Lindah Project Final
Lindah Project Final
1
DECLARATION
I Lindah Ngatha hereby declare that this project is uniquely prepared by me after the
completion of two years schooling at Thika Technical Training Institute.
Signature .
Date
Signature ...
Date
i
DEDICATION
I dedicate this effort to the KNEC desk, my wonderful parents, my supervisor, and the entire team of
the Thika Technical Training Institute, who have helped me learn and have consistently served as
sources of inspiration. They contributed drive and enthusiasm to help me handle the problem that
was given to me.
ii
ACKNOWLEDGEMENT
First of all, I want to express my gratitude to the All-Powerful God for guiding me this far
and providing me with a nice life while I was learning.
I would want to thank the many individuals whose work, encouragement, and direction were
necessary for the development of this project.
I am really appreciative to my project manager, Peter Karanja, who has always provided
advice on how to gain skills for writing the project.
I also want to express my gratitude to Mr. Charles Kigen, our class instructor, who has
always given me advice on how to approach academic challenges.
I also want to express my gratitude to Mr. Gitonga and Mrs.Gitonga, my parents, for their
wise counsel and wisdom that they instilled in me over the course of my two years of
education.
TABLE OF CONTENTS
iii
DECLARATION.........................................................................................................................................i
DEDICATION...........................................................................................................................................ii
ACKNOWLEDGEMENT...........................................................................................................................iii
TABLE OF CONTENTS............................................................................................................................iv
EXECUTIVE SUMMARY...........................................................................................................................v
CHAPTER ONE........................................................................................................................................1
1.1 A complete Cold Water Supply System to feed all the Appliances............................................1
1.2 A Complete hot water supply system to feed all the appliances...............................................1
1.3 A drainage system that drain all appliances upto the first manhole..........................................2
CHAPTER TWO.......................................................................................................................................3
2.0 Using a Scale of 1:20 prepare a working drawing of cold water distribution.............................3
2.1 Using a scale of 1:20 prepare a working drawing of hot water distribution..............................4
CHAPTER THREE.....................................................................................................................................6
3.0 Using a scale of 1:20 prepare a working drawing for the drainage system................................6
3.1 Plan............................................................................................................................................6
CHAPTER FOUR......................................................................................................................................7
4.0 Estimate the quantities of materials and fittings for the following............................................7
CHAPTER FIVE......................................................................................................................................10
5.0 Estimate the quantities of materials and fittings for the following..........................................10
CHAPTER SIX
13
iv
v
EXECUTIVE SUMMARY
CHAPATER ONE
A cold-water system supply that supplies the shower, low level WC, bowl urinal, wash basin,
and bathtub.
a hot water supply system for the shower, bathtub, and washbasin.
a drainage system that collects waste and soil appliances from the shower, low-level WC,
bowl urinal, and bathtub.
CHAPTER FOUR
This section shows how much plumbing supplies and fittings are needed for the full drainage
system, including the cold and hot water distribution systems.
CHAPTER FIVE
This part provides an illustration of the going rate for the labor, cold and hot water
distribution system, drainage materials, and appliances.
CHAPTER SIX
This is a functioning program that shows activities for the complete installation in preparation.
vi
CHAPTER ONE
1.1 A complete Cold Water Supply System to feed all the Appliances
A cold-water supply system exclusively uses cold water from the storage system, which is
then piped via a 1-inch diameter to the appliances.
The water is then reduced from a 1-inch pipe to a 34-inch pipe that distributes water to the
appliance's point. Later, the pipe is reduced using a G.I. reducing bush and a hexagonal
nipple so that it can handle a 12-inch flex tube.
1.2 A Complete hot water supply system to feed all the appliances
A hot water cylinder receives water from a storage tank via a 1-inch pipe, where it enters, and
a 34-inch pipe, where it exits, supplying some items like a washbasin, bathtub, and shower.
1.3 A drainage system that drain all appliances upto the first manhole
All waste appliances are collected in a drainage system, which runs from the appliances
to the manhole as illustrated.
2
3
CHAPTER TWO
2.0.1 Plan
2.0.2 Elevation
4
2.0.3 Isometric pipe layout
2.1 Using a scale of 1:20 prepare a working drawing of hot water distribution
2.1.1 Plan
2.1.2 Elevation
5
2.2.3 Isometric pipe layout
6
CHAPTER THREE
3.0 Using a scale of 1:20 prepare a working drawing for the drainage system
3.1 Plan
7
3.2 Isometric Pipe Layout
8
CHAPTER FOUR
4.0 Estimate the quantities of materials and fittings for the following
Materials Quantity
3000l Storage tank 1
¾ PPR Pipes 4
1 Pipes 2
Wash hand basin 1
Low level W.C 1
Bowl Urinal 1
Bath tub 1
Fittings Quantity
Gate valve 1 1
PPR Elbow 1 3
PPR Reducing bush 1 to ¾ 1
PPR TEE ¾ 4
PPR Female Elbow ¾ 5
PPR Elbow plain ¾ 3
Flex tubes ½ 4
GI Reducing Bush ¾ to ½ 5
GI Nipples ½ 5
Pillar Tap ½ 2
Shower Bend 1
Shower head 1
9
4.2 Hot Water Distribution System
Materials Quantity
3000l Storage tank 1
¾ PPR Pipes 4
1 PPR Pipes 1
Wash hand basin 1
Bath tub 1
Hot water cylinder 1
Fittings Quantity
Gate valve 1 1
PPR Elbow 1 3
PPR Reducing bush 1 to ¾ 1
PPR TEE ¾ 2
PPR Elbow plain ¾ 2
PPR Female Elbow ¾ 3
Flex tubes ½ 2
GI Reducing Bush ¾ to ½ 3
GI Nipples ½ 3
Pillar Tap ½ 2
Shower Bend 1
Shower head 1
10
4.3 The entire drainage
Materials Quantity
4 Waste pipe PVC 1
2 Waste Pipe PVC 4
Manhole lead 1
Fittings Quantity
2 Magic Connectors 2
2 Elbows 6
2 Tee 1
4 Magic Connector 1
4 Elbows 2
11
CHAPTER FIVE
5.0 Estimate the quantities of materials and fittings for the following
12
5.2 Hot Water Distribution System
13
5.3 The entire drainage
14
CHAPTER SIX
6.0 Working Program Bar graph showing activities for the entire installation
15
REFEREES
16