1. Only Competent person shall perform the task / activity. Working at Height training complied.
2. In the event of adverse weather conditions, High Winds, Sandstorm, Rains/ Heavy the activity must stop accordingly.
Additional
7.0
Instructions
3. Proper housekeeping to be done before & after work. Excess materials shall be removing and kept at stacking area.
Potential
Potetial Risk
Risk
SI
No: Activity Significant hazard Hazard Effect Contol Measures Proposed / Identified
Risk Rating
Risk Rating
Probability
Probability
Severity
Severity
Work Pinch point. Personnel Injury PTW shall be prepared by the appropriate
Preparation Sharp edges. Asset Damage. supervisor, with all required documentations must
Communication Failure to identify and be attached with PTW.
(pre job meeting follow required safety Any type of scaffold erect, dismantle or
with all personnel procedure. modification PTW must be supported by request
involved in task) form and must be approved by PIUL supervisor.
Slip; trip, fall
A pre-task meeting shall be held with all personnel
4 3 12 involved in the activity to ensure that all are aware & 4 1 4
1 understand the contents of the associated hazards.
Supervisor shall ensure that all personnel understand
their duties and responsibilities.
Workforce shall be aware of Emergency Response Plan
ERP (raised in TBT).
Martial arrangement and housekeeping.
2 2/ Accessing Slips and Trips Personnel injury Site shall be visited and inspected by the supervisor
Worksite Unauthorized entry Asset damage prior to work commencing and shall ensure that the
Vehicle, tracks, Not following traffic Traffic accident area is clear of tripping hazards, and all required
boom truck… safety requirement . precautions are implemented.
4 3 12 Flag man must be at site.
4 1 4
housekeeping shall be maintained
Personnel must wear required PPE
1D 4/ Work Personnel Come into Personnel injury/ Supervisor shall ensure all personnel are aware of the
Environment Contact with Insects / health problem dangers of insects / wildlife during the pre-work TBT.
Wildlife/Hot Climatic Property damage Supervisor shall ensure all personnel are aware of the
conditions signs & dangers of dehydration / sun stroke/heat stroke
2 2 4 2 1 2
Sand storm Enough supply of drinking water to be onsite always.
Emergency equipment/vehicle shall be available in
case need arise.
2 Loading/ Tripping/ Slipping Personal injury Utilize proper lifting techniques/certified/ equipment.
unloading of Falling of load. Property damage. crane to be used / inspected all rigging tools before use
scaffolding Size up the load before lifting.
materials
Ask for help when lifting heavy items more than 25 kg.
Forklift or crane which will be used to load or unload
should be inspected.
4 2 8 All lifting gears (sling belt, shackles and others) should 2 2 4
be checked prior to perform the work.
Equipment operator should be qualified and
familiar with such activity.
Work area must be barricaded.
Rigger man must be at site as needed.
Tag line must be used during the operation.
Prepared By: CERI Supervisor In-charge Reviewed/Approved By: CERI HSE Reviewed/Approved By: SAMSUNG HSE Approved By: SAMSUNG Construction
Name Signature Date Name Signature Date Name Signature Date Name Signature Date
NOTE: As the worksite Supervisor, my signature (next column) confirms that I understand the hazards and control measures on
the previous page(s) and have communicated all requirements with my work crew and will abide by all conditions and
______________________ _________________ ________
restrictions stated therein. List of names of work crew detailed below. Name Signature Date
No. Name Designation Company Signature Date
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
NOTE: As the worksite Supervisor, my signature (next column) confirms that I understand the hazards and control measures on
the previous page(s) and have communicated all requirements with my work crew and will abide by all conditions and
______________________ _________________ ________
restrictions stated therein. List of names of work crew detailed below. Name Signature Date
No. Name Designation Company Signature Date
13.
14.
21.