables. The following figure depicts a bar chart for the project.
10
1.5 Project Cost Management
Every week, the Risk register will be checked and updated. If there is any change in the
Risk probability of occurrence or impact, it will be highlighted, as well as the top 5 risks
for the project will be communicated to higher management in the weekly management
report
No risk will be deleted from the risk register, only the risk status will be changed to
active or closed.
1.6.1 Risk Register:
Risk Register
Ris Potential Risk Description of Risk Steps to Mitigate Monitoring Likelihoo Impac Control Risk
k Potential Owner Frequency d t s Ratin
No Impact (1-5) (1-5) (1-3) g
1 Vendor not Project Failure CEO Thorough scrutiny of Bi weekly during 4 5 3 High
competent vendors Vendor selection
Checking portfolio of past After vendor
successful cases selection on each
Penalty clause in contract payment mile stone
in case of delay, over
budget
2 Delay in delivery Project delay Project Penalty clause in contract Bi weekly checking 5 5 2 High
Manager in case of delay and if the the current progress
delay hits the cost of the project with
schedule baseline
3 Manpower not Wasteful training Sales To guide the mechanics Daily during the training 3 4 3 Medium
ready to adapt to Manager and others about the phase of the management
autonmated benefits of the automated and staff
system system
4 Over budget Project cost may Finance 10% contingency reserves Biweekly 4 5 2 Medium
increase manager will be allocated to cater In case the risk
known-unknown risks potential to occir or
impact changes
1.7 Plan Stakeholder Engagement
A Stakeholder Engagement Plan is a systematic method for engaging with stakeholders to gain
their project support.
The frequency and type of communication are defined. It is developed at the start of the project
and periodically updated as the contact needs of stakeholders change.
Stakeholder Interest Impact on Strategy of Responsibility When Communication
in Project engagement Mode
Project
16
2. References & Citations
Gibson Jr, G., Wang, Y., Cho, C. & Pappas, M., 2006. What Is Preproject Planning,
Fageha, M. K. & Aibinu, A. A., 2013. Managing Project Scope Definition to Improve
and Controlling. 8th ed. New York: John Wiley & Sons.
Herroelen, W., Demeulemeester, E. and De Reyck, B., 1999. A Classification Scheme for