Dev Num1 Windev
Dev Num1 Windev
7 Updates
DIMOMAINT
CONTENTS
1. PM .............................................................................................................................................. 3
Rescheduling PMs when switching to Completed status (12301) .......................................................................... 3
The WO generated retrieves the value of the asset’s current meter (13920) ........................................................ 5
2. WR .............................................................................................................................................. 5
New WR free status .............................................................................................................................................. 5
When a WO switches to In progress, the WR switches to the status equivalent to sent (DMA) ............................ 6
3. WO .............................................................................................................................................. 6
The user only sees work in which they are involved (12845) ................................................................................. 6
Set the actual start date when switching to the ‘In progress’ status (3324) ........................................................... 7
4. Fixes ............................................................................................................................................ 7
Page 2/7
DIMOMAINT
1. PM
If one chooses ‘Reschedule the PM if a WO is Completed (or equivalent)’, rescheduling will take place
when the WO is switched to the following statuses: Completed, Completed (equivalent), Closed and
Closed (equivalent) and the PM will be rescheduled from the actual end date.
1- Never reschedule: When the WO is closed (or switched to Completed status), the PM will not be
rescheduled.
2- Always reschedule: When the WO is closed (or switched to Completed status), the PM will always
be rescheduled.
3- Enquire whether to reschedule or not: When the WO is closed (or switched to Completed status),
the user will be asked whether they want to reschedule the PM or not.
When changing to 7.7, this setting will be set as Never reschedule if Reschedule the PM on WO closing is
not checked, and with Enquire whether to reschedule or not, otherwise. This setting will also be set in the
same way on all the existing PMs.
The setting on the PM form prevails over the setting on the company form.
When creating a new PM, the setting Reschedule the PM on WO closing will be set with the value of the
company form.
Document name: V7.7 Updates
Page 3/7
DIMOMAINT
It is also possible to simply modify the value of this setting across all PMs.
To do so, on the company form, PM settings, you must select the option you desire then click Apply to all
PMs. A confirmation message will be displayed:
Page 4/7
DIMOMAINT
When a PM is triggered, the WOs will have their planned start time set to: 15:10.
If the setting is blank then the time of WOs generated will be 00:00.
This setting prevails over the Define the start time of a WO setting as the time created (Company
Form/MMaint.ini).
If the setting is checked, on a WO from a PM you will see the current value of the asset’s meter.
If the setting is not checked on a WO from a PM, you will see the value of the PM’s trigger meter.
2. WR
Page 5/7
DIMOMAINT
If a WO from a WR switches to the status chosen in the dropdown list, then the WR switches to the status
configured.
You can choose the following WO statuses: To do and its equivalent, In progress and its equivalent, and
the free WO statuses. You can choose the following WR status: free status equivalent to sent.
3. WO
The user only sees work in which they are involved (12845)
The impact of the setting “The user only sees work in which they are involved” has been modified to make
it more comprehensible for the users concerned.
This setting previously reduced access to “forbidden” WOs, but from now on, WOs are no longer visible in
the different lists.
A user who has this setting enabled can only see WOs in which they are either a technician or a supplier.
This setting affects the different WO lists available (on the asset form, the part form, the order form, the
schedule and the workload schedule). Note that on the WR form, for WOs generated, all the WOs are
visible but access is restricted.
Page 6/7
DIMOMAINT
Set the actual start date when switching to the ‘In progress’ status
(3324)
A new setting in the company form – WO Settings tab, enables you to set the actual start date at certain
status changes.
When the setting is checked, the actual start date will be updated when switching a WO to To do or
equivalent in the following statuses: in progress or equivalent, completed or equivalent, closed or
equivalent.
4. Fixes
• 14470: The archive cost centres tab on the asset form is no longer visible on MM Express.
• 14413: It is possible to create a command after creating a new database via MM.
• 14410: The schedule shows the right data in December view.
• 14402: When inputting a quantity or a comment on an inventory session (warehouse staff),
this switches to in progress.
• 14392: Consistent labels on the inventory form (warehouse staff), comments and analyses tab.
• 14391: A recording of an inventory session (warehouse staff) maintains the data already
inputted.
• 14225: When the status of an inventory (warehouse staff) is switched, the storage location of
a session with criteria is maintained.
• 13908: If the closure date of a WO line is not entered when the WO is closed, it will be set with
the WO closure date.
• 13712: When the quantity of a WO line is negative, the total cost of the line is calculated
correctly.
• 12075: A part import no longer updates the fields not selected in the import file.
• 11600: When a WO line is deleted, the corresponding movements are not deleted.
Page 7/7