Acomplished Chemical Engineering executive with 35 years of nitrogenous fertiliser industry.
Expertise spans project management, general management, commissioning, operations, technical
services and HSE. Presently overseeing a large-scale production site inclusive of three ammonia-
urea plants, utilities & bagging/despatch facilities, demonstrating a production and dispatch
capacity of 10,000 metric tonnes per day.
+91-99291-11220
Experience
[email protected]
CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, KOTA
https://www.linkedin.com/in/upen
dra-singh-9146b94/ April 2019 - PRESENT
VICE PRESIDENT - WORKS
Kota, Rajasthan, INDIA 1. Overseeing Three Urea Units at the site with combined daily capacity of 10,000 metric tonnes
with an annual-turnover of USD 2.5 bn
2. Head of Brownfield Project for Weak Nitric Acid and Ammonium Nitrate Plant, at the same
EDUCATION site. Project Cost approx USD 200 million, initiated to develop a nitro-based chemicals
complex at the site in Gadepan, Kota. Zero date - April’23 with a target of 30 months to CDP.
3. Administering a work force of 800 and responsible for Overall Operations, Planning,
Procurement and QC.
May 1988 4. Conceptualising and implementing efficiency improvement measures to reduce energy
Bachelor of Technology- consumption by 5-7% saving the company USD $6 million anually.
5. Continuously looking for upskilling of manpower by handpicked training across the industry to
Chemical Engineering promote innovation which drives productivity and has shown operational cost benefits
Laxminarayan Institute of 6. Regulatory requirements are crucial compliance parameters. I actively lobby with the
Government and manoeuver ESG initiatives to align site operations in tandem with them.
Technology
7. Ensuring Safety and Environment protection to top of the standards. FAI Safety Award and
2004 Rajasthan State Factory Safety Award, given to the company resonate with this,
Management Development 8. “Deliver Today and Build for Tomorrow” sits as my cardinal mantra behind the actions
IIM - Indore
December 2006 - March 2010
HEAD OF PROJECTS - REVAMP
LANGUAGE 1. Head of Projects for Phase - 1 and Phase - 2 plants. Capacity enhancement by 15% ; Overall
Energy saving by 5%. The full cost of the project was broken even in 2 years time
2. Managed asset allocation of USD 100 million project budget.
3. Sole Spokesperson between cross departmental government bodies, stakeholders and the
Project team, delivering within tim and stipulated budged. Commissioned in : March’09
English
August 2004 - November 2005
Hindi HEALTH, SAFETY & ENVIRONMENT CO-ORDINATOR
1. Trained in “Improving OHS Performance in Industries” by Japan Industrial Safety and Health
Beyond Work
Marathon Runner Art Connoisseur