0% found this document useful (0 votes)
14 views

ASSIGNMENT

This document discusses the network convention of PERT/CPM (Project Evaluation and Review Technique/Critical Path Method), specifically the activity-on-arrow and activity-on-node conventions. It provides examples of network diagrams using each convention. Students are assigned problems involving creating activity tables, determining float times, project duration, and critical paths for networks shown.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

ASSIGNMENT

This document discusses the network convention of PERT/CPM (Project Evaluation and Review Technique/Critical Path Method), specifically the activity-on-arrow and activity-on-node conventions. It provides examples of network diagrams using each convention. Students are assigned problems involving creating activity tables, determining float times, project duration, and critical paths for networks shown.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CIVIL ENGINEERING DEPARTMENT CMPM - CE 524C

COLLEGE OF ENGINEERING

NETWORK CONVENTION OF PERT/CPM

ACTIVITY ON ARROW (AOA) A


1 2
CMPM - CE 524C
Problem No. 3 (ASSGMNT) For the network as shown,
ACTIVITY ON ARROW (30 PTS) a. Create your activity table.
b. Show the line values of LC/ES in the figure.
CIVIL ENGINEERING DEPARTMENT

NOTE: c. Tabulate and compute the float time.


COLLEGE OF ENGINEERING

ADD THE 2ND TO THE LAST DIGIT OF d. Determine the total project duration.
YOUR STUDENT # IN EACH OF THE e. Determine the critical path.
ACTIVITY DURATION.
6 5
EX: 202012345
5 + 4 = 9 weeks 2 5 8
11
8 5
6 14 10
1 3 7 10

7 5
13
5 3
4 6 9
CMPM - CE 524C

NETWORK CONVENTION OF PERT/CPM


CIVIL ENGINEERING DEPARTMENT
COLLEGE OF ENGINEERING

ACTIVITY ON NODE (AON) 1 2


CMPM - CE 524C

Problem No. 2 (ASSGMNT) NOTE:


ACTIVITY ON NODE (30 PTS)
CIVIL ENGINEERING DEPARTMENT

The table shown are lists of activities for ADD THE 2ND TO THE LAST DIGIT OF
COLLEGE OF ENGINEERING

a network diagram of a project with YOUR STUDENT # IN EACH OF THE


corresponding duration. ACTIVITY DURATION.

a. Determine the total float. EX: 202012345


b. Determine the total project duration.
5 + 4 = 9 weeks

c. Determine the critical path.

ACTIVITY 1 2 3 4 5 6 7 8
Immediate
0 1 1 2,3 2 4 5,6 6
Predecessor
Duration
5 7 10 8 9 6 5 3
(weeks)