-Set up machine to run a standard Decoupled II process.
-Turn off pack and hole pressure and time.
-Adjust the transfer position to make the fill only shot 80% full. This will ensure
a short shot when the injection speed is increased.
-Raise the injection timer to the machine maximum
-Set the injection speed at the lowest setting.
-Take a shot and record the fill time
-Double the injection speed setting and take another shot. Record the fill time.
-Double the speed setting again.
-Keep doubling the injection speed until the machine is at its highest setting.
Machine Actual
Set Machine Expected %
Velocity Fill Time Velocity Fill Time Difference
6.22 0.45 4.93 0.36 -26.1%
5.6 0.47 4.72 0.40 -18.6%
4.98 0.5 4.44 0.45 -12.2%
4.36 0.55 4.04 0.51 -8.0%
3.74 0.62 3.58 0.59 -4.5%
3.12 0.72 3.08 0.71 -1.2%
2.5 0.87 2.55 0.89 2.0%
1.88 1.15 1.93 1.18 2.6%
1.26 1.67 1.33 1.76 5.2%
0.64 3.17 0.70 3.47 8.6%
Average % Difference:
-5%
Acceptable
Range: <10%
7.00
6.00
5.00
Actual Velocity
4.00 Actual
2.00
1.00
0.00
0 2 4 6 8
Machine Set Velocity