0% found this document useful (0 votes)
65 views

Lindah Project Final

This project presents working drawings and material estimates for plumbing systems in a building. Chapter 1 describes a cold water supply system to feed appliances like a shower and sink, a hot water system for shower and tub, and drainage system to the first manhole. Chapters 2 and 3 provide scaled drawings of the cold/hot water distribution and drainage layout. Chapters 4 and 5 estimate quantities of materials and fittings needed and provide costing for the plumbing systems.

Uploaded by

henrykinyati99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views

Lindah Project Final

This project presents working drawings and material estimates for plumbing systems in a building. Chapter 1 describes a cold water supply system to feed appliances like a shower and sink, a hot water system for shower and tub, and drainage system to the first manhole. Chapters 2 and 3 provide scaled drawings of the cold/hot water distribution and drainage layout. Chapters 4 and 5 estimate quantities of materials and fittings needed and provide costing for the plumbing systems.

Uploaded by

henrykinyati99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 23

TRADE PROJECT

PRESENTED BY : GITONGA LINDAH NKATHA

COURSE NUMBER : 1305 /316

INDEX NUMBER : NULL

PRESENTED TO : KENYA NATIONAL EXAMINATION


COUNCIL IN PARTIAL FULFILLMENT
OF THE REQUIREMENTS FOR AWARD
OF PLUMBING CRAFT CERTIFICATE

INSTITUTION : THIKA TECHNICAL TRAINING


INSTITUTE

SERIES : NOVEMBER / DECEMBER 2023

1
DECLARATION

I Lindah Ngatha hereby declare that this project is uniquely prepared by me after the
completion of two years schooling at Thika Technical Training Institute.

Name of Student … ...

Signature .

Date

Name of the Supervisor

Signature ...

Date

i
DEDICATION

I dedicate this effort to the KNEC desk, my wonderful parents, my supervisor, and the entire team of
the Thika Technical Training Institute, who have helped me learn and have consistently served as
sources of inspiration. They contributed drive and enthusiasm to help me handle the problem that
was given to me.

God bless you and I appreciate you so much.

ii
ACKNOWLEDGEMENT

First of all, I want to express my gratitude to the All-Powerful God for guiding me this far
and providing me with a nice life while I was learning.

I would want to thank the many individuals whose work, encouragement, and direction were
necessary for the development of this project.

I am really appreciative to my project manager, Peter Karanja, who has always provided
advice on how to gain skills for writing the project.

I also want to express my gratitude to Mr. Charles Kigen, our class instructor, who has
always given me advice on how to approach academic challenges.

I also want to express my gratitude to Mr. Gitonga and Mrs.Gitonga, my parents, for their
wise counsel and wisdom that they instilled in me over the course of my two years of
education.

God bless you all.

TABLE OF CONTENTS

iii
DECLARATION.........................................................................................................................................i

DEDICATION...........................................................................................................................................ii

ACKNOWLEDGEMENT...........................................................................................................................iii

TABLE OF CONTENTS............................................................................................................................iv

EXECUTIVE SUMMARY...........................................................................................................................v

CHAPTER ONE........................................................................................................................................1

1.1 A complete Cold Water Supply System to feed all the Appliances............................................1

1.2 A Complete hot water supply system to feed all the appliances...............................................1

1.3 A drainage system that drain all appliances upto the first manhole..........................................2

CHAPTER TWO.......................................................................................................................................3

2.0 Using a Scale of 1:20 prepare a working drawing of cold water distribution.............................3

2.1 Using a scale of 1:20 prepare a working drawing of hot water distribution..............................4

CHAPTER THREE.....................................................................................................................................6

3.0 Using a scale of 1:20 prepare a working drawing for the drainage system................................6

3.1 Plan............................................................................................................................................6

3.2 Isometric Pipe Layout................................................................................................................6

CHAPTER FOUR......................................................................................................................................7

4.0 Estimate the quantities of materials and fittings for the following............................................7

4.1 Cold Water Distribution System.................................................................................................7

4.2 Hot Water Distribution System..................................................................................................8

4.3 The entire drainage....................................................................................................................9

CHAPTER FIVE......................................................................................................................................10

5.0 Estimate the quantities of materials and fittings for the following..........................................10

5.1 Cold Water Distribution System...............................................................................................10

5.2 Hot Water Distribution System................................................................................................11

5.3 The entire drainage..................................................................................................................12

CHAPTER SIX
13

iv
v
EXECUTIVE SUMMARY

CHAPATER ONE
A cold-water system supply that supplies the shower, low level WC, bowl urinal, wash basin,
and bathtub.

a hot water supply system for the shower, bathtub, and washbasin.

a drainage system that collects waste and soil appliances from the shower, low-level WC,
bowl urinal, and bathtub.

CHAPTER TWO AND THREE


The drainage system, as well as the cold and hot water delivery systems, are shown in these
working drawings at a scale of 1:2.

CHAPTER FOUR
This section shows how much plumbing supplies and fittings are needed for the full drainage
system, including the cold and hot water distribution systems.

CHAPTER FIVE
This part provides an illustration of the going rate for the labor, cold and hot water
distribution system, drainage materials, and appliances.

CHAPTER SIX

This is a functioning program that shows activities for the complete installation in preparation.

vi
CHAPTER ONE

1.1 A complete Cold Water Supply System to feed all the Appliances

A cold-water supply system exclusively uses cold water from the storage system, which is
then piped via a 1-inch diameter to the appliances.
The water is then reduced from a 1-inch pipe to a 34-inch pipe that distributes water to the
appliance's point. Later, the pipe is reduced using a G.I. reducing bush and a hexagonal
nipple so that it can handle a 12-inch flex tube.

1.2 A Complete hot water supply system to feed all the appliances

A hot water cylinder receives water from a storage tank via a 1-inch pipe, where it enters, and
a 34-inch pipe, where it exits, supplying some items like a washbasin, bathtub, and shower.
1.3 A drainage system that drain all appliances upto the first manhole

All waste appliances are collected in a drainage system, which runs from the appliances
to the manhole as illustrated.

2
3
CHAPTER TWO

2.0 Using a Scale of 1:20 prepare a working drawing of cold-water distribution

2.0.1 Plan

2.0.2 Elevation

4
2.0.3 Isometric pipe layout

2.1 Using a scale of 1:20 prepare a working drawing of hot water distribution

2.1.1 Plan

2.1.2 Elevation

5
2.2.3 Isometric pipe layout

6
CHAPTER THREE

3.0 Using a scale of 1:20 prepare a working drawing for the drainage system

3.1 Plan

7
3.2 Isometric Pipe Layout

8
CHAPTER FOUR

4.0 Estimate the quantities of materials and fittings for the following

4.1 Cold Water Distribution System

Materials Quantity
3000l Storage tank 1
¾ “ PPR Pipes 4
1” Pipes 2
Wash hand basin 1
Low level W.C 1
Bowl Urinal 1
Bath tub 1

Fittings Quantity
Gate valve 1” 1
PPR Elbow 1” 3
PPR Reducing bush 1” to ¾ “ 1
PPR TEE ¾ “ 4
PPR Female Elbow ¾ “ 5
PPR Elbow plain ¾” 3
Flex tubes ½ “ 4
GI Reducing Bush ¾” to ½ “ 5
GI Nipples ½ “ 5
Pillar Tap ½ “ 2
Shower Bend 1
Shower head 1

9
4.2 Hot Water Distribution System

Materials Quantity
3000l Storage tank 1
¾ “PPR Pipes 4
1” PPR Pipes 1
Wash hand basin 1
Bath tub 1
Hot water cylinder 1

Fittings Quantity
Gate valve 1” 1
PPR Elbow 1” 3
PPR Reducing bush 1” to ¾ “ 1
PPR TEE ¾ “ 2
PPR Elbow plain ¾” 2
PPR Female Elbow ¾ “ 3
Flex tubes ½ “ 2
GI Reducing Bush ¾” to ½ “ 3
GI Nipples ½ “ 3
Pillar Tap ½ “ 2
Shower Bend 1
Shower head 1

10
4.3 The entire drainage

Materials Quantity
4” Waste pipe PVC 1
2” Waste Pipe PVC 4
Manhole lead 1

Fittings Quantity
2” Magic Connectors 2
2” Elbows 6
2” Tee 1
4” Magic Connector 1
4” Elbows 2

11
CHAPTER FIVE

5.0 Estimate the quantities of materials and fittings for the following

5.1 Cold Water Distribution System

Materials Quantity Cost


3000l Storage tank 1 28000
¾ “PPR Pipes 4 1200
1” Pipes 2 760
Wash hand basin 1 4000
Low level W.C 1 12000
Bowl Urinal 1 8000
Bath tub 1 16000
Sub-total 66360

Fittings Quantity Cost


Gate valve 1” 1 1200
PPR Elbow 1” 3 150
PPR Reducing bush 1” to ¾ “ 1 40
PPR TEE ¾ “ 4 160
PPR Female Elbow ¾ “ 5 300
PPR Elbow plain ¾” 3 120
Flex tubes ½ “ 4 800
GI Reducing Bush ¾” to ½ “ 5 250
GI Nipples ½ “ 5 200
Pillar Tap ½ “ 2 2000
Shower Bend 1 70
Shower head 1 200
Sub-total 5490

12
5.2 Hot Water Distribution System

Materials Quantity Cost


3000l Storage tank 1 27000
¾ “ PPR Pipes 4 1200
1” PPR Pipes 1 380
Wash hand basin 1 3000
Bath tub 1 11000
Hot water cylinder 1 12000
Sub-total 54580

Fittings Quantity Cost


Gate valve 1” 1 1200
PPR Elbow 1” 3 150
PPR Reducing bush 1” to ¾ “ 1 40
PPR TEE ¾ “ 2 80
PPR Elbow plain ¾” 2 80
PPR Female Elbow ¾ “ 3 180
Flex tubes ½ “ 2 400
GI Reducing Bush ¾” to ½ “ 3 150
GI Nipples ½ “ 3 120
Pillar Tap ½ “ 2 2000
Shower Bend 1 70
Shower head 1 200
Sub - total 4670

13
5.3 The entire drainage

Materials Quantity Cost


4” Waste pipe PVC 1 700
2” Waste Pipe PVC 4 1600
Manhole lead 1 750
Sub-total 3050

Fittings Quantity Cost


2” Magic Connectors 2 600
2” Elbows 6 420
2” Tee 1 90
4” Magic Connector 1 180
4” Elbows 2 240
Sub-total 1530
TOTAL COST 88,920
LABOUR COST 26,676
GRAND TOTAL 115,596

14
CHAPTER SIX

6.0 Working Program Bar graph showing activities for the entire installation