PEC Eng - Works - BYELAWS 1987 AMENDED VERSION 2023
PEC Eng - Works - BYELAWS 1987 AMENDED VERSION 2023
``````````````````````````````````
(AMENDED UPTO JULY 26, 2023)
`````````````````````````````````````````````````````````````````````````
PART II
GOVERNMENT OF PAKISTAN
NOTIFICATION
(a) all engineering works; except the works valuing less than four million
rupees;
(c) clients and employers who employ constructors and operators for any
engineering work in their charge; and
(a) “Act” means the Pakistan Engineering Council Act, 1975 (V of 1976);
(c) “completion date” shall mean the date on which the construction of
project is completed as per construction contract;
(g) “licence” means a licence granted by the Council under these bye-laws
permitting a licensee to construct or operate projects of the category
as specified in the licence for a specified period;
(kk) “professional credit points (pcp)” means the professional credit points
earned by a person, or by an organization on the basis of professional
strength and are computed in the manner prescribed in these bye-laws;
4. Licences.– (1) All constructor’s and operator’s licences shall be issued by the
Council on the form prescribed in Appendix C on the basis of professional engineering
content of the constructors’ or operators’ organizations in accordance with the
procedure laid down in these bye-laws.
(2) The licence issued to the constructor or operator shall specifically mention
the type of work that the constructor or operator can undertake according to disciplines
shown in the application form prescribed in Appendix A.
(g) fail to pay the prescribed licence fees or the charges for violations in
accordance with these bye-laws:
Provided that the persons who are directors of such companies,
which are under liquidation, shall not be affected by the provisions of
this bye-law unless such persons, as individuals, are declared to be
bankrupt.
TABLE ‘B’
OPERATOR’S CATEGORIES
Operator's Limit of capital Minimum Minimum requirement of engineers
Category cost of project requirement of
(million rupees) professional credit
points (pcp credit)
TABLE ‘C’
FOREIGN CONSTRUCTOR’S CATEGORIES
Constructor’s Limit of Financial Minimum Requirement at
Balance to be
Category constructio soundness number of the time of
fulfilled at the time
n cost of (million US$) RE as issuance of
of issuance of
project trainee provisional
standard licence
(million engineers licence
US$) Paid- Net PCPs Fee PCPs Fee
up Worth (50%) (US$) (50%) (US$)
Capital (50%) (50%)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
FC-A No limit 1.5 120 5 100 12,000 100 12,000
FC-B Up to 40 1 75 3 60 6,000 60 6,000
FC-1 Up to 25 0.8 30 2 45 5,000 45 5,000
(a) If a foreign firm in JV with Pakistani firm has not obtained any work with
“provisional licence”, it shall have to apply for renewal of “provisional licence”
after its expiry, till the firm obtains any project or work in JV with Pakistani firm
of appropriate category.
(b) Each “provisional licence” shall (in watermark and bold) carry remarks “Only for
Bidding” ;
8
TABLE ‘D’
FOREIGN OPERATOR’S CATEGORIES
Operator’s Limit of Financial Minimum Requirement at the Balance to be fulfilled
Category capital cost soundness number of time of issuance of at the time of issuance
of project (million US$) RE as provisional licence of standard licence
(million Paid-up Net trainee PCPs Fee (US$) PCPs Fee (US$)
US$) Capital Worth engineers (50 %) (50%) (50 %) (50%)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
FO-A No limit 1.5 120 5 100 12,000 100 12,000
FO-B Up to 40 1 75 3 60 6,000 60 6,000
FO-1 Up to 25 0.8 30 2 45 5,000 45 5,000
(a) If a foreign firm in JV with Pakistani firm has not obtained any work with
“provisional licence”, it shall have to apply for renewal of “provisional
licence” after its expiry, till the firm obtains any project or work in JV with
Pakistani firm of appropriate category.
(b) Each “provisional licence” shall (in watermark and bold) carry remarks
“Only for Bidding””.
(9) Grant of licence to a licensee shall oblige him to report to the Council if at
any time he undertakes to construct or operate more than one project which results in
aggregate construction and capital cost of the projects undertaken exceed the
construction and capital cost of a single project permitted by the category of his licence.
In his report the licensee shall also give the details of actions taken by him to fulfill the
requirements of clause (4) of bye-law 5.
(10) Two or more licensees can apply jointly to construct or operate a project of
a category higher than the category of their individual licences provided that the cost of
such project does not exceed the sum total of the limit of costs of projects permitted by
the categories of the individual licensees. No separate licence for such joint venture
shall be required under these bye-laws provided that the joint venture fulfills all other
requirements of these bye-laws concerning such a project.
For every professional engineer employed without break for Bonus pcp credit.
10–14 years .. .. .. 2
15–19 years .. .. .. 4
20–24 years .. .. .. 8
25 years and over .. .. .. 12
(2A) Extra points for postgraduate engineers and those who have paid
membership fee for life shall also be allowed as under:-
(a) MS/ME .. .. .. .. 2 points.
(b) Ph.D./D.E. .. .. .. .. 4 points.
(c) Fee paid for life. .. .. .. .. 1 point.
(4) Regardless of the category, the licence granted by the Council obliges every
licensee to maintain such professional engineering strength to manage the projects at
hand that he has at all times a pcp credit of:-
(i) in the case of constructor, one point for every twenty million rupees
construction cost of projects in hand at any time, or the minimum
requirement of pcp credit prescribed for the category of his licence,
whichever is more; and
(ii) in the case of an operator, one point for every twenty million rupees cost
of projects in hand at any time or the minimum requirement of pcp credit
prescribed for the category of his licence, whichever is more.
(5) For computation of pcp credit as per bye-law 5(4) above, the aggregate
professional experience in terms of full years of all professional engineers employed by
the licensee on full time basis shall be counted as professional credit points to the credit
of the licensee at the time. Part timers shall be omitted from the computation. For the
purpose of computing the construction and capital cost of projects, the total costs of all
the projects in the hands of the licensee shall be added. These costs shall be based on
10
signed construction contracts, proposals, tenders or estimates. The licensee shall ensure
that the actual professional credit points including bonus and extra bonus points at any
time in his organisation shall not be lower by more than 20 percent for a period not
exceeding twelve weeks at any one time.
(6) Licences may be granted under these bye-laws once every financial year and
shall be valid up to the thirtieth June of the next year. A licensee may apply for
upgrading the category of his licence any time after fulfilling the requirements of these
byelaws and payment of the prescribed fee.
6. Code of ethics.– (1) Every constructor shall uphold the honour and dignity
of the construction profession, and shall be fair and honest in his business dealings. His
practices and activities shall be guided by the principles of justice and equity.
(3) A constructor shall provide quality service and be faithful in the performance
of the undertaking.
(5) A constructor shall hold himself dedicated to the proposition that the
construction profession shall be rid of individual whose reputation, conduct and
practices are inimical to the profession.
(5a) A constructor shall promote and ensure the optimum utilization of human
and material resources of Pakistan for achieving self-reliance and promote indigenous
materials and equipment.
(5b) A constructor shall advise his client or employer honestly about the
technical and financial viability of project entrusted to him.
(5c) A constructor shall ensure the safety of men and materials associated with
the work.
(6) Clauses (1) to (5f) shall equally apply to an operator and the operation of
projects.
11
(5) For award and execution of an engineering work the relevant standard form
of bidding or tender document prepared by the Pakistan Engineering Council shall be
adopted.
(2) A licensee shall inform the Council of any events taking place after grant
of a licence to him or renewal thereof, which render him ineligible for continuation of
licence in accordance with these bye-laws. On receipt of such information the Council
may decide to reduce the category of licence or suspend or cancel the licence as it may
deem fit.
(3) The fee for a licence, change of category of licence, or renewal of licence,
accompanied with the application, shall be as categorized in the Table below.
TABLE
Category Pakistani applicant Foreign applicant
(Rupees) (US $)
(1) (2) (3)
C-A/FC-A
400,000 24,000
O-A/FO-A
C-B/FC-B
O-B/FO-B 250,000 12,000
C-1/FC-1
O-1/FO-1 150,000 10,000
(3A) The following fee criteria shall be observed for upgradation of category of
licence, besides fulfillment of requirements of these bye-laws, namely:–
(a) one step up fee of desired category;
(b) two steps up two times of desired categories; and
(c) three steps up and onward three times of desired category.
(4) No consideration shall be given to any application unless the licence fee is
paid with the application. The above fee is inclusive of scrutiny fee of half the amount.
In the event of rejection of application, half of application fee will be refunded.
(5) Any infringement of these bye-laws by a licensee shall render him liable
to punitive action by the Council as it may deem fit. Such action may amount to
suspension for a specific period or cancellation of licence altogether.
(6) Submission of information to the Council by an applicant for licence or by
a licensee which is found to be false or intentionally misrepresented shall be considered
as misconduct and such applicant or licensee and/or the person representing such
applicant or licensee shall be liable to be punished in accordance with the provisions of
the Act.
14
(3) The provisions of the Building Code shall be revised by the Pakistan
Engineering Council after every five years or earlier if so required by circumstances.
15
(iii) street and area lights not installed or maintained by utility; and
(iv) underground mine wiring or installation in ships, railway rolling
equipment, aircraft, or automotive equipment.
(5) General. ―
(a) The utilities, consultants, authorized contractors, or other entities
performing design, construction, operation, or maintenance tasks for
electric supply or telecommunication lines, or equipment covered by
this code, shall be responsible for meeting applicable requirements.
(b) For all particulars not specified in this code, installation, operation
and maintenance should be done in accordance with accepted good
practice for given local conditions, known at the time for construction
or maintenance of telecommunication, supply lines and equipment.
(6) The provisions of this code shall also be applicable to new and modified
installations except that ―
(a) these may be waived or modified by the administrative authority.
When so waived or modified, safety shall be provided in other ways;
and
(b) where an existing installation meets, or is altered to meet this code,
such installation is considered to be in compliance.
(7) Waivers and limitations.―
(a) In case of emergency installations, the clearance required and burial
depth may be adjusted as per the provisions of this code.
(b) In case of any conflict, relevant provisions of safety, health, labor or
environmental codes shall prevail.
(c) This code only specifies benchmarks that need to be accomplished
for safety, and does not specify how to accomplish these.
(3) The implementation and enforcement of this Bye-laws shall vest with the
Authority Having Jurisdiction (AHJ) within their respective jurisdiction and circles as
follow:
(1) Building Control, Housing and Development Authorities
(2) District Administration
(3) Tehsil or Town Administration
(4) Municipal Administration
(5) Station Headquarters (Army, Air Force and Navy)
(6) Cantonment Administration
(7) Union Council Administration
(8) Autonomous Bodies
(9) Industrial Estates
(10) Directorates of Civil Defence
(11) Export Processing Zones
(12) Other Federal/Provincial Authorities as and when notified
(4) This Bye-law shall come into force upon being notifies and all the concerned
AHJs shall implement the same immediately in prescribed manner.
(5) All relevant AHJs shall ensure compliance and implementations of this Code
and accordingly adopt or amend their relevant regulations, Bye-laws or rules as the
need be.
(6) This Bye-law shall apply to both new and existing buildings.
(a) buildings permitted for construction after the adoption of these
provisions shall comply with the provisions stated herein for new
buildings forthwith;
(b) existing buildings constructed prior to adoption of these provisions
shall comply with the provisions stated herein as soon as possible but
not later than three years of notification of these provisions; and
(c) minimum fire protection requirements such as provision of fire alarm
and detection system, fire extinguishers, emergency response plans
and fire drills shall however be in place as soon as possible but not
later than one year of notification of these provisions.
(7) Any person who fails to comply with this Bye-law, or fails to carry out an
order made pursuant to these provisions, or violates any condition attached to a permit,
approval, or certificate shall subject to the penalties in accordance with the regulations
of AHJ.
(8) These provisions shall first be reviewed and updated after five years of
notification, and thereafter every five years or earlier, on the basis of data and feedback
received by the committee, as constituted by Pakistan Engineering Council.
18
APPENDIX-A
[see bye-law 2(aa)]
1- Name of firm/company:
2- Name of CEO:
3- NTN of firm:
4- Mailing Address:
9- PARTICULARS OF DIRECTORS/PARTNERS/SHAREHOLDERS/OWNER:
Name Designation PEC Reg # CNIC No or Passport No Cell No Address
If any (In case of foreign national)
b. Deputy Registrar: The case was properly scrutinized, the case was found correct,
may be processed for.
14- UNDERTAKING:
I undertake that;
(a) The information given above and documents/papers attached herewith
are correct and accurate to the best of my knowledge and belief and
nothing has been concealed.
(b) I will abide by the provisions of PEC Act 1976 and Construction and
Operation of Engineering Works Bye-laws,1987.
(c) I shall be responsible if any information, document or paper submitted
by me is found incorrect or forged.
(d) I will inform the Council if any of above mentioned engineer(s) leaves
the firm.
(e) I will inform the Council about any event taking place after grant of
licence, which render my/our firm ineligible for continuation of licence,
reduction in the category, suspension or cancellation of the licence as per
bye-law 8(2).
21
Company/Firm’s Seal
Signature: _________________________
Name: _________________________
Mobile No: ________________________
Date: _______________ - -
CNIC No.
(CEO/ Chairman/ Managing Partner or Director)
22
Prescribed fee of Rs. ……… has been received and credited vide Receipt No.
……………. Dated …………
Registrar
PEC
INSTRUCTIONS FOR FILLING THE APPLICATION FORM FOR NEW LICENCE FOR A
CONSTRUCTOR/OPERATOR
1. Before filling in the application form, please see bye-laws 4 and 8 of the
Construction and Operation of Engineering Works Bye-laws, 1987.
2. Please write the name of your firm or company by which name you would like it
to be called and registered. Please indicate whether you are a Pakistani firm or a
foreign firm by striking out inapplicable.
3. Please give addresses of all your main offices and permanent branches as on the
date of application.
4. For initial registration, the applicant for the constructor’s or operator’s licence
shall submit application to the Council in the prescribed form. The application for
renewal shall be submitted to the Council by the 5th day of May of the year based
on the constructor’s or operator’s status as on the 30th day of April of the same
year. The licence shall stand expired on 30th day of June of next year.
5. A licensee shall inform the Council of any events taking place after grant of a
licence to him or renewal thereof, which render him ineligible for continuation of
licence in accordance with the clauses of aforesaid bye-laws. On receipt of such
information, the Council may decide to reduce the category of licence or suspend
or cancel the licence as it may deem fit.
23
6. The annual application fee for a licence, change of category of licence, or renewal
of licence is as follows, which should accompany the application:-
Note:- If a firm could not get its registration renewed, the firm will be renewed
after payment of outstanding fee of entire defaulting period plus
surcharge of 5% of defaulting fee amount, or prescribed from time to
time.
7. If a firm intends new registration directly in C-3/O-3 category or above, fee of
three times of the desired category shall be charged.
*Note: Following codes will be awarded to firms, registered with PEC in C-6/O-6
category OR C-5/O-5 having relevant engineers or enter into agreement
with supervisory certificate holder engineers:-
(a). Code C-6 (11)
All types of repair/maintenance of civil engineering works.
Construction related civil engineering works including allied electrical
and mechanical works.
Water supply, sanitary, drainage, sewerage and plumbing works.
Street Road, P.C.C streets, pavements including culverts.
(b). Code O-6 (11)
All types of operational works.
Toll collection, operational and management works.
Mobile engineering workshop
(c).Code C-5 (11)
All types of repair/maintenance of civil engineering works.
Construction related civil engineering works including allied electrical
and mechanical works.
Water supply, sanitary, drainage, sewerage and plumbing works.
Asphalt Road, P.C.C streets, pavements including culverts.
(d). Code O-5 (11)
All types of operational works.
Toll collection, operational and management works.
Mobile engineering workshop
(e). CE10 Addition
General Buildings and Maintenance
All types of repair/maintenance of civil engineering works.
Construction related civil engineering works including allied
electrical and mechanical works.
Asphalt Road, P.C.C streets, pavements including culverts.
29
Form-I
UNDERTAKING BY ENGINEER OWNER/SHAREHOLDER/PARTNER
(The affidavit shall be furnished on stamp paper valued Rs. 100/-, issued in the name of undersigned and duly notarized with
Notary Public)
Form – II
AFFIDAVIT
(The affidavit shall be furnished on stamp paper valued Rs. 100/-,
issued in the name of undersigned and duly notarized with Notary Public)
2. I solemnly affirm and declare that following work orders along with their
performance certificates / reports are being submitted by the undersigned to
PEC for up-gradation from category C-____ to C-____.
S.# Work Order Reference Subject of work order Awarded by Value of Work
No. with Date awarded
(Rs. in Million)
(a)
(b)
(c)
(d)
Company/Firm’s Seal
Signature: ________________________________
Name: ___________________________________
Contact No: _______________________________
Date: _______________ - -
CNIC No.
(Owner/Shareholder Partner)
Witness:-___________________
___________________
Form – III
DEPONENT
Signature: _________________________
Name_____________________________
CNIC No: _________________________
Dated: ____________________________
Form - IV
PERFORMANCE CERTIFICATE
(For each major work during last three years)
Form - V
PERFORMANCE CERTIFICATE
(For each major work in hand)
NAME OF EMPLOYER: _______________________________________________
NAME OF PROJECT: __________________________________________________
NAME OF CONSULTANT (IF EMPLOYED): ______________________________
STARTING DATE: _________________
ORIGINAL COMPLETION DATE: _________________
ACTUAL COMPLETION DATE: ___________________
DELAY PERIOD: ______________________________
LIQUIDATED DAMAGES: ________________________
ORIGINAL CONTRACT VALUE: ___________________
VALUE OF WORK DONE UPTO FINAL BILL: _________
PERCENTAGE OF WORK DONE WITH DATE: ____________________________
ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK:
Sr. Name of Date of PEC Reg. Date of Reg Renewed Employed Employed To
# Engineer Birth No. upto From
1
2
3
4
APPENDIX –‘AI’
[see bye-law 2(aa)]
8- UNDERTAKING
I undertake that;
a) the information given above and documents/papers attached herewith are correct and
accurate to the best of my knowledge and belief and nothing has been concealed.
b) I will abide by the provisions of PEC Act 1976 and Construction & Operation of
Engineering Works Bye-laws 1987.
33
Company/Firm’s Seal
Signature: ______________
Name: ________________
Mobile No: ____________
Date: _______________ - -
CNIC No.
(CEO/ Chairman/ Managing Partner or Director)
34
Prescribed fee of Rs. …………has been received and credited vide Receipt No. …………
Dated ………….………
Registrar
PEC
1. Before filling in the application form, please see clause 4 and 8 of the Construction and
Operation of Engineering Works Bye-laws, 1987.
2. The annual application fee for all Constructor/Operator category licence, Financial
Limits and PCP’s required for renewal of licence is mentioned below, the evidence of
payment should accompany the application form.
3. For renewal, the applicant for the constructor’s or operator’s licence shall submit
application to the Council in the prescribed form. The application for renewal shall be
submitted to the Council by the 5th day of May of the year based on the constructor’s or
operator’s status as on the 30th day of April of the same year. The licence shall stand
expired on 30th day of June of next year.
4. A licensee shall inform the Council of any events taking place after grant of a licence to
him or renewal thereof, which render him ineligible for continuation of licence in
accordance with the clauses of aforesaid bye-laws. On receipt of such information, the
35
Council may decide to reduce the category of licence or suspend or cancel the licence as
it may deem fit.
Net
Limit of capital Minimum Requirement Worth Fee
Category PCPs
Cost of Project of Engineers Rs. In (Rupees)
million
O-A No Limit Two P.Es with 20 years 150 150 400,000
of Experience each +
Three REs having
supervisory certificate
O-B Up to 2000 Two P.Es with 15 years 75 100 250,000
of Experience each +
Two REs having
supervisory certificate
O-1 Up to 1000 Two P.Es with 10 year 30 75 150,000
of Experience each +
One RE having
supervisory certificate
O-2 Up to 500 One P.E + R.Es 25 35 125,000
O-3 Up to 200 50% R.E 10 20 75,000
O-4 Up to 100 50% R.E 3 15 45,000
O-5 Up to 30 One R.E 2 5 30,000
O-6 Up to 20 One R.E 1 5 15,000
Note:- If a firm could not get its registration renewed, the firm will be renewed after
payment of outstanding fee of entire defaulting period plus surcharge of 5% of
defaulting fee amount, or prescribed from time to time.
36
APPENDIX-AII
[see bye-law 2(aa)]
FOR OFFICE USE ONLY
PAKISTAN ENGINEERING COUNCIL
Ataturk Avenue (East), Sector G-5/2, Islamabad Application Tracking No. _______
UAN: 111-111-732 Fax: 051-2780346
Receiving Date ________________
E-mail: [email protected]: http://www.pec.org.pk
7- Major works executed after previous Up-gradation (of last three years):
Year of Value of %age of
Sr. # Deptt / Org Description of Work
Award Work (Rs) Completion
1
2
3
4
Add separate sheet (if required)
(Attach copy of Work Order, agreement and Performance Certificate duly verified by Concerned Department)
37
9- UNDERTAKING
I undertake that;
a) the information given above and documents/papers attached herewith are
correct and accurate to the best of my knowledge and belief and nothing has
been concealed.
b) I will abide by the provisions of PEC Act 1976 and Construction & Operation
of Engineering Works Bye-Laws 1987.
c) I shall be responsible if any information, document or paper submitted by me is
found incorrect or forged.
d) I will inform the council if any of above mentioned engineer(s) leaves the firm.
e) I will inform the council about any event taking place after grant of licence,
which render our firm ineligible for continuation of licence, reduction in the
category, suspension or cancellation of the licence as per Bye-laws 8(2).
Company/Firm’s Seal
Signature: _____________
Name: ________________
Mobile No: ______________
Date: _______________ - -
CNIC No.
(CEO/ Chairman/ Managing Partner or Director)
Company/Firm’s Seal
Signature: _____________________
Name: ________________
Mobile No: ____________________
Date: _______________ - -
CNIC No.
(CEO/ Chairman/ Managing Partner or Director)
Prescribed fee of Rs. ……has been received and credited vide Receipt No. …………
Dated ………….………………
Bank Name. ………………….. Dated ……………… Amount Rs .………………..
Signature of Signature of
Accounts Official: _______________ Internal Auditor:_____________
Registrar
PEC
39
Limit of capital
Minimum Requirement Net Worth Rs. Fee
Category Cost of Project PCPs
of Engineers in million (Rupees)
million rupees)
O-A No Limit Two P.Es with 20 years 150 150 400,000
of Experience each +
three RE having
supervisory certificate
40
Note:- If a firm could not get its registration renewed, the firm will be renewed after
payment of outstanding fee of entire defaulting period plus surcharge of 5%
of defaulting fee amount, or prescribed from time to time.”;
APPENDIX-AIII
[see by-law 2(aa)]
10- UNDERTAKING
It is hereby certified that the information given above is true and I/we take full
responsibility for its correctness and accuracy to the best of my/our knowledge and
belief and nothing has been concealed. This is further to certify that this application
fulfils the entire requirements of PEC Bye-laws for licensing of constructors/operators
and I/we fully understand the provisions of the PEC Bye-laws and agree to abide
by them.
Signature(s)
Company/Firm’s Seal
Name: ___________________
CEO/Authorized Representative: ___________________
Date: _______________ CNIC No/Passport No.:____________________
1. Before filling in the application form, please see clause 7(2) of the Construction
and Operation of Engineering Works Bye-laws, 1987.
2. The annual application fee for all Constructor/Operator category licence,
Financial Limits and PCP’s required for new/renewal of licence is mentioned
below; the evidence of payment should accompany the application form.
3. Foreign firm will not be eligible to participate in bidding individually. Foreign
firm shall have to enter into joint venture with Pakistani firm registered with
PEC of equitable/compatible category (FC-A, FC-B, FC-1, FO-A, FO-B and
FO-1) and submit to the employer before participating in bidding.
4. Licence shall be issued on yearly basis which will have to be renewed after its expiry.
Financial limits, PCPs requirements & applicable fee for Foreign Constructors
Note:
1. Foreign constructor will employ minimum 70% Pakistani engineers and 30% of
foreign engineers of relevant discipline/field and technical staff.
2. The company must qualify one of the two columns under Net Worth, Paid up
Capital or Financial Soundness.
3. Initially provisional license will be issued for participation in the bidding with
50% of required PCPs. After award of work standard license will be issued with
completion of PCPs.
43
Financial limits, PCPs requirements & applicable fees for Foreign Operators
Note:
1. Foreign operator will employ minimum 70% Pakistani engineers and 30% of foreign
engineers of relevant discipline/field and technical staff.
2. The company must qualify one of the two columns under Net Worth, Paid up Capital
or Financial Soundness.
3. Initially provisional license will be issued for participation in the bidding with 50% of
required PCPs. After award of work standard license will be issued with completion
of PCPs.
4. Penalties will be imposed maximum/three times of fees or cancellation of license,
if required PCPs are not provided at the time of execution of the contract.
APPENDIX – B
[See clause (5) of bye-law 4]
UNDERTAKING BY ENGINEER
I …………………, adult, resident of ……….. do hereby solemnly declare as
under:-
5. That I have not ever incurred any disqualification in any manner under the
Pakistan Engineering Council Act and Bye-laws. (if in the past any
disqualification was incurred please mention material detail).
6. That the contents of the above mentioned undertaking are true to the best of my
knowledge, belief and information received and nothing has been concealed
therefrom.
___________
DEPONENT
I.D.CARD NO._______________________
DATE: _______________________
PLACE: _______________________