Some examples of
unclear contract
drafting
Better to say………
Because………
1
12/10/2020
Better to say………
Because………
Better to say………
Because………
2
12/10/2020
3
12/10/2020
Contractor’s obligations
Contract Administrator’s duties
Subcontracting
Contractor’s representative
Contract Administrator’s instructions
Variations
Payment
Insurance
Employer’s liability
Public liability
Contract works insurance
Termination
Settlement of disputes
4
12/10/2020
• Keep it simple
The work will include some electrical alterations and also replacing the
floor and ceiling finishes. It is essential that the work is of the highest
quality and that minimal disturbance is caused to the running of the hotel.
The anticipated start date is February 1st 2021 with completion required by
August 10th 2021 in time for some pre booked conferences. The hotel has
a detailed list of the work they require to be carried out.