100% found this document useful (1 vote)
70 views1 page

Flare Tower Module M-08: Equipment

This document provides references to several design documents for Module M-08 of a flare tower project. It lists the identification codes for general notes, piping specifications, symbols standards, design requirements, painting standards, and tagging procedures that are relevant to the design of Module M-08 and its integration into the larger flare tower system.

Uploaded by

Choong K W
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
70 views1 page

Flare Tower Module M-08: Equipment

This document provides references to several design documents for Module M-08 of a flare tower project. It lists the identification codes for general notes, piping specifications, symbols standards, design requirements, painting standards, and tagging procedures that are relevant to the design of Module M-08 and its integration into the larger flare tower system.

Uploaded by

Choong K W
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

F G H I J L M N

REFERENCE DOCUMENTS
I-DE-3010.2G-1200-944-KES-001 - GENERAL NOTES
I-ET-3010.2G-1400-200-KES-001 - PIPING SPECIFICATION FOR TOPSIDE
I-ET-3000.00-0000-940-P4X-002 - SYMBOLS FOR PRODUCTION UNITS DESIGN
MODULE M-08 FLARE TOWER (NOTE 20) (NOTE 20)
I-ET-3010.1M-1350-960-P4X-002 - DESIGN REQUIREMENTS - NAVAL ARCHITECTURE
I-ET-3010.00-1200-956-P4X-002 - GENERAL PAINTING
TI TAHH TAHH TI
5415004 5415004 5415005 5415005 I-ET-3000.00-1200-940-P4X-001- TAGGING PROCEDURE FOR PRODUCTION UNITS DESIGN
I-ET-3010.00-1200-940-P4X-002 - GENERAL TECHNICAL TERMS
I-DE-3010.1M-5415-944-P4X-006 - PIPING AND INSTRUMENT DIAGRAM - AMINE VENT
OR COLLECTING
I-ET-3010.2G-1200-800-KES-003 - FLOW METERING SYSTEM (FMS)
TQF-P78-KES-FE-TOP-PRO-0129 - FMS GAS FLOW MEASUREMENT OF AMINE VENT
TSHH TSHH I-MC-3010.2G-5425-947-KES-001 - CO2 SYSTEM TOPSIDE
I-RL-3010.2G-5400-98X-KES-601 - TOPSIDES HAZOP C
5415004 5415005
E LT-P78-PB-KES-0086-21 - ADVANCED NOTICE OF CHANGE FOR ISOLATION GUIDELINES

EQUIPMENT
TY
TY TAG DESCRIPTION TYPE CAPACITY

PDAH PDAH CN-5425004A/B AMINE VENT STACK SNUFFING SYSTEM CO2 CYLINDERS -
(2 x 100%)
5415007 5415005 C
TIT V-5415002
FAH TIT AMINE UNIT VENT TRAP VERTICAL 1.78m³
(1 x 100%)
5415004 (NOTE 1)
5415011 5415005
(NOTES 4, 5, 7, 13, 17) (NOTE 3) (NOTES 4, 5, 7, 13, 17)

PDSH PDI
SAFE LOCATION
TE
PDSH PDI
SAFE LOCATION (NOTE 3)
GENERAL NOTES
TE
5415007 5415004 5415005 1 AMINE VENT TRAP POT FOR REMOVING CONDENSATE.
5415007 5415005 5415005
VES-801-2-S201N 2 THIS SIGNAL SHALL OPEN THE VALVE OF THE MASTER CYLINDERS.
TI FI FQI PI FSH VES-801-2-S201N
3 THERMOCOUPLE ELEMENT, TO BE SUPPLIED BY FLAME ARRESTER VENDOR.
VALV-54150050 VALV-54150052
5415011 5415011 5415011 5415011 5415011 3/4" 4 THE VENT DISCHARGE LOCATION SHALL BE DEFINED, AFTER GAS DISPERSION STUDY.
IT SHALL TAKE INTO CONSIDERATION:
3/4" (NOTES 9,18, 22) - AVOIDING CONDENSATION OF STEAM OVER STRUCTURAL SURFACE;
(NOTES 9,18, 22) C
(NOTE 22) - THE CONCENTRATION OF H2S AT SHIP EDGE SHALL BE LESS THAN 8 PPM (V)
CONSIDERING 17000 PPM ON THE DISCHARGE GAS.
PY PDIT (NOTES 5, 10, 11, 27)
PY PDIT (NOTES 5, 10,11, 27)
5 THE VENTS TIPS SHALL BE SEPARATED BY A MINIMUM DISTANCE (MINIMUM 2 METERS)
C
5415007 XSE 5415005 XSE IN ORDER TO ALLOW SAFE MAINTENANCE OPERATION.
+ + 6 RUPTURE PIN VALVE WITH ZSH INSTALLED.
PN-1223001 5415004 5415005 7 TO A REMOTE AND SAFE PLACE.
METERING UCP 3/4"
CABINET 3/4" 8 BLEEDER VALVE SHOULD BE INSTALLED IN ORDER TO PREVENT A NON-PLANED
FQIT VALV-54150049 DISCHARGE DUE TO MINOR LEAKS.
VES-801-2-S201N 9 FORESEEN A NOZZLE TO APPLY CO2 INTO VENT LINES.
5415011 SET=343.0 kPa-g VALV-54150051 10 FLAME ARRESTER CERTIFIED FOR DEFLAGRATION SHALL BE INSTALLED.
VES-801-2-S201N

VBO-150-2-S213N

VBO-150-2-S213N
VALV-54150018

VALV-54150019
11 IT SHALL BE FORESEEN FACILITIES FOR ACCESS AND CLEANING WITH AIR AND FRESH

(NOTE 12)
ZSH ZSL PSE

(NOTE 12)
WATER.

LO

LO
5415003 5415003
+
5415003 12 VALVES SHALL BE MECHANICALLY INTERLOCKED IN ORDER TO AVOID SIMULTANEOUS
D CLOSING BUT THEY COULD BE SIMULTANEOUSLY OPENED.
FMS (NOTES 28, 30, 32)
(NOTE 6)
13 ALL VENTS ON PROCESS/UTILITY PLANT SHALL BE ROUTED TO SAFE LOCATION AS
DEFINED ON I-DE-3010.2G-1200-944-KES-001 - PIPING AND INSTRUMENT DIAGRAM -
10"-F-B3N-0331-NI
I I GENERAL NOTES, TO GUARANTEE PROPER DISPERSION. THE VENT OUTLET IS TO BE
PIT TIT AT LEAST 8M (25ft) ABOVE ANY IMMEDIATELY ADJACENT PROCESS VESSEL OR
HYDROCARBON PROCESSING EQUIPMENT, AND AT LEAST 3M (10ft) ABOVE THE TOP OF
5415011 5415011 ANY VESSEL OR EQUIPMENT WITHIN AN 8M (25ft) RADIUS OF THE VENT, ACCORDING

10"-F-B3N-0332-NI
TO ABS FACILITIES ON OFFSHORE INSTALLATIONS.
14 THE MINIMUM PIPE SLOP OF 3% IN ORDER TO AVOID LIQUID ACCUMULLATION IN SUCH
ZLH ZLL LINES. THERE SHALL BE NO POCKETS IN THESE LINES IN CASE THIS IS NOT POSSIBLE
FIT

VALV-54150033
VES-801-2-S201N
5415003 5415003 TO ACHIEVE. AUTOMATIC DRAIN POINTS SHAL BE PROVIDED AND ROUTED TO
FE

3/4" 1" x 3/4"


5415011 +
CLOSED DRAIN SYSTEM.
5415011 15 LINES WITH SLOPE SHALL TAKE INTO ACCOUNT THE LIMITS FOR TRIM ANGLES
2" C STATED IN I-ET-3010.1M-1350-960-P4X-002 - DESIGN REQUIREMENTS - NAVAL
C ARCHITECTURE.
16 VALVE SHALL BE LOCATED AS NEAR AS POSSIBLE TO PROCESS LINE AND
VALV-54150038

HOLD -F-B3N-1210-NI
ACCESSIBLE TO THE OPERATOR.
VAF-150-2-S223N

HOLD -F-B3-0910-NI
17 VENT OUTLET SHALL HAVE A CURVATURE TO AVOID RAIN WATER ACCUMULATION.
(NOTES 23, 24, 30) C M-08 FLARE
3/4"

AND IT SHALL BE TAKEN INTO ACCOUNT IN H2S DISPERSION STUDY.


NC

FX FY 18 THE CONNECTION SHALL BE INSTALLED IN THE UPPER GENERATRIX OF THE PIPE.


(NOTE 26)

HOLD 9
+ +
5415011 5415011 HOLD 9 19 ALL V-5415002 INLET AND OUTLET LINES SHALL BE PAINTED WITH HIGH
TEMPERATURE RESISTANT INK, ACCORDING TO I-ET-3010.00-1200-956-P4X-002 -

FLARE

FLARE
(NOTE 28) (NOTE 29) GENERAL PAINTING. THE TEMPERATURE SHALL BE DEFINED BY THE AMINE

B3N
PAH PSH PI

VALV-54150035

B3
VES-150-2-S220N
REGENERATION PACKAGE.
5415002 5415002 5415002 20 TAHH-5415004/005 ARE ACTIVATAD IN CASE OF FIRE. THIS INFORMATION SHALL

VALV-54150017 VALV-54150015
VES-801-2-S201N
FMS

VES-800-1-C103
VALV-54150048 VALV-54150012

VES-800-1-C103
2"

(NOTE 16)

E8
APPEAR IN THE SUPERVISION OPERATION SYSTEM (SOS) ALARM DESCRIPTION.

M-01

M-01

LO
LO

(NOTE 16)
E8
VALV-54150036
NC SC-FIT-54150011 3/4"-W -B10-0962-NI 21 DUE TO GAS WITH HIGH H2S CONTENT, FLANGES AND THREADED CONNECTION ARE
SC3
PROHIBITED. ALL VALVES SHALL BE WELDED TYPE.
3/4"
C5
MODULE M-01

MIN.

MIN.
(NOTES 31, 33) 22 TYPICAL ARRANGEMENT FOR CO2 SPRAY NOZZLE CONNECTION TO ASSURE GOOD
(NOTE 31)
VES-801-2-S202N C MIXING AND NOZZLE PROJECTION.
3/4"-F-B3N-1115-NI
VALV-54150045 23 ALL VALVES, INSTRUMENT AND PIPING WITHIN THIS SYSTEM SHALL BE DESIGNED TO

VRE-800-1-C102
PIT

VRE-800-1-C102
PY MAX. CONTENT OF 17,000 ppmv OF H2S AND 90% OF CO2.
5415002 2"-F-B3N-1116-NI
3/4" HOLD 9 24 CANCELLED.
1"-DO-E8 -0032-NI 25 CANCELLED.
26 LOW POINT DRAIN. THE VALVE POSITION SHALL TAKE INTO CONSIDERATION THE
C TRIM OF THE STATIONARY PRODUCTION UNIT AND MUST BE ACCESSIBLE FROM A
FIXED WORKING PLATFORM.
C 27 FLAME ARRESTER XSE-5415004/005 MUST BE INSTALLED AT AN ACCESSIBLE POINT AT

1"-DO-E8-0031-NI
15413
SLOPE

THE BASE OF FLARE TOWER OR AT THE TOWER LANDING, IN ORDER NOT TO NEED A
3%

13 C
CN-5425004B 28
TEMPORARY MAINTENANCE STRUCTURE (SCAFFOLDING).
REMOVABLE UPSTREAM STRAIGHT PIPE RUN OF AT LEAST 20D (20 TIMES THE
(NOTE 8) NOMINAL DIAMETER OF THE METER). FLOW METER SPOOL SHALL HAVE INTERNAL
C DIMENSIONAL INSPECTION, WITH ACCREDITED CERTIFICATE BY RBC OR ILAC.
10"-F-B3N-0332-NI

HOLD 9 29 REMOVABLE DOWNSTREAM STRAIGHT PIPE RUN OF AT LEAST 10D (10 TIMES THE
(NOTES 14, 36)

NOMINAL DIAMETER OF THE METER).


30 PROTECTIVE SHADES SHALL BE PROVIDED TO FLOW METERS, IN ORDER TO PROTECT

OPEN
THEM FROM EFFECTS OF LARGE AMBIENT TEMPERATURE VARIATIONS DUE TO THE
FLARE RADIATION.
P
04

31 THE VENT SAMPLING POINT SHALL BE CAPABLE OF COLLECTING REPRESENTATIVE


ES

OR
00

SAMPLES EVEN WITH LOW PRESSURE LEVELS, THEREFORE A VACUUM PUMP SHALL
15

C
54

BE FORESEEN.
10" (NOTE 36) 32 INSTRUMENT SUPPLIED LOOSE
33 GAS FLOW MEASURING AND SAMPLER INCLUDED ACCORDING TO
I-MD-3010.1M-1200-940-P4X-025 PUNCH LIST (ITEM 1.5.1.1 AND
N2
AND HS AND I I TQF-P78-KES-FE-TOP-PRO-0129).
C VALV-54150031 5415005 34 HAND SWITCH HS-5415003 SHALL BE SUPPLIED BY VENT STACK SNUFFING SYSTEM
VDE-150-2-S207N V-5415002 MANUFACTURER.
N5A (NOTE 2) 35 LIC SHOULD BE CONFIGURED TO ALLOWS SWAP BETWEEN PID AND ON/OFF
2" (NOTE 2) CONTROL, AND VICE-VERSA. THUS, THE VALVES WILL ACT AS ON/OFF WHEN THERE IS
MAGNETIC 2"-F-B3N-0705-NI (NOTE 1)
NO CONTINUOUS FLOW, AND AS PID CONTROL WHEN REQUIRED.
VALV-54150046 C
VDE-150-2-S207N I HS 36 THE PIPING DESIGN OF THE AMINE UNIT VENT TRAP (V-5415002) MUST GUARANTEE
LG C 3"
5415003 THE REMOVAL OF THE FLANGED TOP COVER PLATE (A 40" FLANGE).
N4A
5415004 37 SERVICE CONNECTION.
3"

OPEN
DP 3"-F-B3N-0706-NI (NOTE 34)
N6

LY LIT
18"
5415002 C
CN-5425004A HOLD TABLE
B VDE-150-2-S207N
VALV-54150047 (NOTE 8) HOLD 9 - DIAMETER TO BE CONFIRMED ACCORDING TO VENT STACK SNUFFING
3"
N4B CAPACITY.
3" HLL=725.0 mm
3"-F-B3N-1211-NI
VDE-150-2-S207N NLL=575.0 mm
C P 5
ES 5000
VALV-54150032 LLL=425.0 mm
N5B
1
54
APPROVED FOR CONSTRUCTION ACCORDING TO DDA-P78-KES-
2" C 13/12/2022 RRo.DCX FMo.DCX SSK
2"-F-B3N-0017-NI 01570 AND HAZOP RECOMMENDATIONS
APPROVED FOR CONSTRUCTION ACCORDING TO DDA-P78-KES-
B 24/06/2022 FQu.DCX CBs.DCX SSK
01570, ABS LETTER T2162607 AND HAZOP RECOMMENDATIONS
APPROVED FOR CONSTRUCTION ACCORDING TO
C A
DDA-P78-KES-01570
30/12/2021 FQu.DCX BFa.DCX SSK
12"-F-B3N-0625-NI
N1 I-DE-3010.2G-1234-944-KES-004 04086 0 FOE CONSTRUCTION 22/07/2021 DMo.DCX MPn.DCX SSK
Z-1234001
10" 12" x 10" REV. DESCRIPTION DATE EXEC. CHECK APPROV.

N3 INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF


C THEIR PURPOSE.
C
LIC 2" TYPICAL DETAIL 1 FORM OWNED TO PETROBRAS N-381 REV. L.
15 P
06

CONTRACT:
ES

VES-150-2-S220N
5415002
00

(NOTE 37) VALV-54150037 5900.0117818.21.2


Keppel Shipyard / BrasFELS
54

VALV-54150039 CONTRACTOR No:


(NOTE 35) VRE-150-1-S211N 2" -
2" Designer: DBR Energies S. A. TECH. RESP.: CREA No:
LI C 2"-DFC-B3N-0119-NI SPPID/V2019/I-DE-3010.2G-5415-944-KES-006_C.pid SHRAVAN KAMAT -
VALV-54150030
VES-150-2-S226N

5415002 30°
VENT
VES-150-2-S220N
VALV-54150001

VES-801-2-S202N SRGE
LV VALV-54150027
LSH LAH +
5415002 80° CLIENT:
3/4"
2" x 1"
VALV-54150003

5415002 5415002
MAXIMUM 1000mm E&P
VGL-150-2-S201N

LY NC
FC

1" C
2" MINIMUM 1m OUTER
JOB:
2" x 1"
OF SIDE SHELL

LSL LAL BUZIOS FIELD AREA DEVELOPMENT


VALV-54150029
VES-150-2-S220N

3/4"
A 5415002 5415002 VALV-54150028 AREA:
VES-801-2-S202N
PETROBRAS 78 (P-78)
TITLE:
2"-DFC-B3N-0808-NI

PIPING AND INSTRUMENT DIAGRAM


CO2 FIRE FIGHTING AMINE VENT COLLECTING
SYSTEM
45° DESIGN EXEC. CHECK APPROV.
KES DMo.DCX MPn.DCX SSK
SCALE SHEET
NO SCALE DRAWING - 01 of 01
09004

35 (I) SCP78
DATE No.

A1 22/07/2021 I-DE-3010.2G-5415-944-KES-006
841mm X 594mm

You might also like