LR Data
LR Data
>0.05
Regression Statistics H0
Multiple R 0.135448814619149 There is no linear relationship b/n
R Square 0.0183463813817326 PA and Productive output
(m.Sq./Hr)
Adjusted R Square -0.177984342341921
Standard Error 3.63436892191663 P=0.772158462840705
Observations 7 Accept
ANOVA
df SS MS F
Regression 1 1.23429841132 1.23429841131835 0.0934463085
Residual 5 66.043187303 13.2086374605935
Total 6 67.2774857143
RESIDUAL OUTPUT
Residuals
4
Reject 2
0
-2 38 40 42 4
-4
Significance F
0.772158462840705
Productivity (sq.m/day)
-14.2164077647196 48.6990228446597 -14.216407765 48.699022845 30.0
-0.617921421682275 0.784721724375926 -0.6179214217 0.7847217244 20.0
f(x) = 0.0834
10.0 R² = 0.01834
0.0
38 42 46 5
PROBABILITY OUTPUT
DW (%)
Productivity (sq.m/day)
64.2857142857143 21.74 30
78.5714285714286 22.72 20
92.8571428571429 27.27
10
0
0 10 20 30
DW (%) Residual Plot
8
6
Residuals
4
2
0
-2 38 40 42 44 46 48 50 52 54 56 58
-4
DW (%) DW (%) Line Fit Plot
Productivity (sq.m/day)
30.0 Productivity
(sq.m/day)
20.0 f(x) = 0.0834001513468257 x +Linear
17.241307539970
(Productivit
R² = 0.0183463813817325 (sq.m/day))
DW (%) Line Fit Plot 10.0
Predicted Producti
0.0
Productivity (sq.m/day)
ity (sq.m/day)
30.0 35 40 45 50 55 60
20.0 Productivity
f(x) = 0.0834001513468257 x + 17.2413075399701
(sq.m/day) DW (%)
10.0 R² = 0.0183463813817325 Linear (Productivity
0.0 (sq.m/day))
38 42 46 50 54 58
DW (%)
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100
Sample Percentile
ne Fit Plot
Productivity
(sq.m/day)
513468257 x +Linear
17.2413075399701
(Productivity
13817325 (sq.m/day))
Predicted Productiv-
ity (sq.m/day)
5 60
Productivity (sq.m/day Vs DW(%)
Date Productivity (sq.m/day) DW (%)
2-Jan 27.3 42.6
3-Jan 19.2 44.4
4-Jan 20.0 42.8
5-Jan 22.7 56.1
10-Jan 18.5 45.2
11-Jan 21.7 39.2
12-Jan 17.2 41.7