Rate Analysis
Rate Analysis
Item Unit
Details 1. Filling in plinth with brought out murum Quantity 1 cum
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A. Material
Total of A 423.36
B. Wastage @ 5% 21.17
50mm/230mm = 20%
1 cum x 20% = 0.2 cum 0.2 cum 352.80 70.56
Total of A 652.68
B. Wastage @ 5% 32.63
1.520/(Sum of Proportion)
1.520cum/(1+3+6)
Therefore, Value for 0ne (1) is
0.152
OR Readymix 1 cum 0 0
Total of A 2486.04
B. Wastage @ 5% 124.30
Total of A
to E 3976.12
F. Add for Profit &
Overheads @ 15% 596.42
G. TOTAL AMOUNT INCL. P & O Rate for 1 cum 4572.54
RATE ANALYSIS
Item Unit
Details 4. PCC at foundation base in concrete mix 1:2:4 (M150) Quantity 1 cum
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A. Material
Ratio between Wet mix to Dry
mix = 1cum : 1.52cum
1.520/(Sum of Proportion)
Therefore, 1.520cum/(1+2+4)
Therefore, Value for 0ne (1) is
0.217
OR Readymix 1 cum 0 0
Total of A 2992.81
B. Wastage @ 5% 149.64
Total of A
to E 4308.23
F. Add for Profit &
Overheads @ 15% 646.24
G. TOTAL AMOUNT INCL. P & O Rate for 1 cum 4954.47
RATE ANALYSIS
Item Unit
Details 5. RCC column/beam/slab in concrete mix 1:1.5:3 (M200) Quantity 1 cum
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A. Material
Ratio between Wet mix to Dry
mix = 1cum : 1.52cum
1.520/(Sum of Proportion)
Therefore, 1.520cum/(1+1.5+3)
Therefore, Value for 0ne (1) is
0.276
B. Wastage @ 5% 179.29
Total of A
to E 7672.63
F. Add for Profit &
Overheads @ 15% 1150.90
G. TOTAL AMOUNT INCL. P & O Rate for 1 cum 8823.53
RATE ANALYSIS
Item Unit
Details 7. Reinforcement steel work in RCC work Quantity 1000 kg
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A. Material
Total of A 54620.00
B. Wastage @ 5% 2731.00
Total of A
to E 66443.40
F. Add for Profit &
Overheads @ 15% 9966.51
G. TOTAL AMOUNT INCL. P & O Rate for 1000kg 76409.91
Rate for 1kg 76.41
RATE ANALYSIS
8. BB masonary 230mm thick in CM 1:5
Material Factor calculations
a) Brick
Brick size 225mm x 110mm x 65mm
Sample 1m x 1m x a) No. brick in one layer with 10mm mortor joint = 1m/0.235 = 4.25nos x 2 lines
0.23m = 0.23 cum >> = 8.50 nos
b) No. layers vertically with 10mm mortor joint = 1m/0.075 = 13.35 nos
No of bricks per 0.23 8.50 no x 13.35 no = 113.45 no
cum >>
No. of bricks/cum 113.45 no / 0.23 cum = 493 nos say 500 nos per cum
b) Mortor
Qty. of mortor/cum Qty. of whole masonary - Qty. of bricks = qty. of mortor
1 cum - (493 no x 0.225 x 0.11 x 0.065) = 0.21cum
Dry vol of mortor >> Wet volume + 20% Bulkage factor
0.21 cum + 0.04 cum = 0.25 cum
Item Unit
Details 8. BB masonary 230mm thick in CM 1:5 Quantity 1 cum
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Bricks 1 cum x 500 no 500 No 9.00 4500.00
2 Mortor For 1 cum = 0.25 cum
Therefore, 0.250/(Sum of proportion)
Therefore, 0.250 cum/(1+5)
Therefore, Value for One (1) is
0.042
a Cement 0.042 cum x 30 1.25 bag 270.00 337.50
(1cum = 30 bags)
b Crush Sand 0.042 cum x 5 0.21 cum 987.84 207.45
(Fine aggregate)
Total of A 5044.95
B. Wastage @ 5% 252.25
C. Plant & M/C @1% 50.45
C1. Scaffolding @ 1% 50.45
D. Water & Electricity
incl. curing @ 2% 100.90
E. Labour charge 1 cum 935.65 935.65
Total of A
to E 6434.64
F. Add for Profit &
Overheads @ 15% 965.20
G. TOTAL AMOUNT INCL. P & O Rate for 1 cum 7399.84
RATE ANALYSIS
9. Half thick (115mm thick) BB masonary in CM 1:4 excluding RCC band
Material Factor calculations
a) Brick
Brick size 225mm x 110mm x 65mm
Sample 1m x 1m a) No. brick in one layer with 10mm mortor joint = 1m/0.235 = 4.25nos
b) No. layers vertically with 10mm mortor joint = 1m/0.075 = 13.35 nos
Bricks per 1 Sq.m >> 4.25 no x 13.35 no = 57 no say 60 nos per Sq.m
b) Mortor
Qty. of mortor/cum Qty. of whole masonary - Qty. of bricks = Qty. of mortor
0.11 cum - (57 no x 0.225 x 0.11 x 0.065) = 0.018cum
Dry vol of mortor >> Wet volume + 20% Bulkage factor
0.018 cum + 0.0036 cum = 0.0216 cum per Sq.m
Say 0.022 cum per Sq. m
Item Unit
Details 9. Half thick (115mm thick) BB masonary in CM 1:4 excluding RCC band Quantity 1 Sqm
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Bricks 1 Sqm x 60 no 60 No 9.00 540.00
2 Mortor For 1 Sqm = 0.022 cum
Therefore, 0.0220/(Sum of proportion)
Therefore, 0.0220 cum/(1+4)
Therefore, Value for One (1) is
0.0044
a Cement 0.0044 cum x 30 0.13 bag 270.00 35.64
(1cum = 30 bags)
b Crush Sand 0.0044 cum x 4 0.0176 cum 987.84 17.39
(Fine aggregate)
Total of A 593.03
B. Wastage @ 5% 29.65
C. Plant & M/C @1% 5.93
C1. Scaffolding @ 1% 5.93
D. Water & Electricity
incl. curing @ 2% 11.86
E. Labour charge 1 Sqm 190.00 190.00
Total of A
to E 836.40
F. Add for Profit &
Overheads @ 15% 125.46
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 961.86
RATE ANALYSIS
Item Unit
Details 10. UCR masonary in CM 1:6 Quantity 1 cum
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Stone 1 cum x 1.40 1.4 cum 529.20 740.88
(add 40% dressing/void factor)
2 Mortor For 1 cum = 0.40 cum
Therefore, 0.4/(Sum of proportion)
Therefore, 0.4 cum/(1+6)
Therefore, Value for One (1) is
0.057
a Cement 0.057 cum x 30 1.71 bag 270.00 461.70
(1cum = 30 bags)
b Crush Sand 0.057 cum x 6 0.342 cum 987.84 337.84
(Fine aggregate)
Total of A 1540.42
B. Wastage @ 5% 77.02
C. Scaffolding @ 1% 15.40
D. Water & Electricity
incl. curing @ 2% 30.81
E. Labour charge 1 cum 1080.00 1080.00
Total of A
to E 2743.65
F.
Add for Profit &
Overheads @ 15% 411.55
G. TOTAL AMOUNT INCL. P & O Rate for 1 cum 3155.20
RATE ANALYSIS
Item Unit
Details 11. Door of size 1.00m x 2.10m with wood frame section 150mm x 75mm Quantity
1 No
and Flush door shutter with paint or laminate finish Assumed
1 Wood
Verticle members 2 x 2.15m x 0.15m x 0.075m 0.048
Horizontal member 1 x (1.00m +2 x 0.15m) x 0.15m x
0.075m 0.015
Total qty 0.063 cum 105840.00 6667.92
3 Lipping strip 2 x (1.00 + 2.10) x 0.035 x 0.015 0.003255 cum 105840.00 344.51
Total of A 8629.43
B. Wastage @ 5% 431.47
RATE ANALYSIS
12. Neeru finish (Sanala) plaster 8mm to 10mm thick for ceiling in CM 1:3
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.01m
+ 20%= Bulkage
0.01cum
Dry vol of mortor >> factor
0.01 cum + 0.002 cum = 0.012
cum per Sq.m
Item Unit
Details 12. Neeru finish (Sanala) plaster 8mm to 10mm thick for ceiling in CM 1:3 Quantity 1 Sqm
Assumed
Total of A 66.05
B. Wastage @ 5% 3.30
C. Scaffolding @ 1% 0.66
D. Water & Electricity
incl. curing @ 2% 1.32
E. Labour charge 1 Sqm 236.72 236.72
Total of A
to E 308.06
F. Add for Profit &
Overheads @ 15% 46.21
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 354.26
RATE ANALYSIS
13. Neeru finish (Sanala) plaster 12mm to 15mm thick for wall in CM 1:4
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.015m
+ 20% =Bulkage
0.015cum
Dry vol of mortor >> factor
0.015 cum + 0.003 cum = 0.018
cum per Sq.m
Item Unit
Details 13. Neeru finish (Sanala) plaster 12mm to 15mm thick for wall in CM 1:4 Quantity 1 Sqm
Assumed
Total of A 89.96
B. Wastage @ 5% 4.50
C. Scaffolding @ 1% 0.90
D. Water & Electricity
incl. curing @ 2% 1.80
E. Labour charge 1 Sqm 236.72 236.72
Total of A
to E 333.88
F. Add for Profit &
Overheads @ 15% 50.08
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 383.96
RATE ANALYSIS
14. Sandfaced double coat plaster 18mm to 20mm thick for wall in CM 1:4
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.020m
+ 20% =Bulkage
0.020cum
Dry vol of mortor >> factor
0.020 cum + 0.004 cum = 0.024
cum per Sq.m
Item Unit
Details 14. Sandfaced double coat plaster 18mm to 20mm thick for wall in CM 1:4 Quantity 1 Sqm
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A. Material
Mortor For 1 Sqm = 0.024 cum
Therefore, 0.0240/(Sum of proportion)
Therefore, 0.0240 cum/(1+4)
Therefore, Value for One (1) is
0.0048
Total of A 106.62
B. Wastage @ 5% 5.33
C. Scaffolding @ 1% 1.07
D. Water & Electricity
incl. curing @ 2% 2.13
E. Labour charge 1 Sqm 301.28 301.28
Total of A
to E 416.43
F. Add for Profit &
Overheads @ 15% 62.46
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 478.89
RATE ANALYSIS
15. Kota stone flooring (Hand dressed/machine cut) on 50mm thick sub base in CM 1:5 with Cement Paste
backing
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.050m
+ 20% =Bulkage
0.050cum
Dry vol of mortor >> factor
0.050 cum + 0.010 cum = 0.060
cum per Sq.m
Item Unit
Details 15. Kota stone flooring (Hand dressed/machine cut) on 50mm thick sub base Quantity
1 Sqm
in CM 1:5 with Cement Paste backing Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Kota stone Considering 20% hand dressing /
cutting wastage
1 Sqm + 0.20 Sqm 1.2 Sqm 430.40 516.48
2 Mortor For 1 Sqm = 0.060 cum
Therefore, 0.0600/(Sum of proportion)
Therefore, 0.0600 cum/(1+5)
Therefore, Value for One (1) is
0.01
a Cement 0.01 cum x 30 0.30 bag 270.00 81.00
(1cum = 30 bags)
b Crush Sand 0.01 cum x 5 0.05 cum 987.84 49.39
(Fine aggregate)
c Add extra cement for
backing paste 0.1 bag per Sqm x 1 sqm 0.1 bag 270.00 27.00
Total of A 673.87
B. Wastage @ 5% 33.69
C. Plant, Machinery &
Equipments @ 1% 6.74
D. Water & Electricity
incl. curing @ 2% 13.48
E. Labour charge (Incl Dressing & fixing) 1 Sqm 645.60 645.60
Total of A
to E 1373.38
F. Add for Profit &
Overheads @ 15% 206.01
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 1579.39
RATE ANALYSIS
16. Vitrified tile flooring 35mm thick sub base in CM 1:5 with Cement slurry
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.050m
+ 20% =Bulkage
0.035cum
Dry vol of mortor >> factor
0.0350 cum + 0.007 cum = 0.042
cum per Sq.m
Item Unit
Details 16. Vitrified tile flooring 35mm thick sub base in CM 1:5 with Cement slurry Quantity 1 Sqm
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Vitrified tile 1 Sqm 645.60 645.60
Total of A 763.87
B. Wastage @ 5% 38.19
C. Plant, Machinery &
Equipments @ 1% 7.64
D. Water & Electricity
incl. curing @ 2% 15.28
E. Labour charge 1 Sqm 269.00 269.00
Total of A
to E 1093.98
F. Add for Profit &
Overheads @ 15% 164.10
G. TOTAL AMOUNT INCL. P & O Rate for 1Sqm 1258.08
17. Vitrified tile for wall (Dado) 15mm thick backing CM 1:2
Material Factor calculations
Mortor
Qty. of wet mortor 1m
Wetxvolume
1m x 0.015m
+ 20% =Bulkage
0.015cum
Dry vol of mortor >> factor
0.0150 cum + 0.003 cum = 0.018
cum per Sq.m
Item Unit
Details 17. Vitrified tile for wall (Dado) 15mm thick backing CM 1:2 Quantity 1 Sqm
Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Vitrified tile 1 Sqm 484.20 484.20
Total of A 575.14
B. Wastage @ 5% 28.76
Total of A
to E 836.35
F. Add for Profit &
Overheads @ 15% 125.45
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 961.80
RATE ANALYSIS
18. Brick bat waterproof treatment 100mm thick in CM 1:3 with smooth surface finish
Material Factor calculations
a) Brick
Brick size 225mm x 110mm x 65mm
Sample 1m x 1m a) Bricks in one direction with 15mm mortor joint = 1m/0.24 = 4.17nos
b) Bricks in another direction with 15mm mortor joint = 1m/0.125 = 8 nos
Bricks per 1 Sq.m >> 4.17 no x 8 no = 35 no per Sq.m
b) Mortor
Qty. of mortor/cum Qty. of whole mass - Qty. of bricks = Qty. of mortor
0.10 cum - (35 no x 0.225 x 0.11 x 0.065) = 0.044cum
Dry vol of mortor >> Wet volume + 20% Bulkage factor
0.044 cum + 0.009 cum = 0.053 cum per Sq.m
Item Unit
Details 18. Brick bat waterproof treatment 100mm thick in CM 1:4 with smooth Quantity 1 Sqm
surface finish Assumed
Item No. Item Head Calculations Quantity Unit Rate/Unit Amount
A Material
1 Bricks 1 Sqm x 35 no 35 No 7.00 245.00
B. Wastage @ 5% 19.61
C. Scaffolding @ 1% 3.92
D. Water & Electricity
incl. curing @ 2% 7.84
E. Labour charge 1 Sqm 376.60 376.60
Total of A
to E 800.12
F. Add for Profit &
Overheads @ 15% 120.02
G. TOTAL AMOUNT INCL. P & O Rate for 1 Sqm 920.13
1 Murum filling Add 20% in basic quantity 1 cum Addition for compaction factor
Therefore, 1 cum + 0.2 cum 1.2 cum
7 Reinforcement steel
a) Mild/Tor steel 45 Kg
b) Binding wire 55 Kg
8 Readymix concrete
a) M80 cum
b) M100 cum
c) M150 cum
d) M200 cum
e) M250 cum
f) M300 cum
g) M350 cum
13 AAC Block
a) 100mm thick No
b) 150mm thick No
c) 200mm thick No
16 Glass sqm
18 Laminate sqm
23
Labour Rates
3 Supporting staff
a) Curing labour
b) Housekeeping
4 Site establishment
a) Stores
b) Office
c) Labour camp
d) Security cabin
e) Toiletry unit
6 Scaffolding material
7 Transportation
a) Material
b) Site staff
c) Site labour
8 Insurance
a) Labour licencing
b) CAR and WC policy
9 Incidentals
10 Stationary
Project Period: Months
Amount Comment