Steel Bur
Steel Bur
KONTRAK NO : JKR/SEL/253/2002
MATERIAL
1 Supply I-Beam
Unloading
3 PLANT
MENYAMBUNG SEMULA DAN MENYIAPKAN KERJA-KERJA TERBENGKALAI DI TAPAK MASJID SEKSYEN 19, SHA
SELANGOR DARUL EHSAN
KONTRAK NO : JKR/SEL/253/2002
Cement grouting
add:
15% @ RM 215.00
RM RM RM
4,968.00
30.00
320.00
480.00
830.00
5,798.00
800.00
400.00
6,998.00
1,049.70
8,047.70
14.58
page 1
Unit RM RM
No 215.00
32.25
247.25
page 2
BALAI POLIS USJ 8
BUILT-UP RATES
BUILT-UP RATE
Materials
225 x 225 x 10 mm thick plate BLDG/5/3C Kg 3.97
Sub-Total
Total
Materials
120mm x 120mm x 6mm Thick MS plate BLDG/5/3C Kg 0.68
Sub-Total
6.50 25.83
45.00 22.50
70.00 35.00
Sub-Total 83.33
12.50
95.83
Rate Amount
6.50 4.41
45.00 5.63
70.00 8.75
Sub-Total 18.78
2.82
21.60
Supply and install galvanised mild steel cat ladder in manhole and sump
RM RM
A MATERIAL
Cat ladder 3700mm high as per supplier quotation 650.00
B LABOUR
Installation
1 general worker @ RM 5.63/hr @ 2.0hr 11.26
661.26
C MISCELLANEOUS
Allow 10% for miscellaneous 66.13
727.39
D PROFIT & OVERHEAD
Allow 15% profit and overhead 109.11
836.49
BALAI POLIS USJ 8
Built-up Rates
1) RECTRACTABLE LADDERS
Materials
Supply,deliver and install 1,310.00
(Refer to attached quotation)
Add
Overhead + Profit 15% 196.50
1,506.50
APK39/BUR/1
CADANGAN MEROBOH DAN MEMBINA SEMULA MASJID NURUL IHSAN, DI ATAS LOT 18645 &
11239 DI JALAN SERI CHERAS 6, TAMAN SERI CHERAS, MUKIM CHERAS, DAERAH HULU
LANGAT, SELANGOR DARUL EHSAN.
Supply and install mild steel gate overall 1200 mm x 1000 mm high comprising of all
ironmongery and fixing to wall etc. as per manufacturer's instruction and S.O approval
RM
Main Gates
Pro-Rate
Original 4.50m x 1.80m = RM 3,264.00
1m2 = RM402.96
add
10% deco. Mortice RM40.30
cost/m2 RM443.26
New rate
6.0 m x 1.8m 10.80 m2
Secondary gate
5.0m x 1.8m 9.00 m2
Supply and fix natural anodised aluminium casement window complete with all fitting and ironmonge
Add
Labour for uploading
0.05hr @ RM 50.00/day
Joiner
1 hr @ RM55.00 / day
Add
Total cost / No
Say,
plete with all fitting and ironmongery
100.80 100.80
0.31
6.25
107.36
16.10
123.47
123.00
ACS ministrip ceiling panel in high tensile steel with Zinclume and colourbond
coated strips of module of size 75mm centre
Materials:
Waste 5% 3.36
95.65
RM RM
A MATERIAL
Handrailing (As per supplier quotation) 83.50
B LABOUR
Unloading
2 general worker @ RM 5.63/hr @ 0.16hr 1.80
Installation
2 general worker @ RM 5.63/hr @ 1.0hr 11.26
13.06
96.56
C MISCELLANEOUS
Allow 10% for miscellaneous 9.66
106.22
D PROFIT & OVERHEAD
Allow 15% profit and overhead 15.93
122.15
BREAK UP RATE
1 Materials
- 75mm Dia. S/S pipe 1.65 75.00 123.75
- 50mm Dia. S/S pipe 6.00 58.00 348.00
- base plate 3.00 30.00 90.00
561.75
Add 5% wastage 28.09
589.84
2 Tools & Equipment
- Cutter 1.00 10.00 10.00
3 Labour
- 3 skilled workers 3.00 80.00 240.00
839.84
Add 15% OHP 125.98
Cost for 1.65m 965.82
Cost/m 585.34
BREAK UP RATE
1 Materials
- 75mm Dia. S/S pipe 12.460 75.00 934.50
- 50mm Dia. S/S pipe 19.46 58.00 1,128.68
base plate 7.00 30.00 210.00
2,273.18
Add 5% wastage 113.66
2,386.84
2 Tools & Equipment
- Cutter 1.00 10.00 10.00
3 Labour
- 3 skilled workers 3.00 80.00 240.00
2,636.84
Add 15% OHP 395.53
Cost for 12.46m 3,032.36
Cost/m 243.37
CADANGAN MEROBOH DAN MEMBINA SEMULA MASJID NURUL IHSAN, DI ATAS LOT 18645 &
11239 DI JALAN SERI CHERAS 6, TAMAN SERI CHERAS, MUKIM CHERAS, DAERAH HULU
LANGAT, SELANGOR DARUL EHSAN.
RM
SAY, 5,869.00
area = 18.00 m2
CADANGAN MEROBOH DAN MEMBINA SEMULA MASJID NURUL EHSAN, DI ATAS LOT 18645 &
11239 DI JALAN SERI CHERAS 6, TAMAN SERI CHERAS, MUKIM CHERAS, DAERAH HULU
LANGAT, SELANGOR DARUL EHSAN.
Supply and install cast iron alloy grille with Islamic pattern
Say, RM600.00
arm
35
BALAI POLIS USJ8
Built-up Rate
Supply and install approved anti-vermin wire mesh or chicken nett in 25mm x 25mm centres complete with RHS
framing 50mm x 100mm fixing and jointing, welded including all finish and all as per Architect's and S.O's
approval.
3 Labour
a. 1 Welder $ 75.00 x 1man x 0.5 hr (BQ-Labour) 4.69 /M2
b. 1 General Worker $ 60.00 x 1man x 0.5 hr (BQ-Labour) 3.75 /M2
c. Supervisor $ 200.00 x 1man x 0.25 hr (Fair Rate) 6.25 /M2
Supply and install approved 'Anti Climb Mesh' fixed to window grille complete with 50mm x 100mm
RHS framing at 1200mm centres and all as per manufacturer's details and specification (window)
Description RM
3 Labour
a. 1 Welder $ 75.00 x 1man x 0.5 hr (BQ-Labour) 4.69 /M2
b. 1 General Worker $ 60.00 x 1man x 0.5 hr (BQ-Labour) 3.75 /M2
c. 1 Supervisor $ 200.00 x 1man x 0.5 hr (Fair Rate) 12.50 /M2
Supply and install approved 'Anti Climb Mesh' fixed to window grille complete with 50mm x 100mm
RHS framing at 1200mm centres and all as per manufacturer's details and specification (ceiling)
Description RM
3 Labour
a. 1 Welder $ 75.00 x 1man x 0.5 hr (BQ-Labour) 4.69 /M2
b. 1 General Worker $ 60.00 x 1man x 0.5 hr (BQ-Labour) 3.75 /M2
c. 1 Supervisor $ 200.00 x 1man x 0.5 hr (Fair Rate) 12.50 /M2
Supply and install approved 'Anti Climb Mesh' fixed to window grille complete with 50mm x 100mm
RHS framing at 1200mm centres and all as per manufacturer's details and specification (ceiling)
Description RM
3 Labour
a. 1 Welder $ 75.00 x 1man x 0.5 hr (BQ-Labour) 4.69 /M2
b. 1 General Worker $ 60.00 x 1man x 0.5 hr (BQ-Labour) 3.75 /M2
c. 1 Supervisor $ 200.00 x 1man x 0.5 hr (Fair Rate) 12.50 /M2