Column and Footing Details
Column and Footing Details
8Nos-16# 6Nos-16#
4Nos-16#
1'-6"
+2Nos-12#
1'-3"
8# @4"/6"c/c 8# @4"/6"c/c 8# @4"/6"c/c
1'
(refer typ. column section) (refer typ. column section)
9" 9" 1'
Lateral Tie Section 1-1 Lateral Tie Section 2-2 Lateral Tie Section 3-3
NGL NGL
NGL
1 1 2 2
3 3
upto 6' (or) to hard strata
2'
1'-6"
1-3"
1'-6" 1'-6"
10# @6"c/c (typ) (typ) 10# @4"c/c 12# @4"c/c
Bothways Bothways Bothways
6"
6"
6"
P.C.C 1:5:10 mix P.C.C 1:5:10 mix P.C.C 1:5:10
mix
3'6"x3'6" 4'6"x4'6" 6'6"x6'6"
R.C.C. COLUMN AND FOOTING-C1 R.C.C. COLUMN AND FOOTING-C2 R.C.C. COLUMN AND FOOTING-C3
FOR STUB COLUMNS FOR PORTICO COLUMNS FOR MAIN COLUMNS
GENERAL NOTES
1) All dimensions are in foot and inches.
2) Use concrete mix: M25 for RCC (1:1:2)
Use concrete mix: M35 for Roof beam 5) Clear cover to the reinforcement for 8) Crank at L/4of clear span 13) Client / Builder ensures that strict 15) Study both Architectural drawings and
and slab Footing:50mm, Column:40mm, 9) Extra rod at top to a length of 0.3L adherence to the GOOD CONSTRUCTION Structural drawings before start the work
3) Minimum cement content shall not be Beam:30mm, Slab:15mm of clear span from support PRACTICE is followed at site as per if any discrepancies are to be brought to
less than 390 Kg/Cu.m of concrete. 6) Provide lap length 50D for Beam 10) ST - indicates Straight rod. the relevant IS code. the notice of the consultant before the
4) The reinforcement shall be High Strength 7) No admixtures shall be added without 11) CKD- indicates Cranked rod . 14) Structural Engineer's responsibility commencement of work.
Deformed bars of Grade Fe 500(#) permission of consultant. 12) # - Indicates TOR Steel is limited to designing and issual of
confirming to IS 1786-1985. structural drawing only