0% found this document useful (0 votes)
62 views5 pages

Pilgrim Expansion System Patent

This document contains information about a patent application filed by Sabnis Narendra Damodar and Rele Pratim Vasant of M/S Sarel Engineers in Mumbai, India. The application is for a pilgrim tube expander system. Key details include the application ID, inventors and applicants names and addresses, date of application, and that the field of invention is mechanical engineering. The system summary provided describes a tube expansion system that uses a pilgrim tube expander that provides uniform, parallel and smooth expansion over long tube lengths using low torque.

Uploaded by

rupesh71184
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views5 pages

Pilgrim Expansion System Patent

This document contains information about a patent application filed by Sabnis Narendra Damodar and Rele Pratim Vasant of M/S Sarel Engineers in Mumbai, India. The application is for a pilgrim tube expander system. Key details include the application ID, inventors and applicants names and addresses, date of application, and that the field of invention is mechanical engineering. The system summary provided describes a tube expansion system that uses a pilgrim tube expander that provides uniform, parallel and smooth expansion over long tube lengths using low torque.

Uploaded by

rupesh71184
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Patent Information

Application ID 251/MUM/2005
Sabnis Narendra Damodar M/S. Sarel Engineers 312/B, Hind-Saurashtra
Industrial Estate, Sir M.V. Road, Andheri (East), Mumbai-400 059

Rele Pratim Vasant 312/B, Hind Saurashtra Industrial Estate, Sir M.V.
Road, Andheri (East), Mumbai-400 059

M/S Sarel Engineers 312/B Hind-Saurashtra Estate Sir M V Road, Andheri


(E), Mumbai - 400 059,
Applicants
Sabnis Narendra Damodar M/S. Sarel Engineers 312/B, Hind-Saurashtra
Industrial Estate, Sir M.V. Road, Andheri (East), Mumbai-400 059

Rele Pratim Vasant 312/B, Hind Saurashtra Industrial Estate, Sir M.V.
Road, Andheri (East), Mumbai-400 059

M/S Sarel Engineers 312/B Hind-Saurashtra Estate Sir M V Road, Andheri


(E), Mumbai - 400 059,
Sabnis Narendra Damodar 312/B, Hind Saurashtra Industrial Estate, Sir
M.V. Road, Andheri (East), Mumbai-400 059

Rele Pratim Vasant 312/B, Hind Saurashtra Industrial Estate, Sir M.V.
Road, Andheri (East), Mumbai-400 059
Inventors
Sabnis Narendra Damodar 312/B, Hind Saurashtra Industrial Estate, Sir
M.V. Road, Andheri (East), Mumbai-400 059

Rele Pratim Vasant 312/B, Hind Saurashtra Industrial Estate, Sir M.V.
Road, Andheri (East), Mumbai-400 059
Invention Field Mechanical Engineering
Date of
2005-03-07
Application
Publication
10/2007
Number
Publication Type INA
Ipc Classification B21B15/00
International
Filing Date
Priority Date
Examination Date

Specification
FORM 2
THE PATENT ACT, 1970 (39 OF 1970) / Complete Specification (Section 10)
PILGRIM TUBE EXPANDER/EXPANSION SYSTEM.
(a) MR. SABNIS NARENDRA DAMODAR
Partner M/s. Sarel Engineers,
312-B Hind Saurashtra Industrial Estate,
Sir M.V. Road, Andheri (E), Mumbai-400059 (India),
India.
Nationality Indian
(b) MR.RELEPRATIMVASANT
Partner M/s. Sarel Engineers,
312-B Hind Saurashtra Industrial Estate,
Sir M.V. Road, Andheri (E), Mumbai-400059 (India),
India.
Nationality Indian
- 7 MAR 2005
7 - 1,-2 OQ S
The following specification described. The nature of the invention and the manner in which
it is to be performed :-
1) Title of Invention
PILGRIM TUBE EXPANSION SYSTEM
2) Field of Invention :-
This type of expansion system is welcomed by,and manufacturer and user of steam
generator used in Nuclear power products. OR highly precised tube rolling is required.
3) Background of Invention :-
This is a different type of tube expansion than conventional type being used in common
world. First we explain what is tube expansion and why it is required to be used by general
tube expander - commonly, heat exchanger and boilers are tubular structures arranged in
various pattern like squash pitch, etc, The tubes are termitted through terminal such as tube
sheets, square and round headers, water drum, steam drum etc. This construction permits
transfer of heat while separating the hot gases from the miscellaneous liquids or water from
one another.
Hence it will be seen that the pressure tight joint is an absolute its necessity between the
tube and its seat and it for this reason roller type tube expander was introduced in 1853 by
Richard Dudgeon from New York.
Tube expanding is basically cold working of tube and in order to form a pressure tight
frictional joints It causes stresses to be 2 set up in tube and its contracting seat - The amount
of wall thinning in tube determines the power of strength of holding joint and it is
established by the specified operating conditions that the equipment must withstand.
Different pull out test on mock up block or tube sheet hydrostatic or air test on assembled
components will assist in determining the correct amount of expansion or tightness
necessary. This sealing process of tube expansion is the amount of torque by means of load
applied generated through electric current in terms of ampere value. Higher the amps
greater the load. If the excess load is applied during tube expansion, chances of breaking
tube expansion tool inside the tube hole which may be deep inside like thread forming
tap breaks and difficult to remove from the hole compels the cancellation of particular tube
from the process that means bad workmanship as it leads to lower the efficiency expected.
To avoid this, use the expander and system that is free from above problem is PILGRIM TYPE
TUBE EXPANSION. It requires very less torque, i.e load in terms of amps current and
ultimately less load and breakage free. Ref. Product detail page 2 group 9 (As stated in detail
Description of Invention).

Objects of Invention :-
In all the field of its expansion it is proved to be most advantageous system.
It seal the seat of tube sheet hole even rough and little damaged because of its creaping
system or 3-5mm each step expansion seat that seals throughout.
It abolishes the spring back action by way of repeat expansion through 80% overlap
operation ref. page 2 group 7.
Uniform and parallel expansion throughout the long length of expansion ref page 1 group 4
& 5 Corrosion free : In conventional expansion while expanding the tube the air
accumulated between tube sheet hole and tube OD gets pressed and merges between the
seal. This air contains some oxidizing agencies helps the area to corrode in future.Pilgrim
Tube expansion wipes out this by creping system and its forwarded expansion action and
make the gap bubble free Light weight drive gun : Since requirement is very light and it is
compulsory to use 50%-4ess load efficiency gun to be used that reduces the cost factor of
investment.
Expansion through telescopic shaft and operator is free from lifting the drive gun.
No missed out of stage is possible since it expands in one go. ref. product detail page 1
group 3 & 4. 5. Statement of Invention :-
For Pilgrim type tube expansion

4 It is necessary to use low torque efficiency drive gun only. Such tube expansion
successfully carried as under : Order No. HZW/311823/NKN/dt. 5.3.2002 Customer : Larsen
& Toubro Inspection : Nuclear Power Corporation Ltd., 1. Type OD 19.05x1.11 thick
Total No. of tube ends 20,000 plus
Length of expansion 50+50= 100mm
Tube expansion carried out byM/s. Sarel Engineers (Patentee)
Pilgrim expander design and make : Sarel Engineer (Patentee)
Pilgrim expander Dia = 16.20mm
Drive Gun : 700 RPM
No load capacity - 0.38 to 0.48 amps
Full load capacity - L20 amps
Percentage tube thinning done 3-6
Working load - 0.65 to 0.75 amps
Duration of work - 2002-03.
2. Steam Generator Specification - 220 MWe L&T
LTTS 037 dt. 26-08-2003 Mock up block consisting 150 tube ends Inspection : Nuclear Power
Corporation Ltd. Tube: 16.00 OP x lm thick Pilgrim expander make : Sarel Engineers

5 Pilgrim expander dia = 13.3mm


Drive Gun ; Same as above
Working load - 0.55 to 0.60 amps (Current)
Expansion percentage thinning : 4-8%
6. Brief Summary and Description of invention accompanying with drawing. This torque
Control unit is ideally suited for Pilgrim Type Tube Expansion operations. Torque Control
Unit provides repetitive rube expansion operations for any number of Cycles. It has built in
Reverse Time Setting by which the time of the reverse operation can be selected to the
requirement of the tube expansion work. Before the next tube expansion is required, Pause
time also can be selected by the pause time setting switch. These switches are provided
with wide time settings. If, Auto repeat is selected, the drive will pause for a set time and
start new cycle. Trip will depend on Torque Setting Reverse / Pause as per the switch setting
This Torque Control units has very high repeat accuracy both in terms of Torque Settings
and Reverse & Pause settings.

7. Details Description of Invention with respect to drawing / example


1. It is a traveler expander
2. It is generally used in nuclear power steam generator thick tube and deep tube
expansion.
3. Longer length tube expansion and performs uniform, parallel and smooth expansion
zone.
_ ■* The tube is expanded as required length by same set of Pilgrim tube expander roller,
mandrel and cage in one go.
4. Pilgrim tube expander is not taken out once. it is put to use in tube for expansion
operation by non stop gradual forward reverse travel hence no missed out of stage in
between long expansion length is possible.
5. Every forward rotation gives longer overlap hence it irons out the earlier expanded area
that furnish good finish and accuracy.
6. Clutch assembly on last groove on pilgrim tube expander secure correct and consistent
depth of expansion.
7. Because it has larger overlap gives repeat expansion or iron out the previous backtail
expanded area helps the seat that seals perfectly and gives better push out strength in
minimum percentage.
8. Thinning thus life of the equipments is longer than other conventional method of tube
expansion system. Minimum breakage.
9. Pilgrim tube expansion every forward stroke covers only 20% of effective roller lengths as
new increased expansion zone keeping remaining 80% as overlap requires very Light torque.
Hence the operating load on the pilgrim tube expander is light and wear out of tooling is
minimized.
10. Construction of pilgrim tube expander is such that at any position roller or mandrel do
not fall out of the cage and no misplacing of loose rollers in deep hole tube is possible.

7. Claims of Invention
Enclosure to pilgrim tube expansion title sheet (product detail) This special Pilgrim type of
tube expansion system and procedure is developed for the first time in India by M/s. Sarel
Engineers, Mumbai - 400 059 and it is available to visit our website : to www.sarel engineers
trade-india.com This type of system is NOT available in any of Indian or International
catalogue or on any of their website. No other agency / film / individual has developed this
type of Pilgrim tube expansion tolls and system in India.

8 Sarel Engineers dedicated developed and designed successfully know how of special
pilgrim type of tube expansion tool system and procedure by spending their time R & D for
more than 2 V2 years with their experience, knowledge, expertise and above all investment
in terms of money, finance, using man power which was beyond capacity of this S.S.I. Unit.
All the tools, tackles etc., electronics equipments involved and used for system processes
are indigenous and there is no third party assistance, involvement or contribution to make
the tools, system and procedure successful.
This type of systems was approved, accepted and adopted by Nuclear Power Corporation of
India Ltd. (A Govt, of India Enterprises) in 2002 for their products use. This type of Pilgrim
Type of Tube Expanders tools and their components, system and procedure is not
commonly used earlier and in future the same cannot be copied, used, implemented by any
third party without written, agreed, consent by the PATENT APPLICANT.
3. PILGRIM TUBE EXPANSION SYSTEM

4. We claim
(a) MR. SABNIS NARENDRA DAMODAR Partner M/s. Sarel Engineers, 312-B, Hind Saurashtra
Industrial Estate, Sir. Mathuradas Vissanji Road,
Andheri (E), Mumbai - 400 059
India,
Nationality Indian
(b) Mr.RELEPRATIMVASANT
312-B Hind Saurashtra Industrial Estate,
Sir M.V. Road, Andheri (E), Mumbai-400059 (India)
10
Nationality Indian

You might also like