Box Bridge Quantity 12-24 SP-2

This document provides a summary of quantities for box bridge construction along the East-West Highway in Nepal. It includes 8 items with details on the excavation, stonework, concrete work, reinforcement, and gabion works needed for 10 box bridges. The first section lists the total quantities required for each item across all the bridges. The second section provides a more detailed estimate for the Geuriya Bridge, with dimensions and calculations for its components.

Uploaded by

sujankhanal10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views70 pages

Box Bridge Quantity 12-24 SP-2

This document provides a summary of quantities for box bridge construction along the East-West Highway in Nepal. It includes 8 items with details on the excavation, stonework, concrete work, reinforcement, and gabion works needed for 10 box bridges. The first section lists the total quantities required for each item across all the bridges. The second section provides a more detailed estimate for the Geuriya Bridge, with dimensions and calculations for its components.

Uploaded by

sujankhanal10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 70

SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH

Box Bridges
Summary of Quantity

Total Geuriya Bhutre Mawa Animal Pass-1 Animal Pass-2 Chisang-1 Jharana Madhyali Mada
SN Particulars Unit
Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
1 Excavation for Structures Foundation Earth work in excavation of foundation of
structures, including construction of shoring and bracing, removal of stumps and other
deleterious matter and backfilling with approved Material, all complete as per design
drawings, technical specification and to the satisfaction of Engineer. Cum 7,405.23 1,131.35 909.21 891.61 603.59 603.59 687.66 1,460.28 521.52 596.44
Ordinary Soil [SS/SP 900]

2 Providing and laying of Stone Soling/Pitching/Packing Works for levelling in line and
level, all complete as per design drawings, technical specification and to the satisfaction of Cum 1,272.14 178.56 180.68 174.91 90.40 90.40 129.00 239.86 90.66 97.67
Engineer. [SS/SP 2600]

3 Providing and placing machine mixed Cement Concrete M15/40 for Levelling Course,
including compaction, curing, testing and necessary lead, including necessary form works
[F1 Finish] all complete as per design drawings, technical specification and to the Cum 733.64 102.36 104.34 98.69 50.72 50.72 77.43 141.99 51.87 55.52
satisfaction of Engineer.[SS/SP 1800 and 2000]

4 Providing and laying machine mixed Cement Concrete in M25/20 for RCC works
including form works, compaction, curing, testing, all complete, as per specification, Cum 6,530.04 869.02 945.68 729.16 489.40 489.40 632.15 1,625.88 385.45 363.90
drawing and instruction of Engineer. (SS-2000)

5 Providing and laying machine mixed Cement Concrete in M30/20 for RCC works in Crash
Barriers including form works, compaction, curing, testing, all complete, as per
specification, drawing and instruction of Engineer. (SS-2000) Cum 166.72 20.71 24.53 35.11 10.95 10.95 8.32 35.45 8.24 12.46

6 Providing and Filling Stone/ Boulder in gabion boxes / mattress etc. including dressing,
beding, bonding all complete as per specification and drawing. (SS-2402) Cum 1,980.00 340.00 220.00 280.00 180.00 180.00 150.00 280.00 150.00 200.00

7 Gabion Structure for Retaining Earth


Providing laying and assembling machine made mechanically woven double twisted crates
/ mattress for Gabion structure for retaining earth with diaphragm all complete as per
design drawings, technical specification and to the satisfaction of Engineer. [SS/SP 2400] Sqm 10,890.00 1,870.00 1,210.00 1,540.00 990.00 990.00 825.00 1,540.00 825.00 1,100.00

8 Providing and laying , fitting and placing HYSD bar reinforcement for RCC structure all
complete, all complete as per design drawings, technical specification and to the Mt 674.08 86.25 98.74 82.03 50.40 50.40 64.81 163.20 39.86 38.38
satisfaction of Engineer. [SS/SP 2000]

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Summary-1


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 21.80 0.70 366.24


Wing Wall U/S 2 8.49 3.30 1.50 84.00
Wing Wall D/S 2 8.49 3.30 1.50 84.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 6.00 26.00 0.25 39.00
Floor Apron, D/S 1 6.00 26.00 0.25 39.00
Gabion Apron, U/S 1 4.00 34.00 1.00 136.00
Gabion Apron, D/S 1 6.00 34.00 1.00 204.00
Curtain Wall, U/S 1 34.00 1.00 2.23 75.65
Curtain Wall, D/S 1 34.00 1.00 2.73 92.65
Total 1,131.35 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 21.80 0.15 78.48


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 8.49 3.30 0.15 8.40
Wing Wall D/S 2 8.49 3.30 0.15 8.40
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 6.00 26.00 0.15 23.40
Floor Apron, D/S 1 6.00 26.00 0.15 23.40
Curtain Wall, U/S 1 34.00 1.00 0.15 5.10
Curtain Wall, D/S 1 34.00 1.00 0.15 5.10
Total 178.561 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 21.80 0.10 52.32


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 8.49 3.30 0.08 4.20
Wing Wall D/S 2 8.49 3.30 0.08 4.20
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 6.00 26.00 0.08 11.70
Floor Apron, D/S 1 6.00 26.00 0.08 11.70
Curtain Wall, U/S 1 34.00 1.00 0.08 2.55
Curtain Wall, D/S 1 34.00 1.00 0.08 2.55
Total 102.36 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-2


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 5 24.00 0.30 5.58 200.880


Bottom Slab 1 24.00 21.50 0.45 232.200
Top Slab 1 21.00 21.50 0.40 180.600
Haunch 16 24.00 0.30 0.3 0.5 17.280
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 8.49 3.30 0.70 39.20
Wing Wall Foundation D/S 2 8.49 3.30 0.70 39.20
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 8.49 0.33 4.14 23.54
Wing Wall Stem D/S 2 8.49 0.33 4.14 23.54
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 34.00 0.25 1.60 13.600
Curtain Wall Stem, D/S 1 34.00 0.25 2.10 17.850
Curtain Wall Footing, U/S 1 34.00 1.00 0.40 13.600
Curtain Wall Footing, D/S 1 34.00 1.00 0.40 13.600
Total 869.02 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 100.00 0.1935 19.35
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 20.71 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 34.00 4.00 1.00 136.00


Gabion Apron, D/S 1 34.00 6.00 1.00 204.00
Total 340.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-3


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 1,870.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-4


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 21420 16 150 142 21620 3070.04 1.58 4850.7


100

100

TS2 10420 12 200 218 10620 2315.16 0.89 2060.5


100

TS3 21420 12 150 142 21620 3070.04 0.89 2732.3


100

100
100

TS4 10420 12 200 218 10620 2315.16 0.89 2060.5

TS5 0 0 0 6400 0 0.00 0


50

6300
50

Total 11704

Base Slab
100

21350
100

BS1 20 180 134 21550 2887.7 2.47 7132.6


100

23850
100

BS2 12 200 108 24050 2597.4 0.89 2311.7


100
100

BS3 21350 12 150 160 21550 3448 0.89 3068.7


100

100

BS4 23850 12 200 108 24050 2597.4 0.89 2311.7


50
50

BS4 6300 0 0 0 6400 0 0 0

Total 14824.7

Side Walls
1775
6315

SW1 20 150 320 9865 3156.8 2.47 7797.3

1775

150
6315

SW2 16 150 320 6615 2116.8 1.58 3344.5


150
200

23850
200

SW3 12 180 64 48100 3078.4 0.89 2739.8

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-5


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"

1775
6315

SW4 16 150 960 9865 9470.4 1.58 14963.2


1775
200

23850
200

SW5 12 180 96 48100 4617.6 0.89 4109.7

200 450 300


SW6 16 200 242 1587 384.054 1.58 606.8
637

CB1 12 200 484 1252 605.968 0.89 539.3


1252

CB2 1252 12 200 396 2504 991.584 0.89 882.5


1252

Total 34983.1
Total (TS+BS+SW) 61511.8

Curtain Walls
Downstream
2350

CD1 12 150 454 2650 1203.1 0.89 1070.8


300
100

CD2 10 180 15 67900 1018.5 0.62 631.5


33850
250

CD3 10 180 190 2200 418 0.62 259.2


850

CD4 33850 10 180 12 33850 406.2 0.62 251.8


Total 2213.3

Upstream
1850

CU1 12 150 454 2150 976.1 0.89 868.7


300
100

CU2 10 180 12 67900 814.8 0.62 505.2


33850
250

CU3 10 180 190 2200 418 0.62 259.2


850

CU4 33850 10 180 12 33850 406.2 0.62 251.8

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-6


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"


Total 1884.9

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 100m Length 6143.00

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-7


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Geuriya Bridge (04/H001/033)
Chainage :- 45+952

Detailed Estimate of Box Bridge "GEURIYA"


1440 to

S1 20 200 48 3560 170.88 2.47 422.10


3880

900

100
2290 to

S2 20 200 48 5730 275.04 2.47 679.30


7170

900

100
2290 to

S3 12 120 80 5730 458.4 0.89 408.00


7170

900

S4 10 160 31 9450 292.95 0.62 181.60


9450

S5 10 160 31 9450 292.95 0.62 181.60


9450
100
100

F1 1690 to 4690 12 180 54 3390 183.06 0.89 162.90

F2 10 180 19 9450 179.55 0.62 111.30


9450
100
100

F3 1690 to 4690 12 150 64 3390 216.96 0.89 193.10

F4 10 180 19 9450 179.55 0.62 111.30


9450

F5 10 6 9450 56.7 0.62 35.20


9450
Total 2486.40
Total for Four Wing Wall 9945.600 Mt
Total Rebar 86.251 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-8


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

400 0.25 m
0.25

5580 300
0.30 155 160

5000 480

205 260
450
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "GEURIYA" Road Width (W)= 24000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 5580 mm
Side Wall Thickness (c)= 300 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 400 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 450 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 100.00 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 6.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 20.00 m
Width of Rigid Apron at End, AW-2= 32.00 m Wing Wall Length, U/S= 8.49 m
Length of Curtain Wall U/S, CWL-1= 34.00 m Wing Wall Length, D/S= 8.49 m
Length of Curtain Wall D/S, CWL-2= 34.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 6.58 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 4.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-9


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 50.00 11.20 0.70 392.00


Wing Wall U/S 2 7.07 3.30 1.50 70.00
Wing Wall D/S 2 7.07 3.30 1.50 70.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 5.00 15.00 0.25 18.75
Floor Apron, D/S 1 5.00 15.00 0.25 18.75
Gabion Apron, U/S 1 4.00 22.00 1.00 88.00
Gabion Apron, D/S 1 6.00 22.00 1.00 132.00
Curtain Wall, U/S 1 22.00 1.00 2.23 48.95
Curtain Wall, D/S 1 22.00 1.00 2.73 59.95
Total 909.21 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 50.00 11.20 0.15 84.00


Approach Slab 2 50.00 3.50 0.15 52.50
Wing Wall U/S 2 7.07 3.30 0.15 7.00
Wing Wall D/S 2 7.07 3.30 0.15 7.00
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 5.00 15.00 0.15 11.25
Floor Apron, D/S 1 5.00 15.00 0.15 11.25
Curtain Wall, U/S 1 22.00 1.00 0.15 3.30
Curtain Wall, D/S 1 22.00 1.00 0.15 3.30
Total 180.681 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 50.00 11.20 0.10 56.00


Approach Slab 2 50.00 3.50 0.08 26.25
Wing Wall U/S 2 7.07 3.30 0.08 3.50
Wing Wall D/S 2 7.07 3.30 0.08 3.50
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 5.00 15.00 0.08 5.63
Floor Apron, D/S 1 5.00 15.00 0.08 5.63
Curtain Wall, U/S 1 22.00 1.00 0.08 1.65
Curtain Wall, D/S 1 22.00 1.00 0.08 1.65
Total 104.34 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-10


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 3 50.00 0.30 5.15 231.750


Bottom Slab 1 50.00 10.90 0.45 245.250
Top Slab 1 47.00 10.90 0.40 204.920
Haunch 8 50.00 0.30 0.3 0.5 18.000
Corbel Rectangular part 2 50.00 0.30 0.25 7.500
Corbel Traingular Part 2 50.00 0.30 0.25 0.5 3.750
Approach Slab 2 50.00 3.50 0.25 87.500
Wing Wall Foundation U/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation D/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 7.07 0.33 3.93 18.60
Wing Wall Stem D/S 2 7.07 0.33 3.93 18.60
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 22.00 0.25 1.60 8.800
Curtain Wall Stem, D/S 1 22.00 0.25 2.10 11.550
Curtain Wall Footing, U/S 1 22.00 1.00 0.40 8.800
Curtain Wall Footing, D/S 1 22.00 1.00 0.40 8.800
Total 945.68 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 79.40 0.1935 15.37
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 21.80 0.2656 5.79
Crash Barrier-3 (CB-3) 28.00 0.10 2.71
Crash Barrier-4 (CB-4) 5.00 0.13 0.66
Total 24.53 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 22.00 4.00 1.00 88.00


Gabion Apron, D/S 1 22.00 6.00 1.00 132.00
Total 220.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-11


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 1,210.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-12


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 10820 16 150 316 11020 3482.32 1.58 5502.1


100

100

TS2 23420 12 200 112 23620 2645.44 0.89 2354.4


100

TS3 10820 12 150 316 11020 3482.32 0.89 3099.3


100

100
100

TS4 23420 12 200 112 23620 2645.44 0.89 2354.4

TS5 0 0 0 3400 0 0.00 0


50

3300
50

Total 13310.2

Base Slab
100

10750
100

BS1 20 180 278 10950 3044.1 2.47 7518.9


100

49850
100

BS2 12 200 55 50050 2752.75 0.89 2449.9


100
100

BS3 10750 12 150 334 10950 3657.3 0.89 3255


100

100

BS4 49850 12 200 55 50050 2752.75 0.89 2449.9


50
50

BS4 3300 0 0 0 3400 0 0 0

Total 15673.7

Side Walls
1775
5885

SW1 20 150 668 9435 6302.58 2.47 15567.4

1775

150
5885

SW2 16 150 668 6185 4131.58 1.58 6527.9


150
200

49850
200

SW3 12 180 58 100100 5805.8 0.89 5167.2

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-13


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"

1775
5885

SW4 16 150 668 9435 6302.58 1.58 9958.1


1775
200

49850
200

SW5 12 180 29 100100 2902.9 0.89 2583.6

200 450 300


SW6 16 200 502 1587 796.674 1.58 1258.7
637

CB1 12 200 1004 1252 1257.008 0.89 1118.7


1252

CB2 1252 12 200 124 2504 310.496 0.89 276.3


1252

Total 42457.9
Total (TS+BS+SW) 71441.8

Curtain Walls
Downstream
2350

CD1 12 150 294 2650 779.1 0.89 693.4


300
100

CD2 10 180 15 43900 658.5 0.62 408.3


21850
250

CD3 10 180 123 2200 270.6 0.62 167.8


850

CD4 21850 10 180 12 21850 262.2 0.62 162.6


Total 1432.1

Upstream
1850

CU1 12 150 294 2150 632.1 0.89 562.6


300
100

CU2 10 180 12 43900 526.8 0.62 326.6


21850
250

CU3 10 180 123 2200 270.6 0.62 167.8


850

CU4 21850 10 180 12 21850 262.2 0.62 162.6

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-14


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"


Total 1219.6

Approach Slab
100
100

AS1 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS2 49900 12 150 24 50100 1202.4 0.89 1070.1


100
100

AS3 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS4 49900 12 150 24 50100 1202.4 0.89 1070.1

Total 4280.4
Total for Two Approach Slab 8560.8

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 79.4m Length 4877.54

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 21.8m Length 1911.86

Crash Barrier (Type:- CB-3)


For 28m Length 860.02

Crash Barrier (Type:- CB-4)


For 5m Length 219.25

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-15


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Bhutre Bridge (04/H001/037)
Chainage :- 54+130

Detailed Estimate of Box Bridge "BHUTRE"


1440 to

S1 20 200 41 3450 141.45 2.47 349.40


3660

900

100
2290 to

S2 20 200 41 5510 225.91 2.47 558.00


6740

900

100
2290 to

S3 12 120 68 5510 374.68 0.89 333.50


6740

900

S4 10 160 29 8040 233.16 0.62 144.60


8040

S5 10 160 29 8040 233.16 0.62 144.60


8040
100
100

F1 1690 to 4690 12 180 46 3390 155.94 0.89 138.80

F2 10 180 19 8040 152.76 0.62 94.70


8040
100
100

F3 1690 to 4690 12 150 55 3390 186.45 0.89 165.90

F4 10 180 19 8040 152.76 0.62 94.70


8040

F5 10 6 8040 48.24 0.62 29.90


8040
Total 2054.10
Total for Four Wing Wall 8216.400 Mt
Total Rebar 98.739 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-16


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

400 0.25 m
0.25

5150 300
0.30 155 160

5000 480

205 260
450
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "BHUTRE" Road Width (W)= 50000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 5150 mm
Side Wall Thickness (c)= 300 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 400 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 450 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 79.40 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 21.80 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 28.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 5.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 5.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 10.00 m
Width of Rigid Apron at End, AW-2= 20.00 m Wing Wall Length, U/S= 7.07 m
Length of Curtain Wall U/S, CWL-1= 22.00 m Wing Wall Length, D/S= 7.07 m
Length of Curtain Wall D/S, CWL-2= 22.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 6.15 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 2.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-17


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 50.00 8.99 0.60 269.70


Wing Wall U/S 2 7.07 3.30 1.50 70.00
Wing Wall D/S 2 7.07 3.30 1.50 70.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 5.00 21.00 0.25 26.25
Floor Apron, D/S 1 5.00 21.00 0.25 26.25
Gabion Apron, U/S 1 4.00 28.00 1.00 112.00
Gabion Apron, D/S 1 6.00 28.00 1.00 168.00
Curtain Wall, U/S 1 28.00 1.00 2.23 62.30
Curtain Wall, D/S 1 28.00 1.00 2.73 76.30
Total 891.61 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 50.00 8.99 0.15 67.43


Approach Slab 2 50.00 3.50 0.15 52.50
Wing Wall U/S 2 7.07 3.30 0.15 7.00
Wing Wall D/S 2 7.07 3.30 0.15 7.00
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 5.00 21.00 0.15 15.75
Floor Apron, D/S 1 5.00 21.00 0.15 15.75
Curtain Wall, U/S 1 28.00 1.00 0.15 4.20
Curtain Wall, D/S 1 28.00 1.00 0.15 4.20
Total 174.906 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 50.00 8.99 0.10 44.95


Approach Slab 2 50.00 3.50 0.08 26.25
Wing Wall U/S 2 7.07 3.30 0.08 3.50
Wing Wall D/S 2 7.07 3.30 0.08 3.50
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 5.00 21.00 0.08 7.88
Floor Apron, D/S 1 5.00 21.00 0.08 7.88
Curtain Wall, U/S 1 28.00 1.00 0.08 2.10
Curtain Wall, D/S 1 28.00 1.00 0.08 2.10
Total 98.69 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-18


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 3 50.00 0.23 4.70 162.150


Bottom Slab 1 50.00 8.69 0.35 152.075
Top Slab 1 47.00 8.69 0.35 142.950
Haunch 8 50.00 0.30 0.3 0.5 18.000
Corbel Rectangular part 2 50.00 0.30 0.25 7.500
Corbel Traingular Part 2 50.00 0.30 0.25 0.5 3.750
Approach Slab 2 50.00 3.50 0.25 87.500
Wing Wall Foundation U/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation D/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 7.07 0.33 3.70 17.53
Wing Wall Stem D/S 2 7.07 0.33 3.70 17.53
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 28.00 0.25 1.60 11.200
Curtain Wall Stem, D/S 1 28.00 0.25 2.10 14.700
Curtain Wall Footing, U/S 1 28.00 1.00 0.40 11.200
Curtain Wall Footing, D/S 1 28.00 1.00 0.40 11.200
Total 729.16 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 116.90 0.1935 22.62
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 34.30 0.2656 9.11
Crash Barrier-3 (CB-3) 28.00 0.10 2.71
Crash Barrier-4 (CB-4) 5.00 0.13 0.66
Total 35.11 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 28.00 4.00 1.00 112.00


Gabion Apron, D/S 1 28.00 6.00 1.00 168.00
Total 280.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-19


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 1,540.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-20


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 8610 16 150 316 8810 2783.96 1.58 4398.7


100

100

TS2 23420 12 200 90 23620 2125.8 0.89 1892


100

TS3 8610 12 150 316 8810 2783.96 0.89 2477.7


100

100
100

TS4 23420 12 200 90 23620 2125.8 0.89 1892

TS5 16 300 160 2730 436.8 1.58 690.1


50

2630
50

Total 11350.5

Base Slab
100

8540
100

BS1 16 150 334 8740 2919.16 1.58 4612.3


100

49850
100

BS2 12 200 44 50050 2202.2 0.89 1960


100
100

BS3 8540 12 150 334 8740 2919.16 0.89 2598.1


100

100

BS4 49850 12 200 44 50050 2202.2 0.89 1960


50
50

BS4 2630 16 200 502 2730 1370.46 1.58 2165.3

Total 13295.7

Side Walls
1405
5285

SW1 16 150 668 8095 5407.46 1.58 8543.8

1405

150
5285

SW2 12 150 668 5585 3730.78 0.89 3320.4


150
130

49850
130

SW3 12 180 54 99960 5397.84 0.89 4804.1

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-21


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "

1405
5285

SW4 12 150 668 8095 5407.46 0.89 4812.6


1405
130

49850
130

SW5 12 180 27 99960 2698.92 0.89 2402

200 380 300


SW6 16 200 502 1418 711.836 1.58 1124.7
538

CB1 12 200 1004 1082 1086.328 0.89 966.8


1082

CB2 1082 12 200 112 2164 242.368 0.89 215.7


1082

Total 26190.1
Total (TS+BS+SW) 50836.3

Curtain Walls
Downstream
2350

CD1 12 150 374 2650 991.1 0.89 882.1


300
100

CD2 10 180 15 55900 838.5 0.62 519.9


27850
250

CD3 10 180 156 2200 343.2 0.62 212.8


850

CD4 27850 10 180 12 27850 334.2 0.62 207.2


Total 1822

Upstream
1850

CU1 12 150 374 2150 804.1 0.89 715.6


300
100

CU2 10 180 12 55900 670.8 0.62 415.9


27850
250

CU3 10 180 156 2200 343.2 0.62 212.8


850

CU4 27850 10 180 12 27850 334.2 0.62 207.2

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-22


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "


Total 1551.5

Approach Slab
100
100

AS1 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS2 49900 12 150 24 50100 1202.4 0.89 1070.1


100
100

AS3 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS4 49900 12 150 24 50100 1202.4 0.89 1070.1

Total 4280.4
Total for Two Approach Slab 8560.8

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 116.9m Length 7181.17

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 34.3m Length 3008.11

Crash Barrier (Type:- CB-3)


For 28m Length 860.02

Crash Barrier (Type:- CB-4)


For 5m Length 219.25

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-23


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mawa Branch Bridge (04/H001/038)
Chainage :- 55+126

Detailed Estimate of Box Bridge "MAWA BRANCH "


1440 to

S1 20 200 41 3340 136.94 2.47 338.20


3440

900

100
2290 to

S2 20 200 41 5290 216.89 2.47 535.70


6290

900

100
2290 to

S3 12 120 68 5290 359.72 0.89 320.20


6290

900

S4 10 160 28 8040 225.12 0.62 139.60


8040

S5 10 160 28 8040 225.12 0.62 139.60


8040
100
100

F1 1690 to 4690 12 180 46 3390 155.94 0.89 138.80

F2 10 180 19 8040 152.76 0.62 94.70


8040
100
100

F3 1690 to 4690 12 150 55 3390 186.45 0.89 165.90

F4 10 180 19 8040 152.76 0.62 94.70


8040

F5 10 6 8040 48.24 0.62 29.90


8040
Total 1997.30
Total for Four Wing Wall 7989.200 Mt
Total Rebar 82.028 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-24


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

350 0.25 m
0.25

4700 230
0.30 155 160

4000 480

205 260
350
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "MAWA BRANCH " Road Width (W)= 50000 mm
Clear Width (a)= 4000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 4700 mm
Side Wall Thickness (c)= 230 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 350 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 350 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 116.90 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 34.30 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 28.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 5.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 5.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 16.00 m
Width of Rigid Apron at End, AW-2= 26.00 m Wing Wall Length, U/S= 7.07 m
Length of Curtain Wall U/S, CWL-1= 28.00 m Wing Wall Length, D/S= 7.07 m
Length of Curtain Wall D/S, CWL-2= 28.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 5.70 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 2.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-25


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 9.20 0.85 187.68


Wing Wall U/S 2 5.66 3.30 1.50 56.00
Wing Wall D/S 2 5.66 3.30 1.50 56.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 4.00 12.00 0.25 12.00
Floor Apron, D/S 1 4.00 12.00 0.25 12.00
Gabion Apron, U/S 1 4.00 18.00 1.00 72.00
Gabion Apron, D/S 1 6.00 18.00 1.00 108.00
Curtain Wall, U/S 1 18.00 1.00 2.23 40.05
Curtain Wall, D/S 1 18.00 1.00 2.73 49.05
Total 603.59 Cum

Providing and laying of Stone


Soling/Pitching/ Packing Works for
2 levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 9.20 0.15 33.12


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 5.66 3.30 0.15 5.60
Wing Wall D/S 2 5.66 3.30 0.15 5.60
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 4.00 12.00 0.15 7.20
Floor Apron, D/S 1 4.00 12.00 0.15 7.20
Curtain Wall, U/S 1 18.00 1.00 0.15 2.70
Curtain Wall, D/S 1 18.00 1.00 0.15 2.70
Total 90.401 Cum

Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
3 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 9.20 0.10 22.08


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 5.66 3.30 0.08 2.80
Wing Wall D/S 2 5.66 3.30 0.08 2.80
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 4.00 12.00 0.08 3.60
Floor Apron, D/S 1 4.00 12.00 0.08 3.60
Curtain Wall, U/S 1 18.00 1.00 0.08 1.35
Curtain Wall, D/S 1 18.00 1.00 0.08 1.35
Total 50.72 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-26


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"


Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
4 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 2 24.00 0.45 4.20 90.720


Bottom Slab 1 24.00 8.90 0.60 128.160
Top Slab 1 21.00 8.90 0.55 102.795
Haunch 4 24.00 0.30 0.3 0.5 4.320
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 5.66 3.30 0.70 26.13
Wing Wall Foundation D/S 2 5.66 3.30 0.70 26.13
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 5.66 0.33 3.45 13.08
Wing Wall Stem D/S 2 5.66 0.33 3.45 13.08
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 18.00 0.25 1.60 7.200
Curtain Wall Stem, D/S 1 18.00 0.25 2.10 9.450
Curtain Wall Footing, U/S 1 18.00 1.00 0.40 7.200
Curtain Wall Footing, D/S 1 18.00 1.00 0.40 7.200
Total 489.40 Cum

Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
5 works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 49.60 0.1935 9.60
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 10.95 Cum

Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
6 dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 18.00 4.00 1.00 72.00


Gabion Apron, D/S 1 18.00 6.00 1.00 108.00
Total 180.00 Cum

Assembling mechanical woven Gabion


boxes/matresses, placing in position
7 including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-27


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"


Total 990.00 Sqm

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 8820 20 140 152 9020 1371.04 2.47 3386.5


100

100

TS2 10420 12 200 92 10620 977.04 0.89 869.6


100

TS3 8820 12 140 152 9020 1371.04 0.89 1220.2


100

100
100

TS4 10420 12 200 92 10620 977.04 0.89 869.6

TS5 12 140 152 2950 448.4 0.89 399.1


50

2850
50

Total 6745

Base Slab
100

8750
100

BS1 25 140 172 8950 1539.4 3.86 5942.1


100

23850
100

BS2 12 200 45 24050 1082.25 0.89 963.2


100
100

BS3 8750 12 140 172 8950 1539.4 0.89 1370.1


100

100

BS4 23850 12 200 45 24050 1082.25 0.89 963.2


50
50

BS4 2850 20 140 344 2950 1014.8 2.47 2506.6

Total 11745.2

Side Walls
2825
5235

SW1 20 140 344 10885 3744.44 2.47 9248.8

2825

150
5235

SW2 16 140 344 5535 1904.04 1.58 3008.4


150

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-28


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"

23850 350
350

SW3 12 180 48 48400 2323.2 0.89 2067.6

2825
5235

SW4 16 140 0 10885 0 1.58 0


2825
350

23850
350

SW5 12 180 0 48400 0 0.89 0

200 600 300


SW6 16 200 242 1949 471.658 1.58 745.2
849

CB1 12 200 484 1676 811.184 0.89 722


1676

CB2 1676 12 200 0 3352 0 0.89 0


1676

Total 15792.0
Total (TS+BS+SW) 34282.2

Curtain Walls
Downstream
2350

CD1 12 150 240 2650 636 0.89 566


300
100

CD2 10 180 15 35900 538.5 0.62 333.9


17850
250

CD3 10 180 101 2200 222.2 0.62 137.8


850

CD4 17850 10 180 12 17850 214.2 0.62 132.8


Total 1170.5

Upstream
1850

CU1 12 150 240 2150 516 0.89 459.2


300
100

CU2 10 180 12 35900 430.8 0.62 267.1


17850

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-29


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"


250

CU3 10 180 101 2200 222.2 0.62 137.8


850

CU4 17850 10 180 12 17850 214.2 0.62 132.8

Total 996.9

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 49.6m Length 3046.93

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-30


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 67+860

Detailed Estimate of Box Bridge "Animal Pass"

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall
1440 to

S1 20 200 34 3210 109.14 2.47 269.60


3190

900

100
2290 to

S2 20 200 34 5040 171.36 2.47 423.30


5790

900

100
2290 to

S3 12 120 56 5040 282.24 0.89 251.20


5790

900

S4 10 160 26 6620 172.12 0.62 106.70


6620

S5 10 160 26 6620 172.12 0.62 106.70


6620
100
100

F1 1690 to 4690 12 180 38 3390 128.82 0.89 114.60

F2 10 180 19 6620 125.78 0.62 78.00


6620
100
100

F3 1690 to 4690 12 150 45 3390 152.55 0.89 135.80

F4 10 180 19 6620 125.78 0.62 78.00


6620

F5 10 6 6620 39.72 0.62 24.60


6620
Total 1588.50
Total for Four Wing Wall 6354.000 Mt
Total Rebar 50.403 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-31


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

550 0.25 m
0.25

4200 450
0.30 155 160

8000 480

205 260
600
400 255 650
75

Assumptions:
Box Bridge with Internal Cell Size = "Animal Pass" Road Width (W)= 24000 mm
Clear Width (a)= 8000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 4200 mm
Side Wall Thickness (c)= 450 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 550 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 600 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 49.60 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 4.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 8.00 m
Width of Rigid Apron at End, AW-2= 16.00 m Wing Wall Length, U/S= 5.66 m
Length of Curtain Wall U/S, CWL-1= 18.00 m Wing Wall Length, D/S= 5.66 m
Length of Curtain Wall D/S, CWL-2= 18.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 5.20 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 1.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-32


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 9.20 0.85 187.68


Wing Wall U/S 2 5.66 3.30 1.50 56.00
Wing Wall D/S 2 5.66 3.30 1.50 56.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 4.00 12.00 0.25 12.00
Floor Apron, D/S 1 4.00 12.00 0.25 12.00
Gabion Apron, U/S 1 4.00 18.00 1.00 72.00
Gabion Apron, D/S 1 6.00 18.00 1.00 108.00
Curtain Wall, U/S 1 18.00 1.00 2.23 40.05
Curtain Wall, D/S 1 18.00 1.00 2.73 49.05
Total 603.59 Cum

Providing and laying of Stone


Soling/Pitching/ Packing Works for
2 levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 9.20 0.15 33.12


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 5.66 3.30 0.15 5.60
Wing Wall D/S 2 5.66 3.30 0.15 5.60
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 4.00 12.00 0.15 7.20
Floor Apron, D/S 1 4.00 12.00 0.15 7.20
Curtain Wall, U/S 1 18.00 1.00 0.15 2.70
Curtain Wall, D/S 1 18.00 1.00 0.15 2.70
Total 90.401 Cum

Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
3 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 9.20 0.10 22.08


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 5.66 3.30 0.08 2.80
Wing Wall D/S 2 5.66 3.30 0.08 2.80
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 4.00 12.00 0.08 3.60
Floor Apron, D/S 1 4.00 12.00 0.08 3.60
Curtain Wall, U/S 1 18.00 1.00 0.08 1.35
Curtain Wall, D/S 1 18.00 1.00 0.08 1.35
Total 50.72 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-33


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"


Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
4 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 2 24.00 0.45 4.20 90.720


Bottom Slab 1 24.00 8.90 0.60 128.160
Top Slab 1 21.00 8.90 0.55 102.795
Haunch 4 24.00 0.30 0.3 0.5 4.320
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 5.66 3.30 0.70 26.13
Wing Wall Foundation D/S 2 5.66 3.30 0.70 26.13
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 5.66 0.33 3.45 13.08
Wing Wall Stem D/S 2 5.66 0.33 3.45 13.08
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 18.00 0.25 1.60 7.200
Curtain Wall Stem, D/S 1 18.00 0.25 2.10 9.450
Curtain Wall Footing, U/S 1 18.00 1.00 0.40 7.200
Curtain Wall Footing, D/S 1 18.00 1.00 0.40 7.200
Total 489.40 Cum

Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
5 works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 49.60 0.1935 9.60
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 10.95 Cum

Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
6 dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 18.00 4.00 1.00 72.00


Gabion Apron, D/S 1 18.00 6.00 1.00 108.00
Total 180.00 Cum

Assembling mechanical woven Gabion


boxes/matresses, placing in position
7 including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-34


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"


Total 990.00 Sqm

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 8820 20 140 152 9020 1371.04 2.47 3386.5


100

100

TS2 10420 12 200 92 10620 977.04 0.89 869.6


100

TS3 8820 12 140 152 9020 1371.04 0.89 1220.2


100

100
100

TS4 10420 12 200 92 10620 977.04 0.89 869.6

TS5 12 140 152 2950 448.4 0.89 399.1


50

2850
50

Total 6745

Base Slab
100

8750
100

BS1 25 140 172 8950 1539.4 3.86 5942.1


100

23850
100

BS2 12 200 45 24050 1082.25 0.89 963.2


100
100

BS3 8750 12 140 172 8950 1539.4 0.89 1370.1


100

100

BS4 23850 12 200 45 24050 1082.25 0.89 963.2


50
50

BS4 2850 20 140 344 2950 1014.8 2.47 2506.6

Total 11745.2

Side Walls
2825
5235

SW1 20 140 344 10885 3744.44 2.47 9248.8

2825

150
5235

SW2 16 140 344 5535 1904.04 1.58 3008.4


150

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-35


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"

23850 350
350

SW3 12 180 48 48400 2323.2 0.89 2067.6

2825
5235

SW4 16 140 0 10885 0 1.58 0


2825
350

23850
350

SW5 12 180 0 48400 0 0.89 0

200 600 300


SW6 16 200 242 1949 471.658 1.58 745.2
849

CB1 12 200 484 1676 811.184 0.89 722


1676

CB2 1676 12 200 0 3352 0 0.89 0


1676

Total 15792.0
Total (TS+BS+SW) 34282.2

Curtain Walls
Downstream
2350

CD1 12 150 240 2650 636 0.89 566


300
100

CD2 10 180 15 35900 538.5 0.62 333.9


17850
250

CD3 10 180 101 2200 222.2 0.62 137.8


850

CD4 17850 10 180 12 17850 214.2 0.62 132.8


Total 1170.5

Upstream
1850

CU1 12 150 240 2150 516 0.89 459.2


300
100

CU2 10 180 12 35900 430.8 0.62 267.1


17850

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-36


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"


250

CU3 10 180 101 2200 222.2 0.62 137.8


850

CU4 17850 10 180 12 17850 214.2 0.62 132.8

Total 996.9

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 49.6m Length 3046.93

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-37


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Jhiljhile Bridge (04/H001/028)
Chainage :- 68+772

Detailed Estimate of Box Bridge "Animal Pass"

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall
1440 to

S1 20 200 34 3210 109.14 2.47 269.60


3190

900

100
2290 to

S2 20 200 34 5040 171.36 2.47 423.30


5790

900

100
2290 to

S3 12 120 56 5040 282.24 0.89 251.20


5790

900

S4 10 160 26 6620 172.12 0.62 106.70


6620

S5 10 160 26 6620 172.12 0.62 106.70


6620
100
100

F1 1690 to 4690 12 180 38 3390 128.82 0.89 114.60

F2 10 180 19 6620 125.78 0.62 78.00


6620
100
100

F3 1690 to 4690 12 150 45 3390 152.55 0.89 135.80

F4 10 180 19 6620 125.78 0.62 78.00


6620

F5 10 6 6620 39.72 0.62 24.60


6620
Total 1588.50
Total for Four Wing Wall 6354.000 Mt
Total Rebar 50.403 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-38


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

550 0.25 m
0.25

4200 450
0.30 155 160

8000 480

205 260
600
400 255 650
75

Assumptions:
Box Bridge with Internal Cell Size = "Animal Pass" Road Width (W)= 24000 mm
Clear Width (a)= 8000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 4200 mm
Side Wall Thickness (c)= 450 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 550 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 600 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 49.60 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 4.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 8.00 m
Width of Rigid Apron at End, AW-2= 16.00 m Wing Wall Length, U/S= 5.66 m
Length of Curtain Wall U/S, CWL-1= 18.00 m Wing Wall Length, D/S= 5.66 m
Length of Curtain Wall D/S, CWL-2= 18.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 5.20 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 1.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Animal Pass-39


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"


Item Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 21.55 0.65 336.18


Wing Wall U/S 2 5.66 2.90 1.50 49.21
Wing Wall D/S 2 5.66 2.90 1.50 49.21
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 4.00 9.00 0.25 9.00
Floor Apron, D/S 1 4.00 9.00 0.25 9.00
Gabion Apron, U/S 1 4.00 15.00 1.00 60.00
Gabion Apron, D/S 1 6.00 15.00 1.00 90.00
Curtain Wall, U/S 1 15.00 1.00 2.23 33.38
Curtain Wall, D/S 1 15.00 1.00 2.73 40.88
Total 687.66 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 21.55 0.15 77.58


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 5.66 2.90 0.15 4.92
Wing Wall D/S 2 5.66 2.90 0.15 4.92
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 4.00 9.00 0.15 5.40
Floor Apron, D/S 1 4.00 9.00 0.15 5.40
Curtain Wall, U/S 1 15.00 1.00 0.15 2.25
Curtain Wall, D/S 1 15.00 1.00 0.15 2.25
Total 129.003 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 21.55 0.10 51.72


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 5.66 2.90 0.08 2.46
Wing Wall D/S 2 5.66 2.90 0.08 2.46
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 4.00 9.00 0.08 2.70
Floor Apron, D/S 1 4.00 9.00 0.08 2.70
Curtain Wall, U/S 1 15.00 1.00 0.08 1.13
Curtain Wall, D/S 1 15.00 1.00 0.08 1.13
Total 77.43 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-40


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 5 24.00 0.25 4.00 120.000


Bottom Slab 1 24.00 21.25 0.40 204.000
Top Slab 1 21.00 21.25 0.35 156.187
Haunch 16 24.00 0.30 0.3 0.5 17.280
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 5.66 2.90 0.50 16.40
Wing Wall Foundation D/S 2 5.66 2.90 0.50 16.40
Wing Wall Foundation Ends 4 1.00 1.80 0.50 3.60
Wing Wall Stem U/S 2 5.66 0.31 3.35 11.75
Wing Wall Stem D/S 2 5.66 0.31 3.35 11.75
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 15.00 0.25 1.60 6.000
Curtain Wall Stem, D/S 1 15.00 0.25 2.10 7.875
Curtain Wall Footing, U/S 1 15.00 1.00 0.40 6.000
Curtain Wall Footing, D/S 1 15.00 1.00 0.40 6.000
Total 632.15 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 36.00 0.1935 6.97
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 8.32 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 15.00 4.00 1.00 60.00


Gabion Apron, D/S 1 15.00 6.00 1.00 90.00
Total 150.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-41


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 825.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-42


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 21170 20 180 118 21370 2521.66 2.47 6228.5


100

100

TS2 10420 12 200 214 10620 2272.68 0.89 2022.7


100

TS3 21170 12 150 142 21370 3034.54 0.89 2700.7


100

100
100

TS4 10420 12 200 214 10620 2272.68 0.89 2022.7

TS5 16 160 134 6350 850.9 1.58 1344.4


50

6250
50

Total 14319

Base Slab
100

21100
100

BS1 20 180 134 21300 2854.2 2.47 7049.9


100

23850
100

BS2 12 200 107 24050 2573.35 0.89 2290.3


100
100

BS3 21100 12 150 160 21300 3408 0.89 3033.1


100

100

BS4 23850 12 200 107 24050 2573.35 0.89 2290.3


50
50

BS4 6250 16 160 302 6350 1917.7 1.58 3030

Total 17693.6

Side Walls
1725
4635

SW1 16 140 344 8085 2781.24 1.58 4394.4

1725

150
4635

SW2 12 140 344 4935 1697.64 0.89 1510.9


150
150

23850
150

SW3 12 180 46 48000 2208 0.89 1965.1

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-43


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"

1725
4635

SW4 12 140 1032 8085 8343.72 0.89 7425.9


1725
150

23850
150

SW5 12 180 69 48000 3312 0.89 2947.7

200 400 300


SW6 16 200 242 1466 354.772 1.58 560.5
566

CB1 12 200 484 1111 537.724 0.89 478.6


1111

CB2 1111 12 200 300 2222 666.6 0.89 593.3


1111

Total 19876.4
Total (TS+BS+SW) 51889.0

Curtain Walls
Downstream
2350

CD1 12 150 200 2650 530 0.89 471.7


300
100

CD2 10 180 15 29900 448.5 0.62 278.1


14850
250

CD3 10 180 84 2200 184.8 0.62 114.6


850

CD4 14850 10 180 12 14850 178.2 0.62 110.5


Total 974.9

Upstream
1850

CU1 12 150 200 2150 430 0.89 382.7


300
100

CU2 10 180 12 29900 358.8 0.62 222.5


14850
250

CU3 10 180 84 2200 184.8 0.62 114.6


850

CU4 14850 10 180 12 14850 178.2 0.62 110.5

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-44


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"


Total 830.3

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 36m Length 2211.48

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-45


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Chisang-1 Bridge (04/H001/046)
Chainage :- 69+928

Detailed Estimate of Box Bridge "CHISANG-1"


1240 to

S1 16 180 38 2860 108.68 1.58 171.70


2890

800

100
2090 to

S2 16 180 38 4640 176.32 1.58 278.60


5390

800

100
2090 to

S3 12 160 42 4640 194.88 0.89 173.40


5390

800

S4 10 230 17 6620 112.54 0.62 69.80


6620

S5 10 230 17 6620 112.54 0.62 69.80


6620
100
100

F1 1690 to 3890 12 220 31 2990 92.69 0.89 82.50

F2 10 250 12 6620 79.44 0.62 49.30


6620
100
100

F3 1690 to 3890 12 150 45 2990 134.55 0.89 119.70

F4 10 250 12 6620 79.44 0.62 49.30


6620

F5 10 6 6620 39.72 0.62 24.60


6620
Total 1088.70
Total for Four Wing Wall 4354.800 Mt
Total Rebar 64.813 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-46


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

350 0.25 m
0.25

4000 250
0.30 155 160

5000 480

205 260
400
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "CHISANG-1" Road Width (W)= 24000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 4000 mm
Side Wall Thickness (c)= 250 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 350 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 400 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 36.00 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 4.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 5.00 m
Width of Rigid Apron at End, AW-2= 13.00 m Wing Wall Length, U/S= 5.66 m
Length of Curtain Wall U/S, CWL-1= 15.00 m Wing Wall Length, D/S= 5.66 m
Length of Curtain Wall D/S, CWL-2= 15.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 5.00 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 4.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-47


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 50.00 17.65 0.95 838.38


Wing Wall U/S 2 7.07 3.30 1.50 70.00
Wing Wall D/S 2 7.07 3.30 1.50 70.00
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 5.00 21.00 0.25 26.25
Floor Apron, D/S 1 5.00 21.00 0.25 26.25
Gabion Apron, U/S 1 4.00 28.00 1.00 112.00
Gabion Apron, D/S 1 6.00 28.00 1.00 168.00
Curtain Wall, U/S 1 28.00 1.00 2.23 62.30
Curtain Wall, D/S 1 28.00 1.00 2.73 76.30
Total 1,460.28 Cum

Providing and laying of Stone


Soling/Pitching/ Packing Works for
2 levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 50.00 17.65 0.15 132.38


Approach Slab 2 50.00 3.50 0.15 52.50
Wing Wall U/S 2 7.07 3.30 0.15 7.00
Wing Wall D/S 2 7.07 3.30 0.15 7.00
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 5.00 21.00 0.15 15.75
Floor Apron, D/S 1 5.00 21.00 0.15 15.75
Curtain Wall, U/S 1 28.00 1.00 0.15 4.20
Curtain Wall, D/S 1 28.00 1.00 0.15 4.20
Total 239.856 Cum

Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
3 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 50.00 17.65 0.10 88.25


Approach Slab 2 50.00 3.50 0.08 26.25
Wing Wall U/S 2 7.07 3.30 0.08 3.50
Wing Wall D/S 2 7.07 3.30 0.08 3.50
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 5.00 21.00 0.08 7.88
Floor Apron, D/S 1 5.00 21.00 0.08 7.88
Curtain Wall, U/S 1 28.00 1.00 0.08 2.10
Curtain Wall, D/S 1 28.00 1.00 0.08 2.10
Total 141.99 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-48


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"


Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
4 curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 3 50.00 0.45 5.00 337.500


Bottom Slab 1 50.00 17.35 0.70 607.250
Top Slab 1 47.00 17.35 0.50 407.725
Haunch 8 50.00 0.30 0.3 0.5 18.000
Corbel Rectangular part 2 50.00 0.30 0.25 7.500
Corbel Traingular Part 2 50.00 0.30 0.25 0.5 3.750
Approach Slab 2 50.00 3.50 0.25 87.500
Wing Wall Foundation U/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation D/S 2 7.07 3.30 0.70 32.67
Wing Wall Foundation Ends 4 1.00 1.80 0.70 5.04
Wing Wall Stem U/S 2 7.07 0.33 3.85 18.24
Wing Wall Stem D/S 2 7.07 0.33 3.85 18.24
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 28.00 0.25 1.60 11.200
Curtain Wall Stem, D/S 1 28.00 0.25 2.10 14.700
Curtain Wall Footing, U/S 1 28.00 1.00 0.40 11.200
Curtain Wall Footing, D/S 1 28.00 1.00 0.40 11.200
Total 1,625.88 Cum

Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
5 works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 118.10 0.1935 22.86
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 34.70 0.2656 9.22
Crash Barrier-3 (CB-3) 28.00 0.10 2.71
Crash Barrier-4 (CB-4) 5.00 0.13 0.66
Total 35.45 Cum

Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
6 dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 28.00 4.00 1.00 112.00


Gabion Apron, D/S 1 28.00 6.00 1.00 168.00
Total 280.00 Cum

Assembling mechanical woven Gabion


boxes/matresses, placing in position
7 including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-49


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"


Total 1,540.00 Sqm

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 17270 20 120 394 17470 6883.18 2.47 17001.5


100

100

TS2 23420 12 160 218 23620 5149.16 0.89 4582.8


100

TS3 17270 12 140 338 17470 5904.86 0.89 5255.3


100

100
100

TS4 23420 12 160 218 23620 5149.16 0.89 4582.8

TS5 16 140 338 5350 1808.3 1.58 2857.1


50

5250
50

Total 34279.5

Base Slab
100

17200
100

BS1 25 140 358 17400 6229.2 3.86 24044.7


100

49850
100

BS2 12 160 109 50050 5455.45 0.89 4855.4


100
100

BS3 17200 12 140 358 17400 6229.2 0.89 5544


100

100

BS4 49850 12 160 109 50050 5455.45 0.89 4855.4


50
50

BS4 5250 16 140 716 5350 3830.6 1.58 6052.3

Total 45351.8

Side Walls
2825
6085

SW1 20 140 716 11735 8402.26 2.47 20753.6

2825

150
6085

SW2 16 140 716 6385 4571.66 1.58 7223.2


150

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-50


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"

49850 350
350

SW3 12 180 56 100400 5622.4 0.89 5003.9

2825
6085

SW4 16 140 716 11735 8402.26 1.58 13275.6


2825
350

49850
350

SW5 12 180 28 100400 2811.2 0.89 2502

200 600 300


SW6 16 200 502 1949 978.398 1.58 1545.9
849

CB1 12 200 1004 1606 1612.424 0.89 1435.1


1606

CB2 1606 12 200 128 3212 411.136 0.89 365.9


1606

Total 52105.2
Total (TS+BS+SW) 131736.5

Curtain Walls
Downstream
2350

CD1 12 150 374 2650 991.1 0.89 882.1


300
100

CD2 10 180 15 55900 838.5 0.62 519.9


27850
250

CD3 10 180 156 2200 343.2 0.62 212.8


850

CD4 27850 10 180 12 27850 334.2 0.62 207.2


Total 1822

Upstream
1850

CU1 12 150 374 2150 804.1 0.89 715.6


300
100

CU2 10 180 12 55900 670.8 0.62 415.9


27850

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-51


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"


250

CU3 10 180 156 2200 343.2 0.62 212.8


850

CU4 27850 10 180 12 27850 334.2 0.62 207.2

Total 1551.5

Approach Slab
100
100

AS1 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS2 49900 12 150 24 50100 1202.4 0.89 1070.1


100
100

AS3 3400 12 150 334 3600 1202.4 0.89 1070.1


100
100

AS4 49900 12 150 24 50100 1202.4 0.89 1070.1

Total 4280.4
Total for Two Approach Slab 8560.8

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 118.1m Length 7254.88

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 34.7m Length 3043.19

Crash Barrier (Type:- CB-3)


For 28m Length 860.02

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-52


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 0+000~45+000) Section of EWH
Dhungre Bridge (04/H001/032)
Chainage :- 82+161

Detailed Estimate of Box Bridge "JHARANA"

Crash Barrier (Type:- CB-4)


For 5m Length 219.25

Wing Wall
1440 to

S1 20 200 41 3410 139.81 2.47 345.30


3590

900

100
2290 to

S2 20 200 41 5440 223.04 2.47 550.90


6590

900

100
2290 to

S3 12 120 68 5440 369.92 0.89 329.20


6590

900

S4 10 160 29 8040 233.16 0.62 144.60


8040

S5 10 160 29 8040 233.16 0.62 144.60


8040
100
100

F1 1690 to 4690 12 180 46 3390 155.94 0.89 138.80

F2 10 180 19 8040 152.76 0.62 94.70


8040
100
100

F3 1690 to 4690 12 150 55 3390 186.45 0.89 165.90

F4 10 180 19 8040 152.76 0.62 94.70


8040

F5 10 6 8040 48.24 0.62 29.90


8040
Total 2038.60
Total for Four Wing Wall 8154.400 Mt
Total Rebar 163.203 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-53


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

500 0.25 m
0.25

5000 450
0.30 155 160

8000 480

205 260
700
400 255 650
75

Assumptions:
Box Bridge with Internal Cell Size = "JHARANA" Road Width (W)= 50000 mm
Clear Width (a)= 8000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 5000 mm
Side Wall Thickness (c)= 450 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 500 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 700 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 118.10 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 34.70 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 28.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 5.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 5.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 16.00 m
Width of Rigid Apron at End, AW-2= 26.00 m Wing Wall Length, U/S= 7.07 m
Length of Curtain Wall U/S, CWL-1= 28.00 m Wing Wall Length, D/S= 7.07 m
Length of Curtain Wall D/S, CWL-2= 28.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 6.00 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 2.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-54


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 10.90 0.65 170.04


Wing Wall U/S 2 5.66 2.90 1.50 49.21
Wing Wall D/S 2 5.66 2.90 1.50 49.21
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 4.00 9.00 0.25 9.00
Floor Apron, D/S 1 4.00 9.00 0.25 9.00
Gabion Apron, U/S 1 4.00 15.00 1.00 60.00
Gabion Apron, D/S 1 6.00 15.00 1.00 90.00
Curtain Wall, U/S 1 15.00 1.00 2.23 33.38
Curtain Wall, D/S 1 15.00 1.00 2.73 40.88
Total 521.52 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 10.90 0.15 39.24


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 5.66 2.90 0.15 4.92
Wing Wall D/S 2 5.66 2.90 0.15 4.92
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 4.00 9.00 0.15 5.40
Floor Apron, D/S 1 4.00 9.00 0.15 5.40
Curtain Wall, U/S 1 15.00 1.00 0.15 2.25
Curtain Wall, D/S 1 15.00 1.00 0.15 2.25
Total 90.663 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 10.90 0.10 26.16


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 5.66 2.90 0.08 2.46
Wing Wall D/S 2 5.66 2.90 0.08 2.46
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 4.00 9.00 0.08 2.70
Floor Apron, D/S 1 4.00 9.00 0.08 2.70
Curtain Wall, U/S 1 15.00 1.00 0.08 1.13
Curtain Wall, D/S 1 15.00 1.00 0.08 1.13
Total 51.87 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-55


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 3 24.00 0.20 3.65 52.560


Bottom Slab 1 24.00 10.60 0.40 101.760
Top Slab 1 21.00 10.60 0.40 89.040
Haunch 8 24.00 0.30 0.3 0.5 8.640
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 5.66 2.90 0.50 16.40
Wing Wall Foundation D/S 2 5.66 2.90 0.50 16.40
Wing Wall Foundation Ends 4 1.00 1.80 0.50 3.60
Wing Wall Stem U/S 2 5.66 0.31 3.18 11.14
Wing Wall Stem D/S 2 5.66 0.31 3.18 11.14
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 15.00 0.25 1.60 6.000
Curtain Wall Stem, D/S 1 15.00 0.25 2.10 7.875
Curtain Wall Footing, U/S 1 15.00 1.00 0.40 6.000
Curtain Wall Footing, D/S 1 15.00 1.00 0.40 6.000
Total 385.45 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 35.60 0.1935 6.89
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 8.24 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 15.00 4.00 1.00 60.00


Gabion Apron, D/S 1 15.00 6.00 1.00 90.00
Total 150.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-56


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 825.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-57


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 10520 16 150 142 10720 1522.24 1.58 2405.1


100

100

TS2 10420 12 200 108 10620 1146.96 0.89 1020.8


100

TS3 10520 12 150 142 10720 1522.24 0.89 1354.8


100

100
100

TS4 10420 12 200 108 10620 1146.96 0.89 1020.8

TS5 12 150 142 3300 468.6 0.89 417.1


50

3200
50

Total 6218.6

Base Slab
100

10450
100

BS1 20 150 160 10650 1704 2.47 4208.9


100

23850
100

BS2 12 200 54 24050 1298.7 0.89 1155.8


100
100

BS3 10450 12 150 160 10650 1704 0.89 1516.6


100

100

BS4 23850 12 200 54 24050 1298.7 0.89 1155.8


50
50

BS4 3200 16 150 320 3300 1056 1.58 1668.5

Total 9705.6

Side Walls
1675
4335

SW1 16 150 320 7685 2459.2 1.58 3885.5

1675

150
4335

SW2 12 150 320 4635 1483.2 0.89 1320


150
100

23850
100

SW3 12 180 42 47900 2011.8 0.89 1790.5

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-58


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"

1675
4335

SW4 12 150 320 7685 2459.2 0.89 2188.7


1675
100

23850
100

SW5 12 180 21 47900 1005.9 0.89 895.3

200 350 300


SW6 16 200 242 1345 325.49 1.58 514.3
495

CB1 12 200 484 1111 537.724 0.89 478.6


1111

CB2 1111 12 200 92 2222 204.424 0.89 181.9


1111

Total 11254.8
Total (TS+BS+SW) 27179.0

Curtain Walls
Downstream
2350

CD1 12 150 200 2650 530 0.89 471.7


300
100

CD2 10 180 15 29900 448.5 0.62 278.1


14850
250

CD3 10 180 84 2200 184.8 0.62 114.6


850

CD4 14850 10 180 12 14850 178.2 0.62 110.5


Total 974.9

Upstream
1850

CU1 12 150 200 2150 430 0.89 382.7


300
100

CU2 10 180 12 29900 358.8 0.62 222.5


14850
250

CU3 10 180 84 2200 184.8 0.62 114.6


850

CU4 14850 10 180 12 14850 178.2 0.62 110.5

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-59


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"


Total 830.3

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 35.6m Length 2186.91

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-60


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Madhyali Bridge (04/H001/055)
Chainage :- 84+617

Detailed Estimate of Box Bridge "MADHYALI"


1240 to

S1 16 180 38 2780 105.64 1.58 166.90


2710

800

100
2090 to

S2 16 180 38 4460 169.48 1.58 267.80


5040

800

100
2090 to

S3 12 160 42 4460 187.32 0.89 166.70


5040

800

S4 10 230 16 6620 105.92 0.62 65.70


6620

S5 10 230 16 6620 105.92 0.62 65.70


6620
100
100

F1 1690 to 3890 12 220 31 2990 92.69 0.89 82.50

F2 10 250 12 6620 79.44 0.62 49.30


6620
100
100

F3 1690 to 3890 12 150 45 2990 134.55 0.89 119.70

F4 10 250 12 6620 79.44 0.62 49.30


6620

F5 10 6 0 0 0.62 0.00
0
Total 1033.60
Total for Four Wing Wall 4134.400 Mt
Total Rebar 39.858 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-61


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

400 0.25 m
0.25

3650 200
0.30 155 160

5000 480

205 260
400
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "MADHYALI" Road Width (W)= 24000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 3650 mm
Side Wall Thickness (c)= 200 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 400 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 400 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 35.60 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 4.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 5.00 m
Width of Rigid Apron at End, AW-2= 13.00 m Wing Wall Length, U/S= 5.66 m
Length of Curtain Wall U/S, CWL-1= 15.00 m Wing Wall Length, D/S= 5.66 m
Length of Curtain Wall D/S, CWL-2= 15.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 4.65 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 2.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-62


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"


Item
Description No Length Breadth Height Area Quantity Unit Remarks
No.
1 Excavation for Structures Foundation
Earth work in excavation of foundation of
structures,including construction of shoring
and bracing, removal of stumps and other
deleterious matter and backfilling with
approved Material as per Drawing and
Technical Specifications. (SS-907)

Box Cell 1 24.00 11.14 0.65 173.78


Wing Wall U/S 2 5.66 2.50 1.50 42.43
Wing Wall D/S 2 5.66 2.50 1.50 42.43
Wing Wall Ends 4 1.00 1.80 1.50 10.80
Floor Apron, U/S 1 4.00 14.00 0.25 14.00
Floor Apron, D/S 1 4.00 14.00 0.25 14.00
Gabion Apron, U/S 1 4.00 20.00 1.00 80.00
Gabion Apron, D/S 1 6.00 20.00 1.00 120.00
Curtain Wall, U/S 1 20.00 1.00 2.23 44.50
Curtain Wall, D/S 1 20.00 1.00 2.73 54.50
Total 596.44 Cum

2 Providing and laying of Stone


Soling/Pitching/ Packing Works for
levelling in line and level, all complete, as
per specification , drawing and instruction
of Engineer. (SS-1006)

Box Cell 1 24.00 11.14 0.15 40.10


Approach Slab 2 24.00 3.50 0.15 25.20
Wing Wall U/S 2 5.66 2.50 0.15 4.24
Wing Wall D/S 2 5.66 2.50 0.15 4.24
Wing Wall Ends 4 1.00 1.80 0.15 1.08
Floor Apron, U/S 1 4.00 14.00 0.15 8.40
Floor Apron, D/S 1 4.00 14.00 0.15 8.40
Curtain Wall, U/S 1 20.00 1.00 0.15 3.00
Curtain Wall, D/S 1 20.00 1.00 0.15 3.00
Total 97.669 Cum

3 Providing and placing machine mixed


Cement Concrete in M15/40 for PCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Box Cell 1 24.00 11.14 0.10 26.74


Approach Slab 2 24.00 3.50 0.08 12.60
Wing Wall U/S 2 5.66 2.50 0.08 2.12
Wing Wall D/S 2 5.66 2.50 0.08 2.12
Wing Wall Ends 4 1.00 1.80 0.08 0.54
Floor Apron, U/S 1 4.00 14.00 0.08 4.20
Floor Apron, D/S 1 4.00 14.00 0.08 4.20
Curtain Wall, U/S 1 20.00 1.00 0.08 1.50
Curtain Wall, D/S 1 20.00 1.00 0.08 1.50
Total 55.52 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-63


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"


4 Providing and laying machine mixed
Cement Concrete in M25/20 for RCC
works including form works, compaction,
curing, testing, all complete, as per
specification, drawing and instruction of
Engineer. (SS-2000)

Side Wall 3 24.00 0.28 2.15 43.344


Bottom Slab 1 24.00 10.84 0.40 104.064
Top Slab 1 21.00 10.84 0.40 91.056
Haunch 8 24.00 0.30 0.3 0.5 8.640
Corbel Rectangular part 2 24.00 0.30 0.25 3.600
Corbel Traingular Part 2 24.00 0.30 0.25 0.5 1.800
Approach Slab 2 24.00 3.50 0.25 42.000
Wing Wall Foundation U/S 2 5.66 2.50 0.30 8.49
Wing Wall Foundation D/S 2 5.66 2.50 0.30 8.49
Wing Wall Foundation Ends 4 1.00 1.80 0.30 2.16
Wing Wall Stem U/S 2 5.66 0.26 2.43 7.13
Wing Wall Stem D/S 2 5.66 0.26 2.43 7.13
Wing Wall Stem Ends 4 1.00 0.22 1.70 1.50
Curtain Wall Stem, U/S 1 20.00 0.25 1.60 8.000
Curtain Wall Stem, D/S 1 20.00 0.25 2.10 10.500
Curtain Wall Footing, U/S 1 20.00 1.00 0.40 8.000
Curtain Wall Footing, D/S 1 20.00 1.00 0.40 8.000
Total 363.90 Cum

5 Providing and laying machine mixed


Cement Concrete in M30/20 for RCC
works in Crash Barriers including form
works, compaction, curing, testing, all
complete, as per specification, drawing and
instruction of Engineer. (SS-2000)

Crash Barrier-1 (CB-1)


Top Trapezoidal Section 0.18 0.48 0.0864
Central Trapezoidal Section 0.30 0.26 0.0771375
Bottom Rectangular Section 0.40 0.08 0.03
Total 57.36 0.1935 11.10
Crash Barrier-2 (CB-2)
Top Trapezoidal Section 0.21 0.48 0.1008
Central Trapezoidal Section 0.46 0.26 0.116025
Bottom Rectangular Section 0.65 0.08 0.04875
Total 0.00 0.2656 0.00
Crash Barrier-3 (CB-3) 14.00 0.10 1.35
Crash Barrier-4 (CB-4) 0.00 0.13 0.00
Total 12.46 Cum

6 Providing and Filling Stone/ Boulder in


gabion boxes / mattress etc. including
dressing, beding, bonding all complete as
per specification and drawing. (SS-2402)

Gabion Apron, U/S 1 20.00 4.00 1.00 80.00


Gabion Apron, D/S 1 20.00 6.00 1.00 120.00
Total 200.00 Cum

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-64


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"


7 Assembling mechanical woven Gabion
boxes/matresses, placing in position
including streching,forming compartments
all complete as per specification and
drawing. (SS-2402)

Total 1,100.00 Sqm

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-65


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"

Bar Schedule for Box Culvert


Total
Length Weight/m Tot. weight
Bar Diameter Spacing Length
Description Nos Remarks
Mark (mm) (mm)
mm (m) (kg/m) (kg)

Top Slab
100
100

TS1 10760 16 150 142 10960 1556.32 1.58 2459


100

100

TS2 10420 12 200 110 10620 1168.2 0.89 1039.7


100

TS3 10760 12 150 142 10960 1556.32 0.89 1385.1


100

100
100

TS4 10420 12 200 110 10620 1168.2 0.89 1039.7

TS5 12 150 142 3380 479.96 0.89 427.2


50

3280
50

Total 6350.7

Base Slab
100

10690
100

BS1 20 150 160 10890 1742.4 2.47 4303.7


100

23850
100

BS2 12 200 55 24050 1322.75 0.89 1177.2


100
100

BS3 10690 12 150 160 10890 1742.4 0.89 1550.7


100

100

BS4 23850 12 200 55 24050 1322.75 0.89 1177.2


50
50

BS4 3280 16 150 320 3380 1081.6 1.58 1708.9

Total 9917.7

Side Walls
1755
2835

SW1 16 150 320 6345 2030.4 1.58 3208

1755

150
2835

SW2 12 150 320 3135 1003.2 0.89 892.8


150
180

23850
180

SW3 12 180 26 48060 1249.56 0.89 1112.1

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-66


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"

1755
2835

SW4 12 150 320 6345 2030.4 0.89 1807.1


1755
180

23850
180

SW5 12 180 13 48060 624.78 0.89 556.1

200 430 300


SW6 16 200 242 1539 372.438 1.58 588.5
609

CB1 12 200 484 1224 592.416 0.89 527.3


1224

CB2 1224 12 200 64 2448 156.672 0.89 139.4


1224

Total 8831.3
Total (TS+BS+SW) 25099.7

Curtain Walls
Downstream
2350

CD1 12 150 268 2650 710.2 0.89 632.1


300
100

CD2 10 180 15 39900 598.5 0.62 371.1


19850
250

CD3 10 180 112 2200 246.4 0.62 152.8


850

CD4 19850 10 180 12 19850 238.2 0.62 147.7


Total 1303.7

Upstream
1850

CU1 12 150 268 2150 576.2 0.89 512.8


300
100

CU2 10 180 12 39900 478.8 0.62 296.9


19850
250

CU3 10 180 112 2200 246.4 0.62 152.8


850

CU4 19850 10 180 12 19850 238.2 0.62 147.7

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-67


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"


Total 1110.2

Approach Slab
100
100

AS1 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS2 23900 12 150 24 24100 578.4 0.89 514.8


100
100

AS3 3400 12 150 161 3600 579.6 0.89 515.8


100
100

AS4 23900 12 150 24 24100 578.4 0.89 514.8

Total 2061.2
Total for Two Approach Slab 4122.4

Crash Barrier (Type:- CB-1)


928

575
C1 16 125 81 2032 164.592 1.58 260.1
225

304
915

C2 16 125 81 1415 114.615 1.58 181.1


500

C3 16 11 9960 109.56 1.58 173.1


9960
Total of 10 m 614.3 0.06143
For 57.36m Length 3523.62

Crash Barrier (Type:- CB-2)

575
C1 16 150 8 2205 17.64 1.58 27.9
250

555
915

C2 16 150 16 1645 26.32 1.58 41.6


730

C3 16 12 960 11.52 1.58 18.2


960
Total of 1 m 87.7
For 0m Length 0.00

Crash Barrier (Type:- CB-3)


For 14m Length 430.01

Crash Barrier (Type:- CB-4)


For 0m Length 0.00

Wing Wall

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-68


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Mada Bridge (04/H001/056)
Chainage :- 84+875

Detailed Estimate of Box Bridge "MADA"


1040 to

S1 16 200 34 2050 69.7 1.58 110.10


1760

650

100
1890 to

S2 16 200 34 3360 114.24 1.58 180.50


3340

650

100
1890 to

S3 12 200 34 3360 114.24 0.89 101.70


3340

650

S4 10 250 11 6620 72.82 0.62 45.10


6620

S5 10 250 11 6620 72.82 0.62 45.10


6620
100
100

F1 1690 to 3090 12 250 27 2590 69.93 0.89 62.20

F2 10 250 11 6620 72.82 0.62 45.10


6620
100
100

F3 1690 to 3090 12 250 27 2590 69.93 0.89 62.20

F4 10 250 11 6620 72.82 0.62 45.10


6620

F5 0 6 0 0 0 0.00
0
Total 697.10
Total for Four Wing Wall 2788.400 Mt
Total Rebar 38.378 Mt

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-69


SHIP-PPC East-West Highway Kakarbhitta - Laukahi Sector

3.50 m

400 0.25 m
0.25

2150 280
0.30 155 160

5000 480

205 260
400
400 255 650
75

Assumptions:
Box Culvert with Internal Cell Size = "MADA" Road Width (W)= 24000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 3000 mm
Clear Height (b)= 2150 mm
Side Wall Thickness (c)= 280 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 400 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 400 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 57.36 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 14.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 4.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 10.00 m
Width of Rigid Apron at End, AW-2= 18.00 m Wing Wall Length, U/S= 5.66 m
Length of Curtain Wall U/S, CWL-1= 20.00 m Wing Wall Length, D/S= 5.66 m
Length of Curtain Wall D/S, CWL-2= 20.00 m Wing Wall End Length= 1.00 m
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 3.15 m
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 1.70 m
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m No of Span= 2.00 No
Height of Corbel Rectangle= 0.25 m
Height of Corbel Traingle= 0.25 m
Width of Corbel= 0.30 m

SOOSUNG/ERMC/TSE Detailed Estimate_Box Bridge_Geuriya-70

You might also like