J u n e 2 0 2 2
ze b 1 7 0 6 | re v - B
Dibden Lane, Alderton
design and access statement
contents 3.0 design 20
1.0 introduction 4 3.1 pedestrian connections 21
1.1 scope and content 4 3.2 streets 22
1.2 professional team 5 3.3 landscape 23
3.4 topography 24
2.0 site 7 3.5 development parcels 25
3.6 placemaking 26
2.1 methodology 7 3.7 use and amount 27
2.2 site location 8 3.8 layout and scale 27
2.3 existing site 9 3.9 materials + details 28
2.4 historic context 10 3.10 landscaping + public realm 29
2.5 scale 11 3.11 energy statement 30
2.6 materials + details 11 3.12 parking + cycles 32
2.7 landscape + public realm 13 3.13 refuse 32
2.8 transport + movement 16 3.14 building for a healthy life 33
2.9 site analysis 18
2.10 planning context 19 4.0 access 34
4.1 site access 35
4.2 dwelling access 36
© Zebra Architects Ltd.
All maps, plans, drawings and images are not to scale, and are copyright of Zebra Architects
Ltd unless otherwise stated.
OS maps are used under licence no. 100020449
1.0 in trod uction
1. View along Dibden Lane(Google Earth)
1.0 introduction
1.1 scope and content
This Design and Access Statement (DAS) has been prepared
by Zebra Architects on behalf of the applicants Hamelin
1
Partnership to accompany a detailed Planning Application
for the development at Dibden lane, Alderton. The
application is for a 26 unit residential scheme which is a
rural exception site.
The purpose of this document is to set out how Dibden
Lane can be developed to create a high quality, sustainable
scheme, and to identify the factors which have influenced
the development strategy for the site. It illustrates how the
site analysis, research, survey work and consultations have
informed the final proposals.
It should be read in conjunction with the drawings and
reports that form the detailed planning application.
design and access statement • Dibden Lane Alderton 4
1. Aerial view of site in Dibden Lane, Alderton (Google maps)
1.0 introduction
1.2 professional team
1
The process of discussion and design development has
included input from the following team:
client hamelin partnership
architects zebra architects
landscape architects zebra landscape architects
ecology zebra ecology
arboriculture zebra trees
FRA and drainage bannersgate
transport consultant magna
ground investigation IGE consulting
topographical chilcote
heritage orion
archaeological orion
air quality redmore environmental
housing needs cotesbury
planning statement mcloughlin planning
design and access statement • Dibden Lane Alderton 5
2.0 site
2.0 site
2.1 methodology
It is important as designers that each site is designed based
upon its merits, constraints and opportunities. This will
begin with a site visit both of the site and viewed from
within and then also from
beyond the site looking towards. This is then
interpreted into a constraints diagram which
graphically identifies the site in its context, existing
vegetation, topography, storey heights, listed buildings,
conservation areas, views and focal points, vehicular and
pedestrian movements and infrastructure. The brief is then
created in tandem with the constraints plan which is used to
stress test along the design evolution of the scheme working
alongside the 12 pillars of Building for Health.
The design process will form a number of
opportunities from the constraints plan. This will first and
foremost identify and promote the relationship with the
development and the existing built form and community -
the success of a sense of place is to
ensure integration with existing as opposed to
segregation. This can be through shared facilities (open
space and recreation) brought together through new
pedestrian linkage. Privacy, scale and overlooking in
plotting is key to ensure that the existing built form is not
compromised. Finally a good and thorough
understanding of the townscape and what is
integral to the character of the area through
townscape studies, material and palette appreciation,
form and embellishment or simplicity of streetscapes. All
of this during the design process will inform and create a
harmonious development that will sit within the existing
built form without being incongruous.
design and access statement • Dibden Lane Alderton 7
1. Location of Gloucestershire (contains Ordnance Survey data © Crown copyright and database right)
2. Location of Tewkesbury borough(contains Ordnance Survey data © Crown copyright and database
right and GCC imagery)
3. Aerial view of Site in Dibden Lane , Alderton, Tewkesbury (map data Goggle ©2020)
2.2 site location
1 2
The site is located to the east of Tewkesbury, a town situated
in Gloucestershire.
The site sits along Dibden Lane which connects to the small
village of Alderton, a small village between Tewkesbury (8
miles to the west),Winchcombe (4 miles to the south east),
and Bishops Cleeve (7 miles to the south west).
The site is located adjacent but not within the Cotswold’s
AONB. However the site is influenced by the AONB and the
LVA is critical to the development of the proposals.
design and access statement • Dibden Lane Alderton 8
1. View of approach to site from Dibden Lane (map data Google ©2022)
2.0 site 2. View of site from Dibden Lane (map data Google ©2022)
3. View of site from Dibden Lane (map data Google ©2022)
4. View towards the site from the village (map data Google ©2022)
5. Photo location map
2.3 existing site
1 2
The site is currently vacant grassland which slopes
approximately 4.8m north east to south west with an area of
20920m 2.
The site is situated on an area of rough grassland that rises
gently in a north westerly direction up to Dibden Lane. With
its frontage onto Dibden Lane the site forms part of the
eastern gateway approach into Alderton. Aside from Dibden
Lane to the north the site is bound by
a. to the south, open countryside, an agricultural field
extending south to a watercourse running east west.
b. to the east, open countryside, an agricultural field
extending east to a vegetated field boundary.
c. to the north west, an area of well maintained grass
land and intermittent tree planting.
d. to the west, the boundary to properties in Alderton.
e. to the south west, a hedgerow field boundary.
5 3 4
design and access statement • Dibden Lane Alderton 9
1. 19 century OS map of site (Map)
2.0 site
2.4 historic context
1
The adjacent 19 century OS data shows the site to be
unoccupied. Subsequent 0S Mapping shows site boundary
being undeveloped to the present.
The first record of a settlement at Alderton was in 1059 and
later in the 1086 Domesday book which had Alderton as a
10 household small settlement.
it is believed that the site has had an agricultural use since
the early settlement although there is no evidence of ridge
and furrow on the site.
In 1811 the field is referred to as Thistly Field and is a
much larger field than is now seen. The field in its current
form is shown in an 1884 OS map with some tree planting
presumably to enhance the surroundings of the Old Rectory
(Grade 2 listed asset). In 1903 the field is indicated as a park
or ornamental ground.
By 1924 the site is shown to be back into agricultural use
and is unchanged since then.
Refer to the heritage report as provided by Orion.
design and access statement • Dibden Lane Alderton 10
1. Gretton View
2.0 site 2. New development fronting Beckford Road
3. Bungalows at Brookside
4. Houses on Orchard Road
2.5 scale
1 2
Whilst Alderton is not part of a conservation area, due
reference needs to be made to the development with its
regard to typology, scale, palette and grain. Given the rural
nature of this part of the borough, built form around the site
is generally between one and two storeys in height. Later
developments in the village are of 1.5 and 2 storey in nature
(see figures 1 and 2)
2.6 materials + details
The palette to Alderton is varied and depicts the growth
of the village and hierarchy of buildings through its
development. Larger properties such as the church of St
Margaret and Manor Farm are stone built. Later properties
characterised by brick in timber frame, stone and clay roof
tiles and thatch. Later buildings have pebbledash render,
brick and reconstituted stone. The dwellings surrounding the
site are predominantly built in red brick, render or Cotswold 3 4
stone. This informed the choices of materials in the
scheme. Palette of materials is very much natural in identity
with Cotswold honey render, buff and red brickwork and
clay roof tiles.
design and access statement • Dibden Lane Alderton 11
5. School Road (Google image)
6. Old Rectory (from the site)
7. Cambridge Square 5 6
8. Beckford Road
7 8
design and access statement • Dibden Lane Alderton 12
1. Settlement approach from the west.
2.0 site 2. Settlement approach from the east
3. St Margaret’s Church
4. Open landscapes around site boundary
2.7 landscape + public realm
1 2
The village’s main street comprises Dibden Lane, School
Road and Beckford Road and runs east west through the
centre of the village. Leading off this are a series of lanes
and cul-de-sacs at key T and Y junctions. The nodal character
of these junctions are both regular (Brookside) and irregular
(Church Road), as defined in the Government’s guidance
document Manual for Streets. Each reflecting the historic
role and function they had, the balance in terms of place
and movement. In addition to these established junctions
on the main street there are a number of semi-private
drives providing access to a small number of dwellings.
Alderton village has a rural approach from the east and
western approaches with established hedgerows and tree
lines. There is a clear distinction between settlement and
boundary (see figure 1).
Please see the landscape supporting evidence with the
application.
3 4
design and access statement • Dibden Lane Alderton 13
2.0 site
1. Alderton primary School
2. Alderton village Hall
The urban grain within Alderton shows organic growth 3. Local shop / post office
fronting the principle route through the village. Central
to the village in the key node where School Road meets
Beckford Road, the built form is tight to the highway and 1
then as the highway approaches the settlement edge
landscape buffers are introduced between highway and 2
built form. Leading off the main thoroughfare there are a
series of lanes and cul de sacs. New developments within
the village comprising terraced, semi detached dwellings of 3
a more suburban nature in its grain .
There are a number of facilities within Alderton, some
of which are shown on the figure. The site is 400m from
Alderton primary school on school road and Alderton village
hall. A local shop / post office is located on church road.
The grain is linear to the through road with later
developments emanating from this route. Any new
developments should look at fronting Dibden Lane and
views out to the countryside.
design and access statement • Dibden Lane Alderton 14
2.0 site
Within Alderton there are 18 heritage assets - please refer
to the heritage statement as part of the application. The
Rectory is at the west of the site and the listing is as follows:
The Old Rectory
Grade II
List 1153873
Former rectory, now a house and two flats. Built c1840.
Brick mostly covered with incised render; slate roof with
brick stacks with limestone cappings. Rectangular plan
with two wings at right angles to the rear. Two storeys.
Symmetrical 3-windowed entrance front with a large flat-
roofed porch: tripartite sash with a moulded architrave to
the left of the porch; 12-pane sash with moulded architrave
to the right; three 12-pane sashes to the first floor with
dressed stone lintels; band between the two floors. Large
flat-roofed porch with plank door up 3 stone steps and large
fanlight within a moulded architrave; pilasters either side of
the doorway and at the corners of the porch. Wing to the
left of the main body: two blocked round-headed windows
to the ground floor with moulded architraves on brackets;
two 12-pane sashes to the first floor; band between floors.
South-facing elevation from left to right: double glass doors
within a moulded architrave; large 12-pane sash within a
dressed stone surround; rectangular ashlar-built bay with
round-headed windows and brackets at impost level. Three
12-pane sashes to the first floor. Moulded stone eaves
cornice. Hipped roofing with axial stacks. Wide stepped
stone standing on the west and south sides. Interior not
inspected.
design and access statement • Dibden Lane Alderton 15
2.0 site
2.8 transport + movement
The M5 is the main road network to the west of the site with
Junction 9 approximately 8km from the site. The A46 links the
B4077 to the M5 and the railway station at Aschurch. The
railway has frequent links to the south west and Midlands.
Main road network
Secondary road network
Motorway
Railway
design and access statement • Dibden Lane Alderton 16
1. local transport routes and PROW’s
2.0 site
2.8 (continued) transport + movement
The site is bounded to the north by Dibden Land which is also
1
the route for the Winchcombe Way. This through route is also
the route for the bus service operated by Pulhams between
Chipping Campden and Cheltenham. Proposed access will be
from Dibden Lane. Refer to the transport statement which
forms part of the submission.
The approximate walking distances to Alderton’s public
services from the site are as follows:
• Alderton Village Hall – 300 metres
• Oak Hill Primary School – 400 metres
• Gardners Arms Pub – 700 metres
• Alderton Post Office – 500 metres
• Bus Stop – 200 metres (Dibden Lane)
Through road
bus stop
PROW inc. Winchcombe
Way
design and access statement • Dibden Lane Alderton 17
2.0 site
2.9 site analysis
Listed buildings
Site boundary 1
Existing boundary hedges/
trees
Contours
highway
PROW
Influence zone from listed
structure
Careful analysis of the site
conditions can be seen in the
adjacent diagram.
The site is within Flood Zone 1 and
outside of the Cotswold’s AONB
design and access statement • Dibden Lane Alderton 18
1. National Planning Policy Framework
2.0 site 2 Manual for Streets 2
3 Cotswold AONB map
4 Diagram from National Design Guide
2.10 planning context
1 2
Please refer to the Planning Statement submitted with the
planning application for a full description of the planning
context by McLoughlin Planning Ltd
The application is for the erection of a 100% affordable
rural exception scheme of 26 dwellings. a housing needs
statement is included as part of the application and governs
the mix provided.
Please refer to the planning statement regarding the
previous applications on the site.
Material planning considerations for the application are the
Joint Core Strategy, Tewkesbury Borough local plan, Alderton
Neighbourhood Plan and NPPF and associaated guidance.
It has been established for some time that Tewkesbury
Borough Council is unable to demonstrate a 5-year housing
land supply, with recent planning committee reports 3 4
confirming that the Council has a 3.83-year housing land
supply. This is a significant material consideration.
design and access statement • Dibden Lane Alderton 19
3 design
3.0 design
3.1 pedestrian connections
Following the 12 pillars of BfH, great importance is placed 1
2
upon pedestrian connectivity of the site. This can open up
recreation from the locality into the site, access infrastructure
from within the site following key desire lines and accessing
local amenity.
forming a new pedestrian access at A provides
access from within the site to Winchcombe
Way
forming a new pedestrian access at B provides
access from within the site to Alderton village,
infrastructure and public transport links
forming a new pedestrian access at C provides
access from within the site to PROW AAL7
(Winchcombe Way)
design and access statement • Dibden Lane Alderton 21
3.2 streets
Whilst single sided roads are not “efficent” in terms of
development , it is considered important in rural locations
such as this that street frontage opens out onto countryside or
open space. This has been used to effect on the new housing
development on beckford Road where a rural vernacular has
been adopted offering a softer edge of village as built form
transitions to countryside.
forming a single point of access onto Dibden
Lane with compliant visibility splays
streets emanating from single points of access
with strong frontage forming perimeter
block development. This will form frontage
to open space as opposed to back gardens
and provides an excellent response to activity
at street level, focal points, visibility and
navigability across the site.
design and access statement • Dibden Lane Alderton 22
3.3 landscape
Having a soft edge between built form and countryside is
a key parameter in making a successful sense of place. The
location and outlook from the Rectory must be considered
and punctuates the needs for a green buffer. The natural
extension of green space along all edges is also a driver
for the success of how the development sits within its
environment
There are distinct areas of open space which
provide excellent relationships between the rural
nature of the outlook and the residents. This enables
residents of both the village and the development to have
a positive interaction with open space which is vital for
belonging and a solid sense of well-being and a key aspect
of BfH
reinforce existing landscaping with native
species planting
create green buffer zone to proposed built
environment. Built form frontage to overlook
buffer zone to enhance residents relationship
with amenity space in line with the 12 pillars
of BfH
design and access statement • Dibden Lane Alderton 23
3.4 topography
The site is currently vacant grassland which slopes
approximately 4.8m north east to south west with an area of
20920m 2.
The topography offers an opportunity for a sustainable
drainage solution which will also give an opportunity for bio
diversity nett gain.
location of SuDS pond
design and access statement • Dibden Lane Alderton 24
3.5 development parcels
The development perimeter block parcels are formed within
the green buffer area created as a transition between open
countryside and the built form. This is picked up from other
developments within the village and is a characterised
rural aesthetic. As edge of settlement the scale of the
development is single storey so as to avoid landscape impact
assessment and provides a softer entry point to the village
from the east. The development will also remain subservient
to the main characteristic of Alderton and impact on
heritage assets.
Materially form will follow the palette of Alderton being
brick , render and clay tile
development parcels
active outlook
design and access statement • Dibden Lane Alderton 25
3.6 placemaking
Simply put, Placemaking is the process of creating quality
places that people want to live, work and play in. As
discussed in the design approach section, a place must not
segregate with its environment but instead integrate both
visually and physically and ensure that the development
is not incongruous. This design has started with the
connectivity of green space to the existing green space to all
boundaries. This has a number of positive parts - this
enhances the green as a visible viewpoint and
connection between the village and surroundings and
the site; it creates areas of public open space that can be
enjoyed by all; it creates pedestrian links from and to the
development and links to the current
infrastructure and amenity within the village.
There are distinct areas of open space which
provides excellent relationships between the rural
nature of the outlook and the residents. This enables
residents of both the village and the development to have
a positive interaction with open space which is vital for
belonging and a solid sense of well-being.
Sustainability utilises the existing topography and
orientation. The SuDS pond is located at the lowest point
of the site. Positive placemaking is also created through
positive placement of building blocks. encouraging positive
streetscenes, focal points and corner turning units. This not
only avoids blank gables but increases the connectivity and
navigation of residents to the street and provides a good
level of natural surveillance.
design and access statement • Dibden Lane Alderton 26
1. Proposed site plan (Zebra Architects)
3.0 design
3.7 Use + Amount
1
The proposal is for 26 new build residential units as part of
a rural exception scheme. The indicative site masterplan sets
out a mix of 1, 2, 3 and 4 bed houses. The proposed mix of
dwellings is as follows:
4no 1 Bed House
10no 2 Bed House
10no 3 Bed House
2no 4 Bed House
3.8 layout + scale
Taking reference from the surrounding context and constraints
the scale of the development is single storey in nature with 2
units being 1.5 storey fronting Dibden lane. The development
has a buffer zone surrounding the development parcel taking
respect of open countryside to the north, east and south and
built form including The Rectory to the west. Active frontage
maximizes natural surveillance along new pedestrian linkage to
the north and south west
design and access statement • Dibden Lane Alderton 27
1. Buff brick
3.0 design 2. red brick
3. buff render
4. roof tiles
3.9 materials + details
1 2
The proposed material palette has been largely influenced by
that used on the adjacent Cotswold palette.
Buff brick , Red brick and buff render commonly found in
neighboring residential areas, are the main external wall
materials applied throughout the development. Together, these
materials help the development to respect the neighboring
dwellings whilst maintaining a contemporary appearance.
3 4
design and access statement • Dibden Lane Alderton 28
1. Proposed Site plan showing swale (Zebra Architects)
3.0 design
3.10 landscaping + public realm
1
The proposal incorporate a generous amount of public open
space throughout the site to create a visually attractive place
to live and create a development which sits comfortably in
its context.
All boundaries to the developable area form a green buffer as
a transition between built form and open countryside.
With the exception of the existing northern and western
boundary which has existing established planting, the scheme
will provide new boundaries of native species planting. There
is currently no planting within the site boundary and this
provides an opportunity for increased bio-diversity nett gain
within the overall landscaping proposal.
design and access statement • Dibden Lane Alderton 29
3.0 design
3.11 energy statement 3.11.2 Energy + Carbon Emissions
The development aims to deliver new buildings which
3.11.1 intoduction reduce energy demand and carbon emissions through a
range of targeted passive and active measures suited to the
This Sustainability Statement has been prepared to specific energy needs of the intended occupant.
summarise the sustainability strategy for the proposed
development at Dibden Lane, Alderton Measures incorporated into the buildings to reduce energy
demand include:
Tewkesbury Borough supports high quality, energy efficient, • Optimising passive solar gain;
sustainable development and is flexible in its approach to • Prioritising natural daylighting;
the application of policy, recognising that different buildings • A Fabric First approach to design and construction;
require different solutions. • Energy efficient lighting and controls;
With the strategy set out in this statement, the proposed Overall the development aims to deliver new buildings
development clearly supports both national and local policy which at minimum meet the 2021 Building Regulations.
and delivers sustainable new buildings which will provide
additional economic, social and environmental benefits to 3.11.3 Sustainable Construction
the local and wider area.
The development at Dibden Lane, Alderton will seek to
The key sustainability benefits of the development are adopt a range of sustainable construction techniques
considered under the following headings which reflect local including prioritising sustainable materials, minimising waste
sustainability priorities. generation and maximising recycling.
3.11.4 Water Efficiency + Conservation
The development will aim to reduce water use and increase
water efficiency through construction and occupation of the
new buildings.
During construction, site water use will be monitored and
suitable monitoring and targeting measures put in place to
encourage efficient water use.
To reduce occupational water use specific water strategies
for the project will be developed that recognise the varying
water demands and usage pattens.
design and access statement • Dibden Lane Alderton 30
3.11.8 Flood Risk and Sustainable Drainage
3.11.5 Sustainable Waste Management
The development is located in an area of low flood risk
Recycling will be encouraged during the occupation of the and incorporates a surface water management strategy to
through the installation of segregated waste bins for each reduce surface water discharge from the site. The strategy
of the dwellings / units / buildings meeting the local council aims to reduce overall surface water runoff by incorporating
guidance and facilities. Sustainable Drainage Systems taking into account a 1 in
100 year storm event including a 30% increase for climate
3 . 1 1 . 6 S u s t a i n a b l e Tr a n s p o r t change. Please refer to the drainage strategy as produced by
Bannersgate
In line with local policies, the development is designed to
promote sustainable transport and travel options. Parking
spaces are designed to local council standards and and each
dwelling has enough space within their curtilage to be able
to accommodate cycle storage enabling the use of bicycles
The project is designed to maximise pedestrian access, with
links designed to the wider footpath network to allow for
safe and accessible movement by foot.
3.11.7 Health and Well Being
The proposed new development will aim to provide a
comfortable, healthy and functional environment for its
residents and those already living in the local area. There
will be many direct Health benefits from the proposals not
least of which will be increased exercise through supporting
increased walking and cycling.
It is also anticipated that by improving access to the town
centre there will be a boost to the local economy, the
benefits of which could be reinvested in local services.
design and access statement • Dibden Lane Alderton 31
1. Proposed site plan showing alloted parking spaces (Zebra Architects)
3.0 design
3.12 parking + cycles
1
The proposed parking provision meets the requirements.
The proposed plan gives each plot a private garden where cycle
storage can be added by tenants.
3.13 refuse
Refuse bins will be stored within private gardens, with
appropriate access for kerbside collection.
design and access statement • Dibden Lane Alderton 32
3.0 design
3.14 building for a healthy life
Building for a Healthy Life (BHL) is the new name for Building
for Life 12. This is a 12 point structure that is used from
the start of the design process and considers key items
pertaining to the sense of place and how residents use the
space.
A BfH initial analysis has been undertaken on the design
at Dibden Lane, Alderton and has followed the design
approach and the 12 stages to identify key parameters which
are important in creating a well considered environment to
live and be an extension to the existing village.
A traffic light system of red, amber and green is used
together with explanatory notes of how the grading has
been achieved.
The green items for the scheme as currently proposed is
73%;
amber items which will be addressed as
working towards a green during the technical proces
equates to 13%;
red items which relate to items which are contrary to
council policy relating to highways are 2% of the total.
design and access statement • Dibden Lane Alderton 33
4 access
1. Proposed entrance access junctions (Zebra Architects)
4.0 access
4.1 site access
1
In accordance with relevant planning and development
policy, the development aims to meet the highest standards
of access and inclusion. The indicative masterplan considers
the needs of disabled and older people, children, carers of
young children and others often excluded.
There is a singular point of vehicular access from Dibden
Lane (see transport statement) and a pedestrian access
onto Dibden lane with access to the village and the facilities
contained therein. A further new pedestrian access is planned
to the south western corner which accesses the Winchcombe
Way
design and access statement • Dibden Lane Alderton 35
1. House Type C Proposed Plan (Zebra Architects)
4.0 access
4.2 dwelling access
1
All the houses are designed with inclusive access in mind.
All properties are bungalows with 2 being 1.5 storey with
ground floor bedroom. kitchen kitchen
lounge lounge
4.2.1 Approach/Entrance
ZLAD 414
The approach to each dwelling is to be designed as level or Dibden Lane
Alderton
gently sloping. All entrances are envisaged to be illuminated, hall hall PL024
have level access over the threshold, suitable door widths House Type C
plots 11,12
bedroom 01 bedroom 01
having more than sufficient weather protection and a level bedroom 02 bedroom 02
date October 2022
external landing to all main entrance doors. status planning
rev B
4.2.2 Circulation
63sqm - 2B4P
House layouts are envisaged to have generous circulation
and carefully considered room arrangements. This creates
3
a simple and contemporary solution rather than being an
afterthought.
9 6 6 9
7
4.2.3 Sanitary Accommodation 2 1 1 1
7 Material Schedule
5 5 5 1. white render
2. red brick
3. roof tiles
All dwellings are to have an entrance level accessible W/C (in 4.
5.
soldier course head
reconstituted stone still
6. white uPVC doors/windows
accordance with Part M). 7.
8.
black rwp
GRP dormer
9. composite door
N scale 1 : 100 @ A3
0 1 2 3
zebra architects ltd. is part of zebra group consulting ltd.
7 6 6 7
2 2 1
Ordnance Survey (c) Crown Copyright. All rights reserved. Licence number
100022432
Copyright is reserved by Zebra Architects and the drawing is issued on the
condition that it is not copied either wholly or in part without first obtaining
written consent from them. Do not scale from this drawing, figured dimensions
only to be used. All dimensions to be checked on site before commencement
of any work, shop drawings or the ordering of materials. This drawing is to be
read in conjunction with appropriate consultant engineers drawings,
schedules, specification and manufacturer's information.
design and access statement • Dibden Lane Alderton 36
30 st georges square
worcester
WR1 1HX