Network Diagram Method and Precedence Diagram Method

The critical path of the project in Example #1 is A-B-D-F which has a total duration of 23 days. The critical path of the project in Example #2 is A-B-D-G-H which has a total duration of 19 days.

Uploaded by

Bry An Cañares
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Network Diagram Method and Precedence Diagram Method

The critical path of the project in Example #1 is A-B-D-F which has a total duration of 23 days. The critical path of the project in Example #2 is A-B-D-G-H which has a total duration of 19 days.

Uploaded by

Bry An Cañares
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Network Diagram Method and

Precedence Diagram Method


Example #1: Using Network and PDM
Activity Predecessor Duration
A - 5
B A 4
C A 5
D B 8
E C 3
F D,E 6

1. Determine the critical path of project.


2. What is the total duration of the project?
B

C
B D

A F

C E
8
B D 6
4

5 A F

5 E
C 6
3
8
B D
4 6

PATH A-B-D-F = 23
5 A PATH A-C-E-F = 19 F

5 6
C E
3
EARLY START ACTIVITY LATE START

EARLY FINISH DURATION LATE FINISH


B D
4 8

A F
5 6

C E
5 3
5 B 9 D
4 8

0 A 5 F
5 6

5 C 10 E
5 3
5 B 9 9 D 17
4 8

0 A 5 17 F 23
5 6

5 C 10 10 E 13
5 3
5 B 9 9 D 17
5 4 9 9 8 17

0 A 5 PATH A-B-D-F = 23 17 F 23
0 5 5 PATH A-C-E-F = 19 17 6 23

5 C 10 10 E 13
9 5 14 14 3 17
Example #2 USING ACTIVITY
A
PREDECESSOR DURATION
- 3
PDM B A 4
C A 2
D B 5
Determine the critical path of project.
E C 1
F C 2
G D,E 4
H F,G 3

B D G
4 5 4

A H
E
3 3
1
C
F
2
2
ACTIVITY PREDECESSOR DURATION
Example #2 USING PDM A - 3
B A 4
C A 2
PATH A-B-D-G-H
PATH A-C-E-G-H D B 5
PATCH A-C-F-H E C 1
F C 2
G D,E 4
H F,G 3

3 B 7 7 D 12 12 G 16
3 4 7 7 5 12 12 4 16

0 A 3 16 H 19
5 E 6
0 3 3 16 3 19
11 1 12
3 C 5
5 F 7
9 2 11
14 2 16