REVISED ONE DTI SECOND SURVEILLANCE AUDIT REPORT - ROs and Bureaus
REVISED ONE DTI SECOND SURVEILLANCE AUDIT REPORT - ROs and Bureaus
CONFIDENTIAL
This Audit Report is confidential and intended for the organization stated above. It is strictly forbidden to share any part of the report with any
third party without the consent of the organization. Unauthorized disclosures will be subject to existing laws. Should this report be inadvertently
sent to you by mistake, you are required to inform us and immediately delete it.
AUDIT REPORT
ISO 9001:2015 SECOND SURVEILLANCE AUDIT - ANNUAL
A. AUDIT INFORMATION
Name of Organization Client ID Audit Dates
DEPARTMENT OF TRADE AND INDUSTRY 5428 06 October – 07 December 2023
Provision of consumer advocacy, trade and industry information, business counselling, conduct of trade fairs, conduct of training, business name
registration, issuance of sales promo permit, accreditation of service enterprise, issuance of BMBE registrations, monitoring and enforcement of Fair
Trade laws (FTLs), price monitoring, consumer complaints handling, and administrative support to operations.
Attachments
Audit Plan Attendance Record Closing Meeting Report Action Request Report, If Applicable
Others (Please Specify) ____________________________
Guidance on audit report presentation:
1. Although audit results presented in Section C is on a per-clause basis, CIPI uses a process approach as a methodology in auditing. Further, it adopts a holistic
approach to evidence gathering in determining the level of conformity to the management system and its effectiveness in achieving the intended results.
2. The reference standard is also presented for the organization to recognize its intent, and thereby, address the requirement in a manner that is useful for the
organization.
LEGEND: Black Font – Conformity Blue Fonts – Opportunities For Improvement Red Fonts - Nonconformity
The organization’s implementation of its quality management system has been demonstrated and was found to be generally compliant to the
requirements of the Standard ISO 9001-2015. One DTI has shown a very good level of improvement in its QMS since it started in 2021.
However, there is a need to eliminate the causes of the three (3) minor Nonconformities identified in this surveillance audit . Out of the five (5)
previously reported nonconformities, three (3) are recommended for close-out. Two of these were raised during the Stage 2 audit. The two (2) previous
nonconformities found in the 1st surveillance audit are still open (Team-01/S1 and Team-02/S1). While most of the regional offices and bureaus that
were identified in these two (2) previous NCs were found to have effectively implemented their corrective actions, there were a few offices where
lapses to the requirements of Clause 7.2 (Competence) and Clause 9.1 (Monitoring and Measurement) were seen. Opportunities for improvement
were also offered in this audit and the organization is strongly encouraged to consider them.
Internal and external issues relevant to the strategic direction of the organization and the requirements of its relevant interested parties (stakeholders)
were reviewed and updated and the corresponding risks and opportunities were addressed thru action planning and implementation.
Leadership & commitment has been demonstrated by top management at the Central Office and the offices/bureaus through their active participation
in the QMS and management reviews, so that the QMS remains relevant and aligned/integrated with the organization’s processes.
The organization is recommended for continued certification to the Standard ISO 9001:2015 subject to acceptance by the CIP Review Board of the
adequate response to the Action Request Report submitted after the closing meeting at the Central Office last December 07, 2023.
Region 2
Region 3, CAR
The internal and external issues were determined through the SWOT
analysis method and some of which were as follows:
• Strengths- knowledgeable accreditation officer; establishment of
One DTI-QMS; established BN system; maintenance of data base
• Weakness – Unavailability of Accreditation officer in certain
situation; mobility of accreditation officer to conduct inspection due
to old service vehicle; inadequate facilities; malfunction of
equipment.
• Opportunities – Acceptance of application for accreditation of SRE
• Threats – Occurrence of fortuitous events such as earthquake, flood,
pandemic, etc.
Region 4A
Its organizational SWOT analysis (FM-PL-OG-03) has been updated to
process the internal issues and concerns. This is done through session and
meetings to determine their strength, weaknesses, opportunities and
threats. Under item 5 of the 4th Mancom meeting (October 2023), updates
5Ms (man, method, machine, materials, and measurements) are also used
in determining or assessing both the issues and concerns of the
organization.
Region 5
When determining the direction and strategy that DTI-Region 05 intends to
pursue, it is guided by the Department of Trade and Industry’s “Prosperity
Plan 2022”. This Plan affects how the Regional Office addresses the
requirement Context of the Organization.
Those internal and external issues relevant to DTI-Region 05 are
determined through the One DTI QMS Planning Tools (Document Code: GL-
PL-01, Version 3, Date Effective: 01 August 2022). These internal and
external issues are based on the Strategic Direction of DTI as a whole (i.e.
its Vision, Mission, Core Values, and Quality Policy). The specific issues are
determined through the use of a SWOT analysis: internal issues are the
Region 6
Organization SWOT Analysis FY 2023 was updated 21 July 2023
Examples:
• Strength: experienced and highly responsible workforce
• Weakness: unprogrammed activities downloaded to the
region/provinces affecting absorptive capacities of a lean
organization
• Opportunities: new technologies (online platforms)
• Threat: legal suit/case against personnel or agency
Region 7
Region 8
Organization SWOT Analysis FY 2023 updated 13 October 2023
• Strength: (S-8) Upgraded BNR System with continuous
enhancement
• Weakness: (W-18) Untimely updating of available information or
data
• Opportunities: (O-8) Advancement and adoption in information
communication technology, e-commerce and digitalization
• Threat: (T-3) BNR systems breakdown/downtime
Region 9
Organization SWOT Analysis FY 2023 was updated last November 8, 2023
Examples:
• Strength: competent personnel knowledgeable in the process
• Weakness: outdated office equipment (laptop, computer, printer)
• Opportunities: strong partnership with LGUs, NGAs, NGOs, private
sector, and international
• Threat: unforeseen natural calamities
Region 10
Organization SWOT Analysis FY 2023 was updated 26 September 2023
Examples:
• Strength: agile/strong leadership and hands on approach
• Weakness: limited mentoring/coaching for staff
• Opportunities: Region 10 strengthens its position as the preferred
Gateway, industrial core, and trade center in the South thru digital
transformation of MSMEs in the agri-business, tourism, and service
sectors
• Threat: BNR system breakdown/downtime
Region 11
Organization SWOT Analysis FY 2023 updated 30 September 2023
• Strength: (S-5) Established Knowledge Resource
• Weakness: (W-2) Limited manpower/limited number of Plantilla
positions
• Opportunities: (O-6) Strong collaboration with LGU, academe, NGAs,
NGOs, and Other Internal Program Institution.
• Threat: (T-10) Proliferation of deceptive sales act and practices
Region 12
DTI Region 12 has determined its external and internal issues that are
relevant to its purpose and strategic directions documented in its SWOT
analysis reviewed on 05 July 2023.
CARAGA
The SWOT analysis was presented with the identification code of the
issues, the identified issues, potential risk and potential opportunities
NCR
Prosperity Plan 2022, with a vison for a more inclusive and prosperous
Philippines with employment and income opportunities for all. The latest
review of the Organizational SWOT Analysis was conducted October 31,
2023 for the NCR Office. No changes so far was identified from the internal
and external issues.
Strengths – 20
Weaknesses – 11
Opportunities – 11
Threats - 8
Identification of SWOT to the relevant processes was demonstrated.
Common OFI:
1. Some of the SWOT codes on the Organizational SWOT Analysis as
consolidated at the Regional Office were different from the codes in
the registers of the concerned process. For example, S14 in the
consolidated organizational SWOT is S2 in the process of Price and
Supply Monitoring (PSM); S13 in the consolidated organizational
SWOT is S5 in the process of Conduct of Training (CT).
Region 2
Examples of identified external stakeholders are consumers, MSMEs,
Business establishments, potential investors, NGAs, NGOs, Academe, Media,
LGUs. Internal stakeholders include the DTI Central Office, Bureaus,
employees/process owners.
Examples of the Organizational-level stakeholders and their needs and
expectations are
Interested Parties: Consumers
Needs and Expectations: efficient and timely business consultancy services;
stable internet connection for virtual trainings
Interested Parties: Employees/Process owners
Needs and Expectations: availability of competent sheriff; operational
succession planning
Region 3, CAR
Region 4A
Region 5
Organizational/Regional level Stakeholders Analysis is reviewed quarterly
during Management Review. Inputs from Process Owners and Process
Champions are used for the review. When needed, the Analysis is
updated. The Analysis clearly identifies the interested parties and their
needs and expectations.
The Organizational Stakeholders Analysis—updated on 26 September 2023
during the Regional-level Management Review—showed the interested
parties and their needs and expectations. The changes involved a re-
statement in the needs and expectations for clarity.
Examples of the Organizational-level stakeholders and their needs and
expectations are
MSMEs: Business Development Services, Access to Market, Access
to Finance, Access to Technology, and Capacity Building,
Consumers: Quality and Safe Products/Services, Consumer
Education and Information Services, Stable supply of basic
necessities and prime commodities, and Quick Resolution of
Consumer Complaints.
Region 6
Organization Stakeholder Analysis FY 2023 was updated 21 July 2023, in
which there was an adequate determination of the requirements of the
relevant interested parties identified by the region. Example:
Interested Parties: Consumers
Needs and Expectations: compliance of business establishments to Price
Act and FTL; Skill trainings/seminars/business consultancy; stable internet
connectivity
Region 7
The needs and expectations of interested parties were determined as
seen in the Organizational Stakeholders Analysis updated in 10/16/2023.
Example of interested parties and their needs and expectations determined
were: Consumers - Updated information on safe and quality consumer
products and services; Retailers/Manufacturer – provide timely and
updated information on products under mandatory certification.
Region 8
Organization Stakeholder Analysis FY 2023 (Regional and Provincial Level)
updated 13 October 2023.
Interested Parties: Government Agencies and LGUs
Needs and Expectations: Accurate and complete information about DTI
Programs and Services
Region 9
Organization Stakeholder Analysis FY 2023 (Regional and Provincial Level)
updated last November 8, 2023.
Examples:
Interested Parties: Partner agencies (Government Agencies, financial
institutions)
Needs and Expectations: Business One Stop Shop with LGUs on Business
Permit renewal
Interested Parties: Private Partners (Chamber/SOPHIL/IGZI, Consumer
groups)
Needs and Expectations: regulatory improvement and ease of doing
business
Interested Parties: Consumers
Needs and Expectations: consumer protection from unethical business
practices and unfair trade acts
Other relevant stakeholders include businesses/MSMEs, academe,
regulatory bodies, employees, and suppliers
Region 10
Organization Stakeholder Analysis FY 2023 was updated 26 September 2023
Interested Parties: Consumers
Needs and Expectations: prompt and economical resolution of complaint
within the turnaround time; effective consumer welfare-related information
materials
Interested Parties: Development Partners (NGAs, LGUs, NGOs,
coaches/mentors, local chambers, Industry Associations, etc.)
Region 11
Organization Stakeholder Analysis FY 2023 was updated 30 September 2023
Interested Parties: Consumers
Needs and Expectations: Fair conduct of mediation
Interested Parties: Regulator Bodies: Commission on Audit (COA)
Needs and Expectations: Compliance to COA auditing rules and regulations
Region 12
The needs and expectation of interested parties have been determined as
seen in the Stakeholders Analysis which described who are the interested
parties, their needs and expectations and potential risks and potential
Opportunities.
CARAGA
The Regional Organizational Stakeholders Analysis update last September
27, 2023 was presented with the relevant interested parties and needs
and expectations for all the processes of the DTI Caraga Region such as
BN, BM, TF, TII, BS, CT, SP, CC, PSM, FTL, CA, SA, SR, HR, GAS, FIN and
IT. Examples of identified interested parties are consumers,
businesses/MSMEs, oversight Agencies (COA, DBM, CSC, ARTA, etc),
NCR
Last October 31, 2023, the Organizational Stakeholders Analysis FY 2023
was reviewed and updated.
The relevant interested parties and their needs and expectations are still
the same as in the previous review.
4.3 Determining the Scope of the Quality The scope of the QMS has been validated and remains the same across
Management System the whole archipelago, as follows:
The organization shall determine the boundaries and “Provision of consumer advocacy, trade and industry information, business
applicability of the quality management system to establish counselling, conduct of trade fairs, conduct of training, business name
its scope. When determining this scope, the organization shall registration, issuance of sales promo permit, accreditation of service repair
consider: a) the external and internal issues referred to in 4.1; enterprise, issuance of BMBE registrations, monitoring and enforcement of
b) the requirements of relevant interested parties referred to fair trade laws (FTLs), price monitoring, consumer complaints handling,
in 4.2; c) the products and services of the organization. The and administrative support to operations.”
organization shall apply all the requirements of this
International Standard if they are applicable within the The specific processes were categorized per type of service as reflected in
determined scope of its quality management system. The the DTI Quality Manual under Organizational Profile with Ref. Code
scope of the organization’s quality management system shall DTIQM-01 Rev. No. 2-1 eff. August 2, 2021:
• Provision of Information Services: Consumer Advocacy, Trade and
be available and be maintained as documented information.
Industry Information
The scope shall state the types of products and services
• Provision of Business Development Services: Business Counseling,
covered, and provide justification for any requirement of this
Conduct of Trade Fair, Conduct of Training
International Standard that the organization determines is
• Issuance of Business Permits and Licenses: Accreditation of Service
not applicable to the scope of its quality management system.
and Repair Shop, Issuance of Sales Promo Permit, Registration of
Conformity to this International Standard may only be
Business Name, Issuance of BMBE Registration
claimed if the requirements determined as not being
• Resolution of Consumer Complaints: Consumer Complaints
applicable do not affect the organization’s ability or
Handling
responsibility to ensure the conformity of its products and
• Monitoring and Enforcement of Fair Trade Laws: Monitoring and
services and the enhancement of customer satisfaction.
Enforcement of FTL, Price Monitoring
The Scope also covers the support processes such as HR, Finance,
Procurement, General Services, etc.
Region 4A
Region 4B:
Leadership and Commitment of the Top Management is evident during the
second surveillance conducted. Active participation to the review and
update of the documented information for internal and external issues,
interested parties and their requirement, identification of associated risks
and opportunities. Also, the Top Management review the effectiveness of
the action plans to address the identified risks and opportunities.
Region 6
Leadership and commitment has been generally demonstrated by the region
thru the active participation of the RD, Provincial Directors, and Division
Chiefs in strategic planning, review of issues and requirements of interested
Region 7
Office Order no. 2023-07 249 series of2023 was shared designating DTI-
Region 7 One DTI Quality Team Members with responsibilities defined to
a.) taking accountability for the effectiveness of the quality management
system; b) ensuring that the quality policy and quality objectives are
established for the quality management system and c) are compatible with
the context and strategic direction of the organization; d) promoting the use
of the process approach and risk-based thinking; e) ensuring that the
resources needed for the quality management system are available; f)
communicating the importance of effective .
Region 8 and 11
The Regional Directors (Region 11 and 8) demonstrated good leadership in
the effective implementation of Quality Management System in the
organization as evident in Quarterly Management Review.
Confirmed that the resources needed for the effective implementation of the
QMS is provided through the annual budget provided for the organization
and personnel.
Region 9 and 10
Leadership and commitment has been generally demonstrated by the region
thru the active participation of the RD, ARD (also QMR for Region 9),
Provincial Directors, and Division Chiefs in strategic planning, review of
issues and requirements of interested parties, updating and ensuring
Region 12
Regional Memo order (RMO- 117A series of 2023- dated 16 August 2023) )
was issued to reconstitute DTI Region 12 QMS Team under the One DTI
ISO, to ensure the effective implementation of the Region’s QMS.
CARAGA
The Regional Top management headed by the Regional Director composed
the Regional Management Committee. This committee is responsible
among other for ensuring that the system leads to customer satisfaction
and quality products and services, promoting customer awareness,
ensuring the integrity of the QMS, and effective implementation of the One
DTI QMS in the Regional Office.
Strategic Planning Guide was established for One DTI to define the
strategic Directions, arising from its Values, Mission and Vision.
The Quality Policy as one DTI has been established. Quality objectives
were seen in its Outcomes for FY 2023 defining the Organizational
Outcomes, Measure and Target for 2023 which is based on the baseline of
2023, Quality Objectives and Plans for FY 2023 states the target and
Planning actions on how to achieve the objectives/targets. Process
Performances were also defined as well as monitoring results.
NCR
The commitment of the top management of NCRO was demonstrated from
the active participation and discussion of internal and external issues as well
as the actions to address the risk and opportunities.
The promotion of understanding of the quality policy and the individual
responsibility to achieve the QOP was also made evident.
Region 3, CAR
The customer focus was ensured through the enhancement of customer
satisfaction through the citizen charter and its discussion during the flag
ceremony as well as during the quarterly management review.
Region 4B:
Not only the top management demonstrates its leadership and
commitment with respect to customer focus but the process owners
interviewed during the conduct of the surveillance audit. The process
owners demonstrate a very good commitment toward ensuring that
customer requirement is being delivered beyond customer/client
expectation. Awareness to the identified risks associated to their services
is confirmed during the audit interview. Improvements for the services is
being provided for the enhancement of customer satisfaction.
Region 5
The presented SWOT Analyses and Stakeholder Analyses showed that the
internal and external issues and needs and expectations of the various and
Region 7
1. As seen in the Stakeholders Analysis, customers were identified and
their needs and expectations were analyzed including the
associated risks and action plans for significant ones (first and
second priorities.
2. Customer Satisfaction – Client Satisfaction is known through the
conduct of survey with rating not less than Satisfactory.
Region 8 and 11
The Regional Directors (Region 11 and 8) together with the support of the
Process Owners demonstrated high commitment in meeting the customer
satisfaction and compliance to applicable statutory and regulatory
requirements to their processes.
The organization reviewed and monitored the actions taken to address risk
and opportunities evident in the Quarterly Management Review. Confirmed
that through Strategic Planning Tools CY 2023, DTI Region 11 and 8
ensures that quality objectives are established and monitored with the use
of process approach and risk-based thinking. Results of Client Satisfaction
Feedback (CSF) showed that the customers are very satisfied with the
services of DTI Region 11 and Region 8.
Region 2, 9, and 10
Customer focus at these regional offices has been demonstrated in the ff.:
- Inclusion of clients/customers/consumers in the Organizational
Stakeholders Analysis, determining their needs and expectations
and taking actions to address risks that may arise when meeting
their requirements
- setting of objectives and targets which always include the
measurement of customer satisfaction thru surveys
- setting of Complaints Desks to address issues/feedback/complaints
that may arise from clients
Region 12
Customer requirements are determined as seen in needs and expectations
of the interested parties. The risks and opportunities related to their
requirements are determined and analyzed to determine which needs are
to be prioritized.
CARAGA
Customer focus is assured by conducting regular customer satisfaction and
feedback survey, addressing the concerns, and promoting customer
awareness.
NCR
Processes of the NCRO are implemented based on the standard planning
tools and focus on the satisfaction of the clients. Customer Satisfaction
survey is established to determine the satisfaction rating of the clients for
the services provided by the office core and support processes.
5.2 Policy The Quality Policy of the Department of Trade and Industry, which all
5.2.1 Establishing the quality policy Bureaus/Services, Regional Offices, and Provincial Offices adhere to was
Top management shall establish, implement and maintain a presented. This is documented and controlled in the One DTI Quality
quality policy that: a) is appropriate to the purpose and Manual (DTI QM 01-07). It was reviewed and signed by the current
context of the organization and supports its strategic Secretary of the Department on 15 September 2023. The Policy indicates
direction; b) provides a framework for setting quality DTI’s commitment to develop a more prosperous Philippines.
objectives; c) includes a commitment to satisfy applicable The Quality Policy is communicated to all DTI employees and other
requirements; d) includes a commitment to continual interested parties thru the ff.:
improvement of the quality management system. - One DTI-QMS SharePoint
5.2.2 Communicating the quality policy - DTI Employees recite the Quality Policy during flag ceremony and
The quality policy shall: a) be available and be maintained as management meeting
documented information; b) be communicated, understood - Shown in the DTI website
and applied within the organization; c) be available to relevant - Displayed at the lobby of Regional and Provincial Offices; Public
interested parties, as appropriate. Assistance area
- Quality Policy is part of the awareness program of the organization
at both Regional and Provincial level
The Job Profile of the various work positions identifies the roles and
responsibility of the specific personnel.
Region 2
• Organizational Structure of the Regional Office 2 dated August 26,
2022
• Memorandum on DTI R2 Quality Management Team (QMT)
Members dated January 12, 2023- composed of Regional QMR,
Deputy QMRs, Regional Quality Coordinator, Provincial Quality
Coordinators, Complaints Desk Officers, and Internal Quality Audit
team Head, Team Leader, and Members
• Office Order defining the roles, responsibilities, and authorities of
the Quality Management Team
• Tasks and responsibilities in Position Description Form
Region 3, CAR
Organizational roles, responsibilities and authorities were defined in the
quality manual, relevant procedures and organizational charts, and were
designated to qualified person in the organization.
Region 5
Aside from the Qualification Standard of the Civil Service Commission and
the Competency Standard of the DTI, duties, responsibilities, and
authorities are defined in the documented processes and procedures of
DTI-Region 05.
Region 6
• Organizational Structure of the Regional Office 6 and the Provincial
Offices
• Office Order No. 2023-064 dated October 31, 2023– Designation of
DTI 6 Quality Management Team (QMT)- Regional QMR, Deputy
Region 7
These are defined in the Office Order no. 2023-07 249 series of 2023
designating DTI-Region 7 One DTI Quality Team Members with
responsibilities and authorities.
Region 8
• Regional Office Order No. 2023-030 series of 2023 dated June 6,
2023. Re-composition of the DTI 8 QMS Team signed and approved
by RD Celerina T. Bato
• DTI 8 Regional Office Organizational Chart effective date June 2023
• DTI Samar Provincial Office Organization Chart effective date
October 24, 2023
• Competency Based Job Description-Chief Trade and Industry
Specialist
Region 9
• Organizational Charts of the Regional Office 9 and the Provincial
Office
• Regional Memorandum Order No. 46 Series of 2023- Creation of
the Expanded DTI IX Quality Management System Structure.
Composed of Advisory Board (ExCom- RD/ARD, all Provincial
Directors) and QMS IX Development Committee with the ARD as
the QMR and PDs as the Deputy QMRs, chair and members of the
Internal Quality Auditors team, Quality Coordinator, and
Complaints Desk Officers.
Region 10
• QMS Functional Charts of the Regional Office 9 and the Provincial
Office
Region 11
• Regional Office Order No. 139 series of 2023 dated October 13,
2023. Reconstitution of the DTI 11 QMS Team signed and approved
by RD Maria Belenda Q. Ambi
• Regional Office Order No. 4084 series of 2023 dated July 3, 2023.
Updated Organizational Structure and Staff Assignment of DTI
Regional Office Personnel
• Competency Based Job Description-Administrative Officer II
Region 12
Regional Memo order (RMO- 117A series of 2023- dated 16 August 2023)
) was issued to reconstitute DTI Region 12 QMS Team under the One DTI
ISO, to ensure the effective implementation of the Region’s QMS. The
Regional Top Management constitute the QMS Team, from the Regional
Director to Provincial Directors, Division Chiefs.
The Management Review Committee responsibilities and Functions were
defined such as:
- Review of the QMS at planned intervals to ensure continuing
suitability, adequacy, and effectiveness
Required Management Inputs was part of the Memo.
The latest organizational Chart of the Region was shared with the position
and names of the position holder.
CARAGA
Regional Office Order No. 2023-07-01 dated 24 July 2023 was issued to
update the composition of the DTI-Caraga QMS Team.
The top Management of the DTI Caraga which is also the Regional
Management Committee is composed of the following:
1. Gay A. Tidaldo – Regional Director
2. Brenda B. Corvera – Asst. Regional Director
NCR
The QMR is responsible to oversee the effective implementation of the
QMS for the NCRO that includes processes such as:
1. Issuance of BMBE Registration
2. BNR
3. Conduct of Training
6 Planning Yes No
6.1 Actions to address risks and opportunities
The determined relevant issues (internal and external) and the requirements
6.1.1 When planning for the quality management system, the
of interested parties were considered in the updated Risk Register and the
organization shall consider the issues referred to in 4.1 and
Opportunity Register of the concerned process/service. Existing controls to
the requirements referred to in 4.2 and determine the risks
address risks and actions being taken for opportunities were defined in the
and opportunities that need to be addressed to: a) give
said Registers.
assurance that the quality management system can achieve
Assessments of risks and opportunities arising from the identified relevant
its intended result(s); b) enhance desirable effects; c) prevent,
issues and requirements of interested parties were carried out in matrices
or reduce, undesired effects; d) achieve improvement.
using criteria that followed probability and impact scoring to determine
priorities in addressing them thru evaluation of priority level:
6.1.2 The organization shall plan: a) actions to address these
• Risk Assessment Rating from 1 to 3 (1-Low, 2-Medium, 3-High).
risks and opportunities; b) how to: 1) integrate and implement
Ratings 5 to 6 (1st Priority) and 3 to 4 (2nd Priority) need an action
the actions into its quality management system processes (see
plan.
4.4); 2) evaluate the effectiveness of these actions. Actions
OFI-02. Risk/s are also present in positive issues and shall be determined
accordingly in the “SWOT Analysis” of the various offices of the DTI
Provincial and Regional Offices.
Region 2
Risk and Opportunities Registers were updated last September 29, 2023.
Examples:
- Price Monitoring- Isabela Provincial Office: for the risk of limited no. of
business establishments monitored, the existing control is mandatory price
monitoring workload of JBCs
- Accreditation of SRE- Nueva Vizcaya Provincial Office: for the opportunity
of good image of DTI, the action is advocate clients’ continued compliance
to accreditation.
Region 3, CAR
• The risks and opportunities were determined in consideration of the
internal and external issues as well as the needs and expectations of the
interested parties. Sampled process was the processing of claims.
• The documented information being retained were the Risk Registry which
was updated as of 3rd quarter of 2023 and consist of risk identification,
• The action plans for the risks and opportunities which were labeled as
risk and opportunity treatment were being evaluated for its effectiveness
on quarterly frequency.
Region 4A
From the determination of the issues and concerns, plus the identification
of interested parties with their needs and expectations, customer
satisfaction surveys, complaints and from the Department’s direction,
mandate (globally competitive and innovative industry), mission/vision
(creation of business which has the objectives, goals, targets, control
program, new control program, responsibility, frequency of monitoring as
well as evaluation of performances.
Region 4B:
As a result of review of information to the internal and external issues, and
relevant interested and their requirement, risks and opportunities are
identified and documented in the Risk Registry and Opportunity Registry.
Taking in consideration the importance of this process to the quality
management system. The organization actions to give assurance that the
quality management system will achieve its intended result, enhance
Action plans to address risks and opportunities are identified as well. This
is being monitored and reviewed on a quarterly basis and being discussed
during the management review. Examples of these action plans are: (1)
non-availability of concerned staff; implement succession planning, (2)
quality of report not met; indicate source of data and as of date, and (3)
non-availability of approving authority; check schedule of approving
authority, and authorize use of e-signature. Evaluation of urgency for
addressing the risks and opportunities is being done using the evaluation
criteria established.
Region 5
The identification of risks and opportunities, based on the Stakeholders
Analysis, is done at the Process Level (i.e. Provincial Office and Divisions
[Business Development, Consumer Protection, and Administrative and
Financial Management]).
As an example of this. the risks and opportunities relevant to the process
Consumer Complaint Resolution was presented. The risks and opportunities
that were identified addressed a need and/or expectation of an interested
party.
Actions to address risks and opportunities were seen in the Risks
Registries and Opportunity Registries of the Process. For
Opportunities, the Process identified their Opportunities as First
Priority (Prioritize and Pursue Action).
The Risk Register of the Process identified risks that were traceable
to the Process-level Stakeholders Analysis. Actions to address
Risks—Existing Controls—were seen in the Register as well as the
result of the quarterly monitoring of the effectiveness of the Existing
Controls. The Process Owner identified New Actions for the Risk
“Filing of Administrative Case Against DTI Personnel” even if existing
controls were seen to be effective; this is meant to enhance the
existing control.
Like the Stakeholders Analysis the identification of risks and opportunities,
based on the SWOT Analysis, is done at the Process Level (i.e. Provincial
Office and Divisions [Business Development, Consumer Protection, and
Administrative and Financial Management])
As an example of this. the risks and opportunities relevant to the process
Business Counseling was presented. The risks and opportunities that were
identified addressed a Strength, Weakness, Opportunity, and Threat.
Actions to address risks and opportunities were seen in the Risks
Registries and Opportunity Registries of the Process.
Region 6
The above-sampled issues (SWOT) of the region were traceable from the
process, in which the process owner determines the risks and opportunities
in its Risk Register and Opportunity Register. Examples are:
- Issuance of Sales Promo Permit- for the weakness of
unprogrammed activities downloaded to the region/provinces
affecting absorptive capacities of a lean organization, the risk
identified was delay in the processing of permit. Existing
controls are designation of alternate SPO, training of DMOs, and
adjustment of schedules with the alternate SPO.
- Complaints Handling- for the opportunity of new technology, the
action is the use of online platform other than Zoom for virtual
hearings and conferences.
Region 7
A guide on determining issues vs risks and opportunities was shared, Risk
identification, risk assessment, risk treatment and risks monitoring.
The Risk Register as of 2023 Quarter 4, as an example – IDD was shared.
There were determined 1st Priority – Data not available at source, inadequate
data processing capability, and 2nd Priority - Incomplete and inaccurate data,
high expectation of external clients. Existing controls were determined, new
action plans defined responsibility and timeline determined and results risk
monitoring per quarter was seen.
Region 8
• Risk and Opportunities Registers-Leyte Provincial Office updated
September 29 2023. Results of assessment showed that there was a total
of four (4) opportunities in 1st priority level and four (4) high risks.
• Planned action for addressing risks and opportunities were seen in “Risk
Treatment”. Action plans were combination of new and existing
operational controls.
Region 9
The above-sampled issues (SWOT) of the region were traceable from the
process, in which the process owner determines the risks and opportunities
in its Risk Register and Opportunity Register. Examples are:
- Business Counseling (Zamboanga City Office)- the risk of health
hazard from the threat of public health disasters and unforeseen
natural calamities has an existing control of conducting online
coaching.
- Price Monitoring (Zamboanga City Office)- for the opportunity of
well-regulated business environment with high compliance rate,
the action is nomination of compliant establishments for BAGWIS
Awards.
Region 10
Risk and Opportunities Registers were updated last October 31, 2023.
Examples:
- Consumer Advocacy- for the risk of delay or
postponement/cancellation in the holding of awareness-raising
Region 11
• Risk and Opportunities Registers-Davao Oriental updated September 30,
2023. Results of assessment showed that there were a total of five (5)
opportunities in 2nd priority level and zero (0) high and medium risk.
• Risk and Opportunities Registers-Davao De Oro updated September 30,
2023. Results of assessment showed that there were a total of five (5)
opportunities in 1st priority level and One (1) high risk.
• Planned action for addressing risks and opportunities were seen in “Risk
Treatment”. Action plans were a combination of new and existing
operational controls.
Region 12
Opportunities were identified for the issues determined and criteria for rating
were likewise defined as Probability and Severity. Opportunity rated as high
is prioritized and pursued with action plans, while those rated as 2nd priority
are considered for future actions.
CARAGA
The identified associated risk and opportunities from the SWOT and PESTLE
were presented for relevant functions. Examples of Risk and opportunity
registers reviewed are for:
• Conduct of Trade Fair – ROG/Caraga/AGusan del Norte
From the Opportunity Register dated 17 October 2023, 1st priority was
identified on the closure of training gaps for clients. The results showed High
CSF rating with VS rating. The focus group discussion was confirmed
regularly conducted to discussion resulting to needed training determined
through the TNA.
For the Risk Register for the conduct of training, 1 first priority risk related
to delay in the implementation of training program due to procurement of
needed food, supplies, training providers was identified with corresponding
action plan.
Business Counselling
• 90% of BC services rendered within 1 hour
• 98% of clients rated the BC process as satisfactory or better
Price monitoring
• prices are reasonable, effective and efficient of handling customers
complaint under the consumers act, ensure filing of cases with an
airtight evidence.
BMBE Registration
• 90% of BMBE certificate issued within prescribed time
• Zero typo error for certificate
• 90% satisfied customer or better
Regional Office - HR
• 80% Personnel capacitated (70-20-10) learning intervention
• 80% of client who rate the Training and Development process as
satisfactory or better
Region 4B:
Documented quality objectives and targets are available at various
functional groups audited during the audit. Based on the reviewed
documented information these quality objectives and targets are
consistent with the quality police, measurable, taking in consideration
relevant applicable documented information, relevant to the conformity
of service being provided, being monitored based on the agreed
Examples of these quality objectives seen and reviewed during the audit
are the following:
Consumer Advocacy: 65 consumer advocacy activities, 80% customer
satisfaction, and four (4) consumer advocacy material
produced/services provided.
Trade and Industry Information: 90% commitment to customer
satisfaction, 100% compliance to RA 11032, and 100% compliance to
quality requirement.
Business Counselling: 100% of request for business counselling
provided with assistance within the prescribe period, and 90% customer
satisfaction.
Business Name Registration: 90% of BN Registration processed
within the prescribe process cycle time.
Conduct of Trade Fair: 95 MSMEs Assisted.
Issuance of Sales Promo Permit: 99% of Sales Promo Permit issued
within the prescribe period.
Procurement: Timely submission of reportorial requirement, and 100%
accomplishment of IAR.
Procurement (RO)
Business Counselling
• 90% of Business Counselling Services rendered within 1 hour
• 98% of clients rated the process as Satisfactory or better
Business Counselling
• 90% of business counselling services rendered within 1 hour –
reported 100% monthly accomplishment
• 98% of clients rated Satisfactory or better – achieved
Action plans for achieving the objectives were also determined and
documented in the “Operational Plan” of the QOP of the respective
process groups.
OFI 02: The target of 90% satisfied customers of the BMBE Registration
process translates that the organization is accepting that 10% of its
customers may not satisfied with the service. This runs contrary to the DTI
Quality Policy for providing quality service. The 10% unsatisfied customers
(if the rating is valid or with basis) translates to an indirect customer
complaint which is considered as a nonconformity under ISO 9001:2015.
A new set of target was determined in the QOP revision for the Conduct
of Training process (Revision 2, Effectivity Date; August 1, 2023). The
new targets are as follows:
Target: 90% of trainings conducted as scheduled/planned per
semester based on the approved Annual Work and
Financial Plan.
Target: 98% of MSMEs rate the conduct of training as
satisfactory
or better.
Action plans for achieving the objectives were also determined and
documented in the “Operational Plan” of the QOP of the respective
process groups.
Price Monitoring
Quality Objective: Ensure compliance of firms with the Price Act
Target: 95% of firms monitored compliance with Price Act
Business Counselling
• 90% of Business Counselling Services rendered within 1 hour
• 98% of clients rated the process as Satisfactory or better
Business Counselling
• 90% of Business Counselling Services rendered within 1 hour
• 98% of clients rated the process as Satisfactory or better
Conduct of Training
• 90% of training conducted as scheduled/planned per semester based
approved annual work and financial plan
• 90% of participants who rate the conduct of training process
satisfactory or better.
Region 11
Consumer Protection Division
• Complaints resolved within the prescribed time target – 100%
resolution rate.
• Resolution of consumer complaints; target – 98% of decisions
rendered within 15 working days upon receipt of all pleading and
document
Business Consultancy
Business Counselling
• Build Productivity and Efficiency of MSME; target = 90% of
business counselling services rendered within 1 hour.
CARAGA
Regional Office Infrastructure
a) 100% maintenance of infrastructure and vehicles
b) 100% inspected areas
Regional Office IT
c) 100% PMS activity conducted
d) 100% resolution rate of IT concerns
e) Satisfactory or better client satisfaction rating
f) 98% system uptime
For the BMBE registration process for Area 4, the established QOPs
presented are:
1. Ensure timely processing of BMBE registration with target of 100% of
BMBE processed within prescribed time (8 hours as per ARTA)
NCR – Area 3
Conduct of Training
• Build Productivity and Efficiency of MSM; Target = 90% of
trainings conducted as scheduled/planned per semester
based on Annual Work and Financial Plan.
NCR – Area 4
Business Counselling
• Build productivity and efficiency of MSME; target = 100%
business counselling services rendered within 1 hour.
Monitoring of FTL
• Ensure compliance of firms to FTL; Target = 85% of the
firms monitored are compliant to Fair Trade Laws.
For the provision of trade and industry information process, the Objective
is to provide accurate, timely, updated, and relevant trade, investment,
and industry-related knowledge, products, and services. The Targets are
providing the required information within the prescribed ARTA and FOI
turn-around-time/processing time. For requests for information, the
commitment is zero error (facts, typo, grammar, and spelling). The
objective evidence for having achieved the previous two (2) Objectives is
for the Process to achieve at least 90% of its clients rating the information
received as satisfactory or higher.
For the process on the Conduct of Trade Fairs, the Objectives focused on
providing market access to MSMEs. The Targets are PhP 25 M is generated
sales through the conduct of one(1) trade fair and with the participation of
at least 146 MSME exhibitors. Additionally, the Client satisfaction target is
for at least 90% of the MSME exhibitors to rate the fair as Satisfactory or
higher.
Region 12
Resources are provided, for example for the implementation of the QMS
through the provision of resources in order to achieve its objectives and
targets as seen in the planning documents.
Equipment
Vehicles
➢ Schedule of Preventive Maintenance of Vehicles
➢ Repair History Report
➢ Vehicle Preventive Maintenance Log
ICT
➢ PM for Dashboard and updating of laptops
CAR
- Annual Preventive PM Plan for Equipment as evidenced by the
Inspection and Acceptance Report for the maintenance services
provided for the ACU.
- Vehicle Preventive Maintenance Log
- Annual Matrix of Task and Assignments of Janitorial Personnel as
evidenced by the Monthly Cleaning Checklist
CARAGA
The Regional Office CARAGA rent the building and the building owner is
the one responsible for the maintenance of the building including the fire
protection system / fire alarm.
There are 3 motor vehicles appropriate maintenance schedule every
5000 km. the assigned derive conducts daily checking as seen from the
log book where activities and items checked are recorded.
Region 6
- Preventive Maintenance Checklist for Airconditioner for Year 2023:
twice every quarter for filter cleaning; once every quarter for
general cleaning, adjusting noise level, brushing of evaporator fins
and fan blower, etc.- indicates the particular months these were
done as prepared by the Supply Officer, inspected by the Work
Environment & Infrastructure Unit Head, and approved by FAD
Chief
- Certificate of Completed and Satisfactory Service for Iloilo Cooled
Air Service Center for services rendered from April to June 2023
- Purchase Request and Job Order for the airconditioner maintenance
- Vehicle Maintenance Checklist- for Toyota Rush 2019 Model Plate
No, A9-U297- indicates the particular parts for replacement/change
based on mileage, e.g., engine oil every 10K kms.; air filter every
20K kms; daily check of battery, radiator, fuel leakage, tires,
gauges, headlights, etc.
- Repair History Report of Toyota Rush 2019 Model
- Monthly Report of Official Travels- indicates the distance travelled in
kms., gasoline consumed, and odometer reading
- Weekly Janitorial Services Checklist- prepared by Utility man and
inspected by Admin Officer
Minor Nonconformity:
Compliance to the Maintenance Plan of Vehicles has not been
demonstrated as per sampled vehicle Toyota Rush which has already a
mileage of 64Kms.as of October 2023. The maintenance tasks for the ff.
parts/components were not seen:
- Air filter and fuel filter every 20K kms.
- Brake pads and transmission oil/gear oil every 40K kms.
- Coolant every 40K kms.
- Fan belt/aircon belt every 50K kms.
Moreover, the daily maintenance tasks done by the service driver has no
evidence that it was checked and inspected.
OFI 02: The development of the Succession Plan may also include the
identification of the critical knowledges that needs to be transferred.
Region 9
The determination and maintenance of knowledge necessary for the
operation of the processes to ensure conformity of services were ensured
through the following
➢ established work processes and procedures that each section
prepared.
➢ Integrated HR information system and learning action plan
➢ HR related trainings and conferences.
Region 12
DTI Region 12 has a robust system of knowledge preservation necessary
for the operation of its processes and to achieve conformity of products
and services as shared in presentation materials.
DTI Region 12 also does sessions with the staff such as Monday feedback
in Sa Lunes Alamin Mo (SLAM) , Gawad Pamana - sharing of Best
Practices from those who retired, and to ensure continuity of information
sharing, a clearance needs to be approved as a turnover system. Records
of these were shared.
7.2 Competence The organization has established process procedures in determining and
The organization shall: a) determine the necessary reviewing competencies of the employees as documented in Training and
competence of person(s) doing work under its control that Development (PHR-02 version 3, effective date August 31, 2023).
affects the performance and effectiveness of the quality Evaluation of actual competencies of an employee has been evidenced
management system; b) ensure that these persons are by the Development Needs Analysis. A rating scale system (1-Basic, 2-
competent on the basis of appropriate education, training, or
Intermediate and 3-Advance) was established in order to determine the
experience; c) where applicable, take actions to acquire the
necessary competence, and evaluate the effectiveness of the need for intervention (70% workplace learning, 20% social learning and
actions taken; d) retain appropriate documented information 10% structural learning) and close competency gaps.
as evidence of competence. NOTE Applicable actions can
include, for example, the provision of training to, the DTI – Regional Office 1 - Human Resource.
mentoring of, or the reassignment of currently employed
persons; or the hiring or contracting of competent persons. The needed competencies for the various personnel of the DTI Regional
Office 1 personnel were identified in the “Job Profile” document of the
various work positions. An example seen are the Job Profile of the
“Supervising Trade Industry Development Specialist” and “Senior Trade
Industry Development Specialist”.
Region 9
The individual competency record and 2023 Recommended Training Path
based on 2021 PDAP and 2023 Recommended Training Path Competency
Level based on 2021 PDAP was presented.
The Learning Action and Monitoring evaluation for the 2022 training
attended, i.e., Delivering Exceptional Service Standard was shared with
the results determined.
CARAGA
The organization demonstrated effective implementation of corrective
actions as evident in HRIS Online System, Learning Application Plan (LAP)
and Professional Development Action Plan CY 2023. Team 02/S1-CARAGA
recommended CLOSED.
The functional objectives of the various process groups and units of the
regional office were appropriately cascaded in the Individual Performance
Commitment Review (IPCR) or “Individual Dashboard” of the various
personnel.
Region 3
➢ The quality policy as newly signed were provided and communicated to
all the region and cascading to all of its employees.
Region 4B:
Awareness and understanding of the quality policy, objectives and targets
and processes of the quality management system is confirmed during the
audit interview.
Region 5
Region 6
Awareness through the conduct of orientation to the new employees were
seen in the documented information.
Region 9
The awareness of personnel was ensured through recitation of the quality
policy during the flag ceremony, while quality objectives were being
communicated based on QOP, PDCR and IPCR.
Region 12
Awareness sessions on a) the quality policy; b) relevant quality objectives;
c) their contribution to the effectiveness of the quality management
system including the benefits of improved performance; d) the implications
of not conforming with the quality management system requirements were
shared in its Share Point – One DTI QMS. All Employees can access to
this.
CAR
The program for employee’s awareness is ONE-Program that requires new
employees to attend on-line training. This include QMS orientation with
the Division Heads and QMS module.
The PMS of the Central Office also conducts QMS awareness training.
7.5 Documented Information Requirements for the control of the documented information process are
7.5.1 General established in “Control of Documents” (PR-CD-01 version 3, effective date
The organization’s quality management system shall include:
18 October 2021) and “Control of Records” (GL-CR-01 version 3 effective
a) documented information required by this International
Standard; b) documented information determined by the date 29 October 2021). This procedure covers documents of external
organization as being necessary for the effectiveness of the origin. The procedure covers the activities regarding Curation/Updating of
quality management system. NOTE The extent of documented Documents, Review and Approval of QMS Documents, and Control and
information for a quality management system can differ from Distribution of QMS Documents.
one organization to another due to: — the size of
Control of documented information was verified and trailed in the samples
organization and its type of activities, processes, products and
services; — the complexity of processes and their of the following document and records:
interactions; — the competence of persons.
OFI 02: Adequacy in including the vital records of the QMS in the “Master
List of Records” needs to be consider (at AFMD, records such as the SWOT
Analysis, Stakeholder Analysis, Risk Register, Opportunity Register, Job
Profile, Learning and Development Interventions Tracking Database).
Consider also reviewing whether the “DTI Records Disposition Schedule”
needs to be updated for the inclusion of these QMS records.
Region 12
DTI Region 12 has established its QMS documentation as required by the
standard. These are defined in its procedure Control of Documents, PR-CD-
01 Version 3.
8 OPERATION
8.1 Operational planning and control DTI – Region 7: Negros Oriental Provincial Office
The organization shall plan, implement and control the (Conduct of Training / Accreditation of Service and Repair and
processes (see 4.4) needed to meet the requirements for the Enterprises / Issuance of BMBE Registration / Monitoring and
provision of products and services, and to implement the Enforcement of Fair Trade Law)
actions determined in Clause 6, by: a) determining the
requirements for the products and services; b) establishing Determined process requirements and controls for the provision of
criteria for: 1) the processes; 2) the acceptance of products services at the DTI Negros Oriental Provincial Office were defined in the
and services; c) determining the resources needed to achieve documented process specific procedures. The various service processes is
conformity to the product and service requirements; d) also guided by the related regulatory requirements (ex. RA 7581 - Price
implementing control of the processes in accordance with the Act, RA 7394 – Price Tag Law, RA 4109 – Standards Law, etc.).
criteria; e) determining, maintaining and retaining The established procedures were developed/created at the DTI Central
documented information to the extent necessary: 1) to have Office.
confidence that the processes have been carried out as The documented process procedures are the following:
planned; 2) to demonstrate the conformity of products and • Conduct of Training (PR-CT-01; Version 1; September 30, 2021).
services to their requirements. The output of this planning
The quality parameters for the provision of the DTI services is expressed
through the timeliness of the service. The timeliness standard for the
various processes were established in the process cycle time that were
committed in the DTI’s Citizen’s Charter. The timeliness of the service is
monitored by the concerned process group at every transaction that it
receives.
The quality parameters for the provision of the DTI services is expressed
through the timeliness of the service. The timeliness standard for the
various processes were established in the process cycle time that were
committed in the DTI’s Citizen’s Charter. The timeliness of the service is
monitored by the concerned process group at every transaction that it
receives.
An overall adequate implementation to the requirements of the process
procedure were seen in the sampled transaction/process records.
Evidences of the process implementation were seen in the following:
- Conduct of Training.
The planned year 2023 trainings for the MSMEs were identified in the
Annual Work and Financial Plan which includes the “Comprehensive
Agrarian Reform Program Work Plan for CY 2023”. The planned trainings
for year 2023 were also presented in the “Indicative Calendar of Events
– 2023”.
The implemented trainings for the month of August 2023 includes the
following:
• Skills Training on Banana and Root Crop Processing (August 8-9,
2023).
• Skills Training on Octopus Processing (August 10-11, 2023).
• Skills Training on Coconut Twigs handicraft with EDT on Costing
and Pricing (August 24-25, 2023).
• Skills Training on Squash Processing (August 28-29, 2023).
The required report after the conduct of the training was appropriately
seen in the corresponding “Training/Seminar/Workshop Post Activity
Report”.
The conduct of the customer satisfaction measurement to the training
provided was also evident in the “Customer Satisfaction Feedback
Report”. The “Customer Satisfaction Feedback Report”, for the
conducted August 2023 customer satisfaction survey, showed ratings
ranging from “Satisfactory” to “Very Satisfactory”.
Business Counseling:
• A business counseling logsheet is being maintained to track down
the services rendered and the clients served. The logsheet has the
date, time in, client in, complete name, address, business name,
turn around, surveys and type of services required. Example is
Alejandro Gato, business name-A.G Odias Sari-sari Store,
turnaround time-11minutes and with a satisfactory remark on the
service offered.
• Type of consultancy offered are:
o Finance,
o Business permit registration,
Conduct of Training:
j) Monthly planned training for the year 2023 was presented. The
identified training related to skills, entrepreneurial.
k) Consultations done with the industry and requests derived from the
CSF were seen part of the basis for the planned training.
i) Ex from the 2022 feedback.
l) Post activity report from the conducted training was presented for
examples from financial literacy training done October 6, 2023 for
Barangay Laang, Langangilang. This training was requested by the
stakeholders to the Negosyo Center Representative. Actual
participants of 15 was achieved.
m) Customer satisfaction feedback was seen with rating of VS or
equivalent of 4 and 100% achievement based on ARTA criteria.
The information provided are sourced from publicly available website. The
process does not compromise the data privacy of client.
Prior to release of the completed TII the review and approval of the
immediate supervisor is necessary.
Region 2
Supplier’s performance evaluation is done per transaction. Results of
supplier performance evaluation were consolidated and communicated
semi-annually (semestral).
The latest results seen was for the 1 st Sem of 2023. Forty-Nine (49) suppliers
with transactions were evaluated and 2 suppliers received failed ratings
(Chi-ces Marketing and Dakin Hardware). Necessary actions were
implemented to suppliers not meeting the passing rate. Passing Score is
80% and above
Region 3
In general, the Procurement process/Section (under the Finance and
Administrative Division) is responsible for the purchase of products and
services (e.g. consultancy, maintenance, infrastructure) required by the
Regional Office.
Region 4A
The procurement for process for the Regional Office 4A was confirmed
according to the delegated authority and allowed procurement modes such
as the Competitive Bidding and alternative move of procurement defined
under RA 9184 and its IRR.
Region 4B:
External service provider for the processes, products, and services is
within the control of the organization to ensure conformance to their own
requirement. Criteria for evaluation, selection, monitoring of performance,
and re-evaluation if necessary is established and defined in the
documented procedure GI-GAS-01 revision 04 effective 15 September
2022 “Supplier Management”.
Region 5
DTI- Region 5 has ensured that externally provided products and services
conform to requirements and has determined controls to be applied to
these externally provided products and services.
DTI Region 5 has determined and applied the criteria for the evaluation,
selection, monitoring of performance, and re-evaluation of external
providers, based on their ability to provide products and services in
accordance with requirements.
The organization has retained documented information of these activities
and any necessary actions arising from the evaluations. (see 8.4.2/8.4.3
results of audit).
The suppliers of products and services were seen accordingly sourced from
the list of PhilGEPS accredited vendors.
The suppliers of products and services were seen accordingly sourced from
the list of PhilGEPS accredited vendors.
Region 10
The process is also primarily in accordance with the requirements RA9184
/ COA Rule and Regulations, DBM Rules and Regulations and GPPB.
The procurement planning was conducted with the PPMP and APP at the
output. This is an annual process where all APP is consolidated by the
Regional Office.
Mode of procurement at the Regional Office is covers competitive bidding,
while the alternative mode of procurement is applicable at the provincial
offices.
Region 12
The system and policies for procurement that was seen established was
Supplier Management, version 4, dated September 15, 2022 with
document code GL-GAS-01. This document is in compliance with RA 9184
and its IRR.
The process specify the controls for the procurement process as well as
the evaluation and re-evaluation of the external providers.
Region 2
Controls on suppliers can be reflected in the Contracts/Purchase
Order/Terms of Reference/ Service Level Agreement/MOA/Project
Specifications/and other similar documented information
Region 3
Region 4A
The following established controls were confirmed adequately implemented
as seen from samples of procurement process presented.
1. Title of Project : Audio, Lighting, and LED Wall Video/Playback System
for Kalakal Calabarzon 2023.
a. Terms of Reference prepared by the Process Owner with the
rationale.
b. Philgeps posting with reference number 9787218, with ABC of
Php 365,000.00
c. Abstract of Bids as Calculated
d. Notice of Single Calculated Bid with the information for the
required document for submission such as:
i. Certificate of Philgeps Registration (Platinum
Membership) of PhilGeps Registration Number (Red
Membership)
ii. Certificate of Business Name Registration
iii. Valid Business Permit
iv. Original government issued ID
v. Other relevant documents
e. Post Qualification Report with validation of relevant document
i. Financial and Technical specifications
ii. Past Performance evaluation
iii. Post Qualification Team
iv. RCAMP resolution to award.
f. Notice of Award signed by the HOPE
Region 5
DTI Region 5 has ensured that externally provided products and services
have the ability to consistently deliver conforming products and services
through compliance with the Procurement Act and the conduct of Supplier
Performance Evaluation.
Criteria for evaluation (only external providers listed in PHILGEPS are
considered); performance re-evaluation is conducted every delivery and
evaluated every 6 months
Criteria for re- evaluation are Quality of products/service delivered;
Timeliness of Delivery; and after Sales Service. Example shown was that
for January-June 2023.
For external sourced service providers, e.g. Security – a service contract
every 3 years; and for Janitorial services – a Job Order is issued
The DTI Region 7 Office’s Bids and Awards Committee (BAC) is responsible
for the bidding preparation and bid review and evaluation. The
composition of the BAC is identified in the issued Office Order of the DTI
Region 7 Director.
The material/supplies requirements of the Regional Office were seen
identified in the Regional Office’s approved “Annual Procurement Plan for
2023”.
The suppliers of products and services were seen accordingly sourced from
the list of PhilGEPS accredited vendors.
The suppliers of products and services were seen accordingly sourced from
the list of PhilGEPS accredited vendors.
Region 10
The selection of the external provider is according to their eligibility in
compliance to RA 9184. This will require providers to comply with required
legal documents. Technical and financial (Net Financial Contracting
Capacity).
The financial proposals are open only upon satisfaction of eligibility
documents.
The BAC evaluates all the submitted document and decide the
qualification of external providers that is only either passed or failed
according to the submitted technical document.
Post qualification by the TWG with the BAC follows upon confirmation
of the eligibility of the external provider.
Other document seen and review for adequacy were:
• Contracts
• PO/TOR
• SLA
Region 11
Suppliers’ performances were being evaluated twice a year available records
showed for the period of January to June 2023 with two service providers
evaluated with excellent performance.
Notice of below par performance were communicated to concern external
providers for their continual improvement e.g. Cotabato EMS Pasta and Rolls
Region 12
All procurements are in accordance with the established PPMP/APP for the
year 2023. Allocation of fund to the Provincial offices is according to the
delegated authority for alternative mode of procurement.
Purchases of Php50K and above requires PhilGeps posting. There was no
recorded public bidding yet for the year 2023.
Region 4A
The accuracy of the information is provided by the user or process owner
and specified on the TOR-Terms of Reference for services as well as the
Purchase Requisition. This is also what is indicated on the corresponding
Purchase Order.
Region 5
Purchase Request is reviewed and approved prior to conduct of Canvassing
and awarding of Purchase Order.
Examples for records of Small Value Purchase was shared.
- Purchase Request No. RO2023-00176;
- Request for Quotation was to 3 prospective bidders,
- A canvas sheet showing the lowest bidder, and
Region 10
The accuracy of the information provided to the external providers is
assured from the preparation of purchase request, Terms of Reference,
Purchase Order or Contract, Technical Specifications. Other requirements
normally defined may include the following:
• Criteria for the approval of products and services
• Competence including qualification for services to be rendered
• Arrangement for interactions, communication, and reporting
• Any other controlled to be applied by the office (DTI)
• The verification and validation activities, inspection required
Region 11
Region 12
The accuracy of the information provided to the external providers is
assured from the Purchase Request, Terms of Reference, Purchase Order,
PhilGeps posting among others.
9 Performance Evaluation
9.1 Monitoring, Measurement, Analysis and Evaluation Region 1
9.1.1 General The organization determines the need in monitoring, measure, analyzing,
The organization shall determine: a) what needs to be and evaluating Quality Objectives/ Customer Satisfaction rating/ Supplier
monitored and measured; b) the methods for monitoring, Performance Evaluation and Results of Internal Audits.
measurement, analysis and evaluation needed to ensure valid
results; c) when the monitoring and measuring shall be Region 2
performed; d) when the results from monitoring and The organization has demonstrated monitoring, measurement and analysis
measurement shall be analysed and evaluated. The of the following:
organization shall evaluate the performance and the • status of the functional Quality objectives and the effectiveness of the
effectiveness of the quality management system. The documented procedures related to the processes audited. Actual
organization shall retain appropriate documented information attainment of targets were reported through “Process Performance
as evidence of the results. Monitoring” (FM-PL-08).
• Survey and feedback analysis were seen related to customer
satisfaction
• Records of measurement ( ex., QA activities, Business Counseling
Log, FOI Summary, ARTA Overall Scoring)
• Internal audit results
• Conformity to the services was monitored
Region 4A
The DTI Regional Office 4A has established the monitoring, measurement,
analysis and evaluation of data relevant to its actual performance against
the QOP and the actual process versus planned arrangements. Example:
Price Monitoring:
• The Percentage of firms complying w/ SRP was regularly monitored
. As of Sept. 2023, the actual performances was 270 stores
inspected.
Region 4B:
Based on the presented documented information. Result of monitoring,
measurement, analysis, and evaluation of established quality objectives
and targets the various functional groups audited achieved the targets.
1. In the monthly monitoring of quality objectives at Romblon
Provincial Office, unmet target was observed for the month of
August 2023 and September 2023. However, as explained the
target for the year is achieved. Revisit this methodology if this is
align with the organization’s requirement for the issuance of
corrective action report.
Region 5
As seen in the defined inputs to Management Review, results of the
monitoring of the effectiveness of actions to address risks and
Region 6
The organization demonstrates monitoring, measurement and analysis
of the following:
• status of the functional Quality objectives and the effectiveness of
the documented procedure
• Survey and feedback analysis were seen related to customer
satisfaction
• Records of measurement were seen, such as QA activities, price
monitoring reports, Business Counseling Log, Complaints Log
• Internal audit results
Region 7
Organizational outcomes Report Cards of the processes of DTI Cebu
Provincial Offices were seen.
Process Performance Monitoring for FY 2023 were shared showing actual
accomplishment versus target for the months January to September 2023,
for all the processes audited.
- Conduct of Training.
The number of MSMEs created from January to September 2023 ranges
from a low of 30 MSMEs for the month July to a high of 105 MSMEs
during the month of May 2023.
The attainment of the Provincial Office to the target of the objective is
summed-up at the DTI Region 7 Office.
- Conduct of Training.
The revised target for the Conduct of Training process (Target of 90%
of trainings conducted as scheduled/planned per semester based on the
approved Annual Work and Financial Plan; Target of 98% of MSMEs rate
the conduct of training as satisfactory or better) were evident for
Region 8, Region 11
DTI Region 8 and Region 11 demonstrated effective implementation of
monitoring and review of effectiveness of actions taken to address
significant risk and opportunities.
The monthly monitoring and measurements of actual performance against
targets were carried out by DTI Region 8-Samar Provincial Office. Actual
attainment of targets were reported through “Process Performance
Monitoring” (FM-PL-08). It was noted that monitoring and measurement
of new quality objectives and targets started in August 2023.
Evaluation of results showed that consistent attainment of targets from
August to September 2023 in Business Counselling, Price Monitoring and
Customer Complaints handling.
Region 9
The monthly monitoring and measurements of actual performance against
targets were carried out by DTI Region 9- Zamboanga City Provincial
Office. Actual attainment of targets were reported through “Process
Performance Monitoring” (FM-PL-08).
Evaluation of results was reported with consistent attainment of targets
from January to October 2023 in Business Counselling, Customer
Complaints handling, and Price Monitoring (however, pls. see verification
of previous NC on monitoring and measurement below). Measurement of
timeliness targets were seen in Business Consultancy Log and Complaints
Log. Other monitoring records shared were Template Worksheet for
Tabulating Responses for FM-CSF-01 (Citizens Charter Enrolled Services),
List of Supermarket/Hardware/Convenience Stores Monitored by DTO-ZCO
2023 and Price Monitoring Reports.
Region 10
The organization has determined the relevant information/data to be
monitored that will evidence the achievement of the Quality Objectives
and Targets, the realization of the plans and strategies as well as the
measurement from the implementation of the processes and other
relevant information. Example:
The monthly monitoring and measurements of actual performance against
targets were carried out by DTI Region 10- Bukidnon Provincial Office.
Actual attainment of targets of all the processes audited were reported
through “Process Performance Monitoring” (FM-PL-08). Evaluation of
results showed consistent attainment of targets from January to October
2023.
Region 12
The monitoring and evaluation of the actual performance against the set
QOP was demonstrated from the Quality Objectives and Plans performance
monitoring report (See Clause 6.2 for details).
For the Bataan Provincial Office, from January 2023 to September 2023,
the performance of the Consumer Protection Division was positive overall
based on the sampled Process Performance Monitoring reports for its
six(6) core processes. The actual performance data covered the period
January 2023 to September 2023. All Processes showed 100% actual
accomplishment.
Consumer Advocacy, Resolution of Customer Complaints,
Monitoring and Enforcement of Fair-Trade Laws, Price and Supply
Monitoring, Issuance of Sales Promotion Permit, and Service and
Repair Shop Enterprise Accreditation (there were no applications
received in August and September).
For those processes with performance commitments related to customer
feedback all achieved ratings of at least Satisfactory.
For the Tarlac Provincial Office, for the period January 2023 to September
2023, their performance was positive as for all of the three(3) processes
of the Business Development Division the Objectives and their individual
Targets were consistently achieved. For the BMBE registration process, no
application for BMBE registration was received after March 2023.
Region 12
Monitoring and Measurement of action Plans for risks and opportunities are
part of the Risk and Opportunities Register. Monitoring is done per quarter
and results were noted.
This covers several DTI services such as Business name registration/ Sales
Promo permit/ Service and repair Shop Accreditation
Region 2
Customer perception is measured thru the use of Customer Satisfaction
and Feedback (CSF) form, issued to client/customer
Criteria include, and may be related, but not limited to: promptness to
the following: responsiveness/ integrity/ reliability/ assurance/
communication/ costs/ access and facilities/ outcome and criteria from
Citizens’ charter
The results of the latest CSF showed respondents gave a Satisfactory-
Very Satisfactory rating. Rating is classified into Dissatisfied, Very
Dissatisfied, Satisfied, and Very Satisfied.
Shared during the audit was the CSF tabulation Sheet (consolidation) for
the month of October 2023 (99.43% = 3.98%) and Sept 2023
(99.15%= 3.97)
4. Reference documented information:
• Client Satisfaction Survey/ version 2/ Oct 1, 2023/ PR-CSF-01
• Tabulation of Monthly results
*Note: no valid complaints were received from 8888
Region 3
Providing guidance and defining the requirements for the planning, data
gathering, analysis methods, and evaluation criteria related to customer
feedback: Client Satisfaction Feedback (Document Code: PR-CSF-01,
Version-2, Date Effective: 01 September 2023). This procedure also covers
the receipt, validation, and handling of negative comments/complaints
coming from the survey.
Different Customer Satisfaction Feedback forms for selected Key Processes
(e.g. Accreditation of Service and Repair Enterprises and BMBE Registration)
and Support Processes (e.g. Conduct of Training {Face-to-Face or On-line]
and processing of Financial Claims) were prepared by the management of
the Regional Office. These forms are also used at the Provincial Office level.
CSF forms are either electronic/digital or hard/printed copies. These are
retrieved based on defined requirements. Retrieval rates for CSF forms
follow a structured retrieval requirement based on the number of clients.
For validated complaints/negative comments, a Request for Improvement
(RFI) is generated. Through this RFI, the complaint/negative comment is
addressed. Ratings of Dissatisfied or Very Dissatisfied required validation.
If valid, actions are determined, this includes the preparation and issuance
of and RFI.
The Client Satisfaction Feedback form for Accreditation of Service and
Repair Enterprises was presented. The general evaluation criteria are about
the Citizen’s Charter for the service being rated; the relevant Service Quality
Dimension (there is a total of eight[8] Service Quality Dimensions) such as
responsiveness and communication, integrity/accountability, reliability and
outcome, assurance, costs, and access and facilities; overall satisfaction
rating; and comments and suggestions (an important component is the
Region 4A
The Client Satisfaction rating for the whole region was confirmed
monitored for the whole Region 4A measured for all the 10 core processes
and support processes.
The monthly tabulated customer satisfaction rating was presented with
actual values recorded for Cavite, Laguna, Batangas, Rizal and Quezon.
The actual results seen was no lower than 90% except for 70.9% for the
Conduct of Trade Fair for Quezon for the month of February 2023. RFI (23-
R4A-QUE-RFI-01) was issued with correction and corrective action. The
effectiveness of action was confirmed with 100% attainment of Customer
Satisfaction rating by the month of August 2023.
Region 4B:
Customer perceptions of the degree to which their needs and expectations
have been fulfilled through customer satisfaction survey. Establish target
for customer satisfaction based on the scorecard is 98%. Revision of
process requirement is done last October 2023. In the presented result of
customer satisfaction rating is 3.96 with retrieval rate 99%. Criteria for
rating established are: access and facilities, communication,
responsiveness, reliability, integrity, cost, assurance, and outcome.
Parameters established are: very dissatisfied, dissatisfied, satisfied, and
Region 5
Customer Perception is known through the conduct of Customer Survey. A
Client Satisfaction feedback (CSF) process flow was shared, Key Services
and support processes were identified and respondents determined as well
as method of collection.
All processes audited defined the Customer Satisfaction Rating target.
Example of CSF presented were:
1) Processing of Claims – External Clients. A total of 2240 clients from
different units were given the CSF with retrieval rate of 98.41 versus
standard set rate of 90%. Standard Customer Satisfaction rating
is set at 90% with an actual rating of 97.56. The data was gathered from
January 1 to August 31, 2023.
2) Conduct of Training – January to May 2023 There was total of 10,216
clients with an average of CSF rating of 99.43%, and a retrieval rate of
100%
Region 6
Region 9
Customer Feedback Tabulation Summary – ARTA Overall Scoring = 99.10%
overall average = Outstanding; ARTA Service Quality Dimension; overall
rating = 92.25% = Very Satisfied on 100%bretrieval rate.
Region 11
The level of customer satisfaction was being determined twice through a
monthly monitoring of the CSF for each process and results were as
follows;
Region 12
Customers satisfaction was determined through a survey questionnaire
being responded by the recipient of services provided e.g. janitorial, driving,
maintenance property maintenance dated October 2023. The results showed
100% satisfaction rating the services provided.
NCR
The process for conducting as per version 1, Client Satisfaction Feedback,
PR-CSF-01, dated April 20, 2022.
The survey consists of administration of CSF to client, retrieval of CSF
and identification of actionable items for formulations of actions and
processing of the CSF responses by the process owners and submitted to
the NCRO. The consolidated NCRO CSF results was presented by month
and by Process with the number of respondents and average rating per
month per process. Seen was the rating for the period of January to
October 2023. The actual result per process was as follows:
1. BN –(All areas) – 98%
2. BMBE (All areas) – 99%
CAR
The consolidated customer satisfaction results from January to September
based on the previous guideline was presented. Quarterly summary was
presented with the following results:
1) January to September 2023 quarterly report for processes such as
BMBE/BNR/Consumer Complaints Handling/ Issuance of Sales Promo
Permits/ SRE/PETC/
a) Q3 Overall = 99% (no dissatisfied
b) January –May 2023 = 98% _
c) June 2023 – 99%
The overall performance for all the processes is above the target of 97%.
There was still no recorded complaint for the whole regional office.
CARAGA
FTEB
Customer Satisfaction Feedback Tabulation Summary was available for the
services; consumer complaints handling, accreditation of SRE, sales promo
and import regulation; the agency had achieved a YTD rating of 95.16% =
Very Satisfactory.
9.1.3 Analysis and evaluation Region 1
The organization shall analyse and evaluate appropriate data Analysis and evaluation were seen and verified. These help the
and information arising from monitoring and measurement. organization in decision making.
The results of analysis shall be used to evaluate: a) conformity Reference: Results of Data Analysis
of products and services; b) the degree of customer
satisfaction; c) the performance and effectiveness of the Regional Office 1 / Ilocos Norte/ La Union
quality management system; d) if planning has been Evaluation of monthly performance were sent and verified in the
implemented effectively; e) the effectiveness of actions taken Performance Governance System and QOP Performance Monitoring Sheet
to address risks and opportunities; f) the performance of Based on the documented information seen, identified objectives and
external providers; g) the need for improvements to the targets were all achieved in 2022. No unmet targets, that require Root
quality management system. NOTE Methods to analyse data cause analysis and corrective actions were noted
can include statistical techniques.
Region 2
Region 5
Preparation for the quarterly Management Reviews involves the gathering
of required data, analyzing, and evaluating these gathered data, and
presenting these to top-management. These are done by the concerned
Process Owners.
Region 6
The degree of Customer Satisfaction to the product/s of the organization
were presented in the Monitoring reports.
Region 7
Analysis of the degree of customer satisfaction; if planning has been
implemented effectively; and the effectiveness of actions taken to address
risks and opportunities were seen.
An example of Request for Improvement was seen as part of improvement
mechanism for the QMS.
Region 8, Region 11
1. Confirmed that review and evaluation of the effectiveness of actions
taken to address high risks and opportunities were evident in Minutes
of the Meeting. A quarterly monitoring of action plans was also
conducted by the organization. Records seen:
• DTI Region 8: DTI 8 CY 2023 3rd Quarter Management Review-
Minutes of the Meeting dated 6 October 2023.
• DTI Region 11: Management Review Record (FM-MR-01) dated
30 October 2023.
Region 9
The evaluation and analysis of the results of client satisfaction feedback
were evident in Summary and Analysis of Customer Satisfaction Feedback.
The CSF rating target was consistently achieved.
Region 10
The evaluation and analysis of the results of client satisfaction feedback
were evident in the in-house electronic CSF Analytics. The CSF rating
target was mostly achieved, except there was a dissatisfactory rating in
the Conduct of Trade Fair process, and this was supported/covered by RFI
for determination of correction, root cause and corrective action.
Bukidnon Provincial Office:
The evaluation arising from the monitoring and measurement of
accomplishments as shown in clause 9.1.1 above showed favorable
attainment of targets from January to October 2023 for Region 10-
Bukidnon P.O.
Actual accomplishments of the Region 10- Bukidnon Provincial Office
process owner were also seen in his PGS/Individual Dashboard.
Region 12
The organization has established the performance monitoring and
measurement system. This enable them to evaluate the actual
performance of the processes against the QOP and other process
requirements.
Analysis and evaluation is conducted per quarter, and all results were seen
evaluated as Yes.
See OFIs cited above
CAR
NCR
100% customer satisfaction rating was achieved on the BN Registration
process during the first half of 2023.
Time study and analysis of processing time were evident in the following;
➢ BMBE Lux Time study
➢ Business Counseling Log Sheet
➢ Trade and Industry Information Cycle Log
The other monitoring tools seen were also for the correction for the error
on the BNR during the release of certificate.
Logbook is also is also being maintained to record all applicants, and the
time out or the time the client claimed the certificate.
BMBE Registration:
For the BNRS Helpdesk, the Technical Support and Operations unit
monitors the requests and resolve the concerns.
Region 4A
The internal audit of the Region 4A was conducted by NIQA last July 25-27,
2023. All the processes and the requirements of the standard were
confirmed covered the Internal Audit Team of Region 5.
Region 4B:
Approved Audit Program for CY 2023 is available and presented during the
audit. Information to the audit programs includes audit objectives, scope
and frequency, audit schedules and audit assignment, applicable clauses to
be audited, audit criteria, audit methodology, roles and responsibilities,
reporting arrangement, and verification of nonconformities among others.
Result of internal audit conducted 01-03 August 2023, covering the Regional
Office Functions, and the five (5) Provincial Offices. Approved Internal Audit
Plan is available. Adequate consideration of all process under the certified
scope were fully covered by the audit team audited the Regional Office.
Region 5
For CY 2023, Internal audit was conducted as planned, 18-20 July 2023,
with defined Audit Objective, Audit Criteria and composition of the Audit
Team, as part of the National Internal Audit. Region 5 was audited by
Auditors of DTI NCR. Calibration of findings was conducted in September
2023, Final Calibrated PIQA results was shared, showing whether findings
are “systemic” or “Isolated”. Final RFI for Region 5 has not been received
at the time of audit.
Request for Improvement (RFI) is used to document findings during
Internal Audit.
Region 6
In the latest Internal Audit, Region 6 was audited by Internal auditors from
Region 8. The audit was conducted in July 25-27, 2023.
There were 25 NCs and various OFIs raised by the 6 Internal auditors of
Region 8.
Reference:
• Corrective Action Procedure/PRC-NC-01/v3/July 1, 2022
• Internal Audit Procedure/PR-IQA-01/v4/July 1, 2022
The organization’s procedure and requirements for the conduct of the QMS
Internal Audit were defined in the documented “Internal Quality Audit
Procedure” (PR-IQA-01; Version 4; July 1, 2022).
The latest internal audit conducted at the DTI Region 7 was held on July
11 -13, 2023, which was performed by the QMS Internal Auditors from the
DTI Region 6.
The audit findings at the various offices of the DTI (nationwide) were
reviewed and summarized by the NIQA and were consolidated in the
“Calibrated Process IQA Reports” that was issued by the Internal Audit
Service Director.
The consolidation of the audit findings for each processes of the DTI were
presented in the “Process IQA Report” (i.e., Process IQA Report for
Business Counselling, Supplier Management, etc.).
The organization’s procedure and requirements for the conduct of the QMS
Internal Audit were defined in the documented “Internal Quality Audit
Procedure” (PR-IQA-01; Version 4; July 1, 2022).
The latest internal audit conducted at the DTI Region 8 was held on
August 1 -3, 2023, which was performed by the QMS Internal Auditors
from the DTI Region 7.
The audit findings at the various offices of the DTI (nationwide) were
reviewed and summarized by the NIQA and were consolidated in the
“Calibrated Process IQA Reports” that was issued by the Internal Audit
Service Director.
The consolidation of the audit findings for each processes of the DTI were
presented in the “Process IQA Report” (i.e., Process IQA Report for
Finance – processing of Claims, Conduct of training, SRE Accreditation,
etc.).
There were a total of 19 nonconformities reported at the DTI Region 8
which were summarized in the “RFI Registry”.
Region 9
The internal audit for the region was scheduled on August 01 – 03, 2023
and conducted by the Region 10.
Region 10
The results from the last NIQA was presented with reported 5 minor
nonconformities after calibration meeting last August 9-11. 2023 and final
PCAR last September 19-22, 2023.
The following RFI were confirmed 100% with corrective action:
• 23-R10-RFI-01
• 23-R10-RFI-02
• 23-R10-RFI-03
• 23-R10-RFI-04
• 23-R10-RFI-05
The audit was conducted by NIQA audit team from Region 9 that was
confirmed independent of the audit areas.
Region 11
The internal audit plan was evident and conducted on July 11 – 13, 2023
by the DTI Region XIII by virtue of remote/virtual audit.
Region 12
The result of the Internal Audit for DTI Region XII submitted by the team
of auditor from Region XIII was presented including the reported RFI that
are still for confirmation at the time of the audit. The most recent audit
conducted was August 1-3, 2023.
The deadline set for the submission of the complete PIQARS is October
13, 2023. There are three RFI that are still for confirmation.
All the processes were confirmed subjected to audit in compliance with the
audit program and audit reports were presented for review.
NCR
Verification of Previous NC
LGR-01/S1 – CLOSED. The NCRO audit team was able to submit the
audit report to Region 5 on-time.
The final closing meeting was conducted last September 21, 2023, as seen
in the Process IQA Report (PIQAR), which was uploaded in SharePoint dated
October 04, 2023.
All the review inputs and outputs as required by the Standard were
evidently tackled during meetings, as evidenced by the MR Records and
Minutes of the Meeting in which agreements and action plans are
discussed, monitored and updated. Responsibilities, timelines, and
resources needed for the action plans are defined in the Minutes of the
Meeting.
Overall conclusion in the last meeting states that the QMS of DTI-Regional
Office 2 is still suitable, adequate, and effective and aligned with the
Standard ISO 9001:2015.
The Management review was done last July 7, 2023 through Zoom
Videoconferencing, participated by the Regional and provincial directors
and their officers. The letter with agenda was sent to the different
provinces to inform them on the date and method of management
meeting.
The meeting has started with the roll call, followed by the review and
approval of the previous minutes of the meeting, management review
tracking of issues and concerns from the previous management review,
updates from the division and ended up with a closing remark from the
OIC-ARD RACortes, recognizing the accomplishment for the 2nd semester.
Another Mancom meeting was done last Oct. 17, 2023, covering the 3rd
quarter performances. Memorandum to this effect was served last Oct. 11,
2023. In this meeting, agreement on action plans, responsibility, timeline
and resource needed were defined. The conclusion of the meeting is the
Provincial operations has demonstrated the adaptability, sufficiency and
effectiveness of the quality management system to the whole DTI-4A
systems and processes. It acknowledged that there are still room for
Region 4B:
The Region conducts its management review at regional level quarterly.
Latest conduct of management review was 17 October 2023. In the
presented minutes of the management review, required information of the
international standard was covered in the said management review.
Overall, effective conduct of management review to measure the
continuing suitability, adequacy, effectiveness, and alignment to the
strategic direction was observed.
All the review inputs and outputs as required by the Standard were
evidently tackled during meetings, as evidenced by the MR Records and
Minutes of the Meeting in which agreements and action plans are
discussed, monitored and updated. Responsibilities, timelines, and
resources needed for the action plans are defined in the Minutes of the
Meeting.
CARAGA
The management review board headed by the Regional Director together
with the members (i.e. ARD, Provincial Directors and Division Chiefs) is
tasks to review the performance of the QMS Regularly. Memorandum
Regional Office Order No. 2023-07-01 dated 24 July 2023, specify the
functions and responsibilities of the MRB.
The prescribed minimum input for review was also specified together with
the desired management review output.
NCR
The Management Review Procedure, with document code GL-MR-01, dated
August 31, 2021, version 2. The planned review for Regional Offices is
quarterly. Annual review at the National Level is annual.
The last review for the performance of the NCRO QMS was October 24,
2023 for Q4 2023. Attended by the RD, QMR, Area Heads and Focal Person
for the programs.
Discussed were the 12 inputs required by ISO 9001:2015 standards
such as:
1. Status of actions from previous Mgt. Review, all previous were deemed
closed.
2. Updates on SWOT Analysis, internal and external issues.
3. Updates on Stakeholders Analysis
4. Customer Satisfaction
5 Internal audit result, status of RFIs
6. Performance of external Providers
7. Adequacy of Resources, no other issues related to resources. Proposed
plantilla positions was presented also.
8. Effectiveness of the actions to address risk and opportunities,
Inventory of risk and opportunities may support the evaluation of the
effectiveness of actions.
9. Opportunities for improvement considered was the Employee
Engagement Survey results that needs to be acted upon.
10 Improvement
10.1 General Region 1: Regional Level
The organization shall determine and select opportunities for Opportunities for improvement can include correction, corrective action,
improvement and implement any necessary actions to meet continual improvement, breakthrough change, innovation and re-
customer requirements and enhance customer satisfaction. organization.
These shall include: a) improving products and services to
Region 5
The system for Nonconformity used the RFI (Request for Improvement)
to document the Nonconformity as a result of Internal Audit findings,
unmet Target, and Customer Complaints among others.
An RFI Registry (FM-N-02v0) was shared to monitor status of corrections
and corrective actions and is uploaded in the google drive.
A sample of an RFA which is still open, 23—RO5-RFI-UT-020, was shared.
Root cause analysis, and corrective actions, person responsible, and
completion date of 2nd Qtr of 2023, were determined.
The problem analysis and correction and corrective action planning were
generally seen in the RFIs that were documented nonconformities that
were identified in the July 2023 internal audit (i.e., RFI for nonconformity
under the Business Counselling process and RFI for the nonconformity
against Clause 6.1 for the Supplier Management process).
Due to the delayed submission of the RFIs, the requirement for action
effectiveness evaluation was not yet available at the time of this external
audit.
Minor Conformity
Cebu Provincial Office – Conduct of Trade Fair
No Corrective Action (use of Request for Improvement) was shared at the
time of audit, to identify the root cause, correction and corrective action
for the revision of Timeline related to the Target of Conduct of 2 Trade
Fairs.
Owing to the very recent submission of the RFIs, the requirement for
action effectiveness evaluation was not yet available at the time of this
external audit.
From the IQA findings, the following RFI were confirmed 100% with
corrective action:
• 23-R10-RFI-01
• 23-R10-RFI-02
• 23-R10-RFI-03
• 23-R10-RFI-04
• 23-R10-RFI-05
The RFIs were confirmed with correction, dealing with consequence, root
cause analysis, corrective action and evaluating if the nonconformity exist
on other areas.
NCR
The implementation of the corrective action system as required by One DTI
QMS was seen adequately implemented from addressing nonconformities
associated with the unmet target.
The nonconformity reported for unmet targets (RFI) were presented, total
of 5 self-issued by the head of the process. 4/5 were already confirmed
closed at the time of the audit. The root cause analysis, correction, dealing
with consequence, corrective action, evaluation of risk or any changes to
the QMS was made evident. Verification of the effectiveness of the
corrective action leading to closure of the RFI were made evident.
FTEB
Unmet targets on the Price Monitoring last September 2023 were being
addressed through the corrective action process as evidenced by the RFI:
FTI-RFI-07.
10.3 The organization shall continually improve the suitability, In all the offices and bureaus, the results of evaluation were seen in the
adequacy and effectiveness of the quality management Process Performance Monitoring reports, Client Satisfaction Feedback
system.) The organization shall consider the results of analysis Summary Reports, List of Evaluated Suppliers (i.e., Performance
Overall, the result of the recent management reviews showed that the
organization has an adequate, suitable, and effective implementation of
QMS.
Documented information being retained to evidence the implementation of the Procedures includes the following;
Business Counselling
• Consolidated Business Counselling Log Sheets (FM-BC-02) as of September 2023
DTI Region 8 -Samar Provincial Office assigned coordinators in Negosyo Centers to help MSMEs scale up their business thru coaching and mentoring
The programs of DTI Region 8 are established by DTI Central Office. The DTI Regional Office is just responsible for the implementation of the programs
based on the Department Orders and other relevant reference for examples process procedures (examples: PR-BC-01, PR-CC-01, and PR-PSM-01)
and applicable statutory requirements (examples: RA 10644, DAO 20-02:2020, RA 7581 and DO 20-86).
In Business Counselling, the review of the requirements for services was evident in the accomplished Business Counselling Form (FM-BC-01a).
In Price Monitoring, the review of the requirements for services was evident in the accomplished DTI Price and Supply Monitoring Form (FM-PSM-02).
In Consumer Complaints Handling, the review of the requirements for services was evident in the accomplished Initial Complaint Form (FM-CC-01)
and Mediation Agreement.
* REGION 7:
Not audited due to lack of time
8.2 Requirements for products and services 8.2.1 Customer communication 8.2.2 Determining the requirements for products and services 8.2.3
Review of the requirements for products and services, 8.2.4 Changes to the requirements for products and services 8.6 Release of products and
services 8.7 Control of nonconforming outputs
D.2 Unresolved Issues, if any (otherwise indicate NONE); or Lead Auditor recommends to focus on processes or activities during the next audit.
None