Daily Progress 09.02.2024 APR

The document provides an update on the progress of various contractor and departmental maintenance teams conducting infrastructure work on different sections of track in the region, including switch rail loading and unloading, rail renewal and welding, sleeper carrying and replacement, and post tamping and dressing. It lists the location, description, and status of work being done by 8 different contractor/maintenance teams on sections between AAL Yard and SNGP, and provides instructions to various supervising engineers to attend to specific ongoing work. Caution orders and rail temperature readings are also included at the bottom.

Uploaded by

adigamerz751
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Daily Progress 09.02.2024 APR

The document provides an update on the progress of various contractor and departmental maintenance teams conducting infrastructure work on different sections of track in the region, including switch rail loading and unloading, rail renewal and welding, sleeper carrying and replacement, and post tamping and dressing. It lists the location, description, and status of work being done by 8 different contractor/maintenance teams on sections between AAL Yard and SNGP, and provides instructions to various supervising engineers to attend to specific ongoing work. Caution orders and rail temperature readings are also included at the bottom.

Uploaded by

adigamerz751
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Progress of Contractor/DTM work in the section of SSE/P.Way/APR - Date: 09.02.

2024
S. N. Contractor/DTM Man Power Description of Work Block Section Location/KM Remarks
Switch rail loading work at AAL Yard AAL Yard Line No. 03 881/22-26 Loading = 05 Nos. (BT 13:05 - 13:35)
1 UTV M/C-035 8
Switch rail unloading work APR Yard APR Yard Line No. 07 Unloading work = 05 Nos. (BT 14:30- 15:00)
4 With UTV M/C for unloading of switch rail APR Yard Line No. 07 With UTV M/C for unloading of switch rail
2 DTM 01AK (i) Rail Renewal = 12.20 mtr.
1+7 Weld fracture rail renewal and welding work APR
APR-MZH, UP Line 868/15-17 (ii) Cutting = 03 Nos. (OC = 1, OT = 2)
Yard
3 MPG 4 (iii) Welding OT = 01 Nos.) (BT 10:55 - 12:20)
SEJ packing and with UTV M/C for switch loading & SEJ packing and with UTV M/C for switch loading &
4 DTM 02AK 6 AAL Yard Line No. 03 881/22-26
unloading work AAL & APR Ayrd unloading work AAL & APR Yard

BUH Yard, UP, DN & (i) SEJ carry = 04 Nos.


5 DTM - 03AK 1+8 SEJ sleeper carry and X-ing carry work 891/17A-3A & 890/15-891/16
3rd Line (ii) CMS X-ing carry = 01 Nos.
(i) Rail renewal = 9.80 Mtr.
6 DTM -04AK 1+6 IMR rail renewal and welding work BUH,SNGP, DN Line 894/16-14 (ii) Cutting = 03 Nos. (OC = 01, OT = 02)
(iii) Welding OT = 02 Nos. (BT 12:55-14:25)
7 DTM - 05 AK 5 Sleeper carry and renewal work SNGP-SDL, UP Line 904/41-905/01 Sleeper carry & renewal = 03 Nos.
8 Cont. B.N. Mishra 3+38 Post tamping and dressing boxing work APR yard, Line No.01, 02 & 03 870/02-869/25 Progress slp = 1141 Nos.
Sri Kedar Nath Sahu JE/P.Way/APR Leave
Sri Lalan Kumar Sinha SSE/P.Way/Sect./AAL Attend toWeld fracture rail renewal and welding work APR Yard
Sri Vinay Kumar Sharma JE/P.Way/BUH Attend to UTV M/C - 035 for switch rail loading & unloading work at AAL & APR Yard
Sri Surendra Ram SSE/P.Way/Sect./SNGP Attend to IMR rail renewal and welding work at km 894/16-14 DN Line
Caution Order
Rail Temperature 08/28 (05:00 AM-13:00 PM) Rain Fall = 0 mm , Commulative = 700 mm
Items Scope Progress Cummulative Balance
OMS Peak Location
UP = 16, DN = 0, Total = 16 UP = 0, DN = 0 UP = 0, DN =0 UP = 16, DN = 0
Date:- 09.02.2024 UP Line