This document outlines the budget of work for an 11th grade Technical Vocational Livelihood Track course in Electrical Installation and Maintenance for the 2020-2021 school year. Over the four quarters, students will learn key concepts and fundamentals, prepare and maintain electric tools, perform roughing-in activities like installing conduit and wire ways, and install standard electrical protection systems for lighting and grounding. Time is allocated each quarter for teaching specific learning competencies and outcomes related to these topics.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
456 views
Eim Bow (Grade 11
This document outlines the budget of work for an 11th grade Technical Vocational Livelihood Track course in Electrical Installation and Maintenance for the 2020-2021 school year. Over the four quarters, students will learn key concepts and fundamentals, prepare and maintain electric tools, perform roughing-in activities like installing conduit and wire ways, and install standard electrical protection systems for lighting and grounding. Time is allocated each quarter for teaching specific learning competencies and outcomes related to these topics.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3
GRADE LEVEL : Grade 11
TRACK : Technical Vocational Livelihood Track
SPECIALIZATION : Electrical Installation and Maintenance COMPONENT : Industrial Arts
K to 12 BASIC EDUCATION CURRICULUM
SENIOR HIGH SCHOOL TECHNICAL VOCATIONAL LIVELIHOOD TRACK INDUSTRIAL ARTS –ELECTRICAL INSTALLATION AND MAINTENANCE NC II BUDGET OF WORK S.Y. 2020-2021
QUARTER MOST ESSENTIAL LEARNING COMPETENCIES NO. OF DAYS TAUGHT
(MELC) 1st KEY CONCEPTS AND FUNDAMENTALS OF QUARTER ELECTRICAL INSTALLATION AND MAINTENANCE LO 1. Discuss the key concepts, principles and 4 fundamentals in EIM 1.1Discuss therelevance ofthecourse 1.2Explainthecoreconcepts ofElectrical Installation and Maintenance NC II 1.3Explorejobopportunities related to Electrical Installation and Maintenance NC II
LO 2 Discuss the fundamentals and elements of 8
electricity and EIM 2.1 Discuss the nature of electricity and other related theory and principles 2.2 Explain electrical circuits 2.3 Analyze and perform circuit computation 4 applying Ohm’s Law
PREPARING ELECTRIC AND HYDRAULIC TOOLS
LO 1. Select electric and hydraulic tools 6 1.1 Request tools, equipment and materials 1.2 Identify electric and hydraulic tools for the task 1.3 Inspect tools and equipment for damage prior 6 to its use 1.4 Report damage tools 2ND LO 2. Maintain electric and hydraulic tools 6 QUARTER 2.1 Check the conditions of electric and hydraulic tools 2.2 Lubricate electric tools in line with manufacturer’s specification 2.3 Replace auxiliary part of electric and hydraulic 6 tools according to manufacturer’s specification 2.4 Store electric and hydraulic tools LO 2. Maintain electric and hydraulic tools 6 2.1 Check the conditions of electric and hydraulic tools 2.2 Lubricate electric tools in line with manufacturer’s specification 2.3 Replace auxiliary part of electric and hydraulic 6 tools according to manufacturer’s specification 2.4 Store electric and hydraulic tools PERFORMING ROUGHING-IN ACTIVITIES LO 1. Install electrical metallic and non-metallic 10 conduit 1.1 Prepare tools/equipment and materials needed for the installation of electrical metallic and no- metallic conduit in line with job requirements 1.2 Install electrical metallic and non-metallic conduit according to the job requirements following PEC and NEC 1.3 Observe safety procedure in installing electrical 6 metallic and non-metallic conduit 1.4 Perform installation according to OHS guidelines and procedures
3rd LO 2. Install wire ways and cable trays 4
QUARTER 2.1 Prepare tools/equipment and materials needed for the installation of wire ways and cable trays in line with job requirements 2.2 Install wire ways and cable trays according to 8 the job requirements following PEC and NEC 2.3 Observe safety procedure in installing wire ways and cable trays according to OHS guidelines and procedures LO 3. Install telephone terminal cabinet 4 3.1 Prepare tools/equipment and materials needed for the installation of telephone terminal cabinet in line with job requirement.
3.2 Install telephone terminal cabinet according to 8
the job requirements following PEC and NEC 3.3 Observe safety procedure in installing telephone terminal cabinet according to OHS guidelines and procedures LO 4. Install cable bridge 4 4.1 Prepare tools/equipment and materials needed for the installation of cable bridge in line with job requirements 4.2 Install cable bridge according to the job 8 requirements following PEC and NEC 4.3 Observe safety procedure in installing cable bridge according to OHS guidelines and procedures 4th INSTALLING STANDARD ELECTRICAL PROTECTION QUARTER FOR LIGHTING AND GROUNDING LO 1. Plan and prepare work 10 1.1 Read measurement in terms of: 1.1.1 Resistance 1.1.2 Current 1.1.3 Voltage 1.2 Use measuring/testing instrument 1.2.1 Ohmmeter 1.2.2 Ammeter 1.2.3 Voltmeter 1.2.4 Clamp meter 1.2.5 Kilo watt hour meter 1.3 Interpret blueprint of electrical plan 10 1.4 Plan and prepare electrical materials and tools for the installation of: 1.4.1 Electrical meter connection and grounding 1.4.2 Service entrance and circuit breaker/safety switch installation of a residential structure LO 2. Install standard electrical protection system 10 for lighting and grounding 2.1 Perform the installation of: 2.1.1 Electrical meter connection and grounding 2.1.2 Service entrance and circuit breaker/safety switch of a residential structure 2.2 Follow schedule of work to ensure completion 10 at agreed time and quality standards 2.3 Check quality of work following instruction and requirements 2.4 Follow safety procedure