0% found this document useful (0 votes)
52 views4 pages

PB Waste Crane - PB Bunker Runway Beam - Waste Crane Mark Up

1. The document is a revision schedule for structural drawings showing crane tracks labeled PB1 through PB32. 2. It refers the reader to other drawings for general notes, typical details, and crane track tolerance requirements. 3. The structural provision for the crane shown is for information only and must be reviewed with the E&M design. 4. It lists various beam marks and their corresponding sizes.

Uploaded by

yip konglung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views4 pages

PB Waste Crane - PB Bunker Runway Beam - Waste Crane Mark Up

1. The document is a revision schedule for structural drawings showing crane tracks labeled PB1 through PB32. 2. It refers the reader to other drawings for general notes, typical details, and crane track tolerance requirements. 3. The structural provision for the crane shown is for information only and must be reviewed with the E&M design. 4. It lists various beam marks and their corresponding sizes.

Uploaded by

yip konglung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1 2 3 4 5 6 7 8 9 10 11 12

NOTES:
Revision Schedule
PB27 PB26 PB17 PB16 PB7 PB6 No. Date Description Checked by Approved by
1. FOR GENERAL NOTES, REFER TO DRAWING NO.
IWMF1-13_133_300_120001 AND 120002. 0 19-NOV-2021 DDA SUBMISSION MH KY
1 08-APR-2022 DDA SUBMISSION MH KY
H PB32 PB31PB30PB29PB28 PB25PB24PB23PB22PB21PB20PB19PB18 PB15PB14PB13PB12PB11PB10 PB9 PB8 PB5 PB4 PB3 PB2 PB1 2. FOR TYPICAL DETAILS, REFER TO DRAWING NO. H
IWMF1_13-133_300_120101, 120111 AND 120121
SERIES.

3. THE STRUCTURAL PROVISION FOR THE CRANE


IN THIS DRAWING IS FOR INFORMATION ONLY.
IT SHALL BE REVIEWED IN CONJUCTION WITH
THE E&M DESIGN.

PBA 4. FOR CRANE TRACK TOLERANCE REQUIREMENT,


REFER TO DDA PACKAGE 2.3.16.01.02 MECHANICAL
WORKS DESIGN - WASTE CRANE AND GRAPPLE,
PBB DRAWING NO. IWMF1_43-211_250_000102.

BEAM MARK SIZE


Employer
RWB-01 UB914x419x388
PBC RWB-02 UB610x305x179
G G
RWB-03 UB914x305x201
RWB-04 UC254x254x107

1
PBD RWB-05 UC305x305x137
Supervising Officer
ST-01 UB305x127x42
ST-02 UB610x305x179

1
PBE
Main Contractor

PBF

PBG
F Designers F

PBH

PBJ Design Checker

1A
-

+38.100 WALKWAY ROOF LEVEL KEYPLAN ℄

E ℄ E
10 1201 340

3-M30 3-M30 BOLTS RC COLUMN


60 80 16mm THK. 60 110 110 60 Certification
BOLTS TIE PLATE
3-M30x250mm 60 60 RWB-01 3-M30
3 BOLTS 16mm THK. TIE PLATE
HEADED STUD ANCHORS 250 + 41.450 RWB-01 + 41.450
125632
75 25

8
200
25 75

500

8 12 12 12
L150x150x16

D
200x400x16mm THK
EMBED PLATE FOR MARKUP D
20mm THK. 20mm THK.
STIFFENER PLATES STIFFENER PLATES

6-M30x400mm
CAST-IN HEADED BOLTS
WITH NUT AND WASHER
RC COLUMN
500x500x30 2 500x500x30
BASE PLATE 125632 BASE PLATE
+ 40.499 + 40.499

30

30
C 6-M30x400mm C

400

400
CAST-IN HEADED BOLTS
WITH NUT AND WASHER

900

900
40 60 300 60 40 150 100 150 150 100 150

150 500 150


Project Name

Contract No. EP/SP/66/12


1700

1700
1650Lx800Wx1700D Integrated Waste Management Facilities
B
CORBEL TYPE A Phase 1 B
TL +40.499
REFER TO CORBEL
REINFORCEMENT FOR
Design Package
DETAILS
1650Lx800Wx1700D
2.3.14.01.01
CORBEL TYPE A
RC BEAM TL +40.499 PROCESS BUILDING VOL. 1 (BUNKER) &
REFER TO CORBEL 2.5.14 WASTEWATER TREATMENT PLAN
REINFORCEMENT FOR STRUCTURAL DESIGN
DETAILS
800

800
Drawing Title
800 PROCESS BUILDING - BUNKER
CRANE RUNWAY BEAM
CONNECTION DETAILS - TYPE A
SHEET 1 OF 2
UNDER SEPARATE SUBMISSION
A Drawing Number Revision A
IWMF1_13-133_300_125631 1
1650
Date: 19/11/21 Scale (at A1) Format
Drawn by: Melissa M As indicated A1
1 SECTION TYPE A CRANE RUNWAY BEAM 1A SECTION
Checked by: Martin H Status
- 1 : 10 CONNECTION DETAIL TO RC COLUMN - 1 : 10
Approved by:Kenny Y DES

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

NOTES: Revision Schedule

No. Date Description Checked by Approved by


PBC 1. FOR GENERAL NOTES, REFER TO DRAWING NO.
IWMF1-13_133_300_120001 AND 120002. 0 19-NOV-2021 DDA SUBMISSION MH KY
1 08-APR-2022 DDA SUBMISSION MH KY
H 2. FOR TYPICAL DETAILS, REFER TO DRAWING NO.
H
IWMF1_13-133_300_120101, 120111 AND 120121

4
PBD SERIES.

3. THE STRUCTURAL PROVISION FOR THE CRANE

4
IN THIS DRAWING IS FOR INFORMATION ONLY.
PBE IT SHALL BE REVIEWED IN CONJUCTION WITH
THE E&M DESIGN.

4. FOR CRANE TRACK TOLERANCE REQUIREMENT,


RC BEAM 1090 420 REFER TO DDA PACKAGE 2.3.16.01.02 MECHANICAL
WORKS DESIGN - WASTE CRANE AND GRAPPLE,
DRAWING NO. IWMF1_43-211_250_000102.
RC COLUMN

BEAM MARK SIZE


Employer
RWB-01 UB914x419x388
RWB-01 RWB-02 UB610x305x179
G G
RWB-03 UB914x305x201
20mm THK. RWB-04 UC254x254x107
STIFFENER PLATES 4A RWB-05 UC305x305x137
12 - ST-01 UB305x127x42 Supervising Officer

450 ST-02 UB610x305x179


LENGTH
12
RC PLINTH

150
250 + 41.450
500x800x16 Main Contractor
BASE PLATE
ST-02

100

60
6-M30x400mm 12
CAST-IN HEADED BOLTS

150
WITH NUT AND WASHER

80
10

340
F 4-M30 BOLTS Designers F

150

120
500x500x30 WITH 75MM SLOT HOLE
BASE PLATE

75
1000
100

120
1650Lx800Wx1700D
CORBEL TYPE A
TL +40.499

150

120
12
REFER TO CORBEL Design Checker

340
REINFORCEMENT FOR
DETAILS

80
12
60 300 60
RWB-01
500
20mm THK. 20mm THK

60
STIFFENER PLATES PLATE
+ 40.499

1650 6-M30x250mm
E E
CAST-IN HEADED BOLTS
WITH NUT AND WASHER
Certification

RC BEAM

2 TYPE A BOTTOM CONNECTION DETAILS


- 1 : 10
4 STEEL BEAM TIE BACK CONNECTION DETAILS

D
- 1 : 10
FOR MARKUP D

RC BEAM
600

RC COLUMN
500
1090
RWB-01
60 380 60 RC PLINTH

20mm THK.
16mm THK. TIE PLATE STIFFENER PLATE
C 500 C

60
3-M30x250mm 10 1200 500x500x30
HEADED STUD ANCHORS 60 80 3-M30 BASE PLATE
8 BOLTS
250 16
10

340
90

60

60
110

110

110

800
950
400

500
110

60 110

60 110

ST-02 Project Name

340
1650Lx800Wx1700D Contract No. EP/SP/66/12
90

CORBEL TYPE A 500x800x16 Integrated Waste Management Facilities


TL +40.499 BASE PLATE
3-M30 Phase 1
B BOLTS 60 60 REFER TO CORBEL B
REINFORCEMENT FOR
8 DETAILS
L150x150x16
Design Package
200x400x16mm THK + 40.499
EMBED PLATE 2.3.14.01.01
6-M30x250mm PROCESS BUILDING VOL. 1 (BUNKER) &
CAST-IN HEADED BOLTS 2.5.14 WASTEWATER TREATMENT PLAN
WITH NUT AND WASHER STRUCTURAL DESIGN
20mm THK. Drawing Title
1650 STIFFENER PLATE
PROCESS BUILDING - BUNKER
CRANE RUNWAY BEAM
RC BEAM CONNECTION DETAILS - TYPE A
SHEET 2 OF 2
UNDER SEPARATE SUBMISSION
A Drawing Number Revision A
3 TYPE A TOP CONNECTION DETAILS 4A STEEL BEAM TIE BACK CONNECTION DETAILS IWMF1_13-133_300_125632 1
- 1 : 10 - 1 : 10
Date: 19/11/21 Scale (at A1) Format
Drawn by: Melissa M 1 : 10
As indicated A1
Checked by: Martin H Status
Approved by:Kenny Y DES

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
Revision Schedule
NOTES:
PB27 PB26 PB17 PB16 PB7 PB6 No. Date Description Checked by Approved by
1. FOR GENERAL NOTES, REFER TO DRAWING NO.
IWMF1-13_133_300_120001 AND 120002. 0 19-NOV-2021 DDA SUBMISSION MH KY
1 08-APR-2022 DDA SUBMISSION MH KY
H H
PB32 PB31PB30PB29PB28 PB25PB24PB23PB22PB21PB20PB19PB18 PB15PB14PB13PB12PB11PB10 PB9 PB8 PB5 PB4 PB3 PB2 PB1 2. FOR TYPICAL DETAILS, REFER TO DRAWING NO.
IWMF1_13-133_300_120101, 120111 AND 120121
SERIES.

3. THE STRUCTURAL PROVISION FOR THE CRANE


IN THIS DRAWING IS FOR INFORMATION ONLY.
IT SHALL BE REVIEWED IN CONJUCTION WITH
THE E&M DESIGN.

4. FOR CRANE TRACK TOLERANCE REQUIREMENT,


PBA REFER TO DDA PACKAGE 2.3.16.01.02 MECHANICAL
WORKS DESIGN - WASTE CRANE AND GRAPPLE,
DRAWING NO. IWMF1_43-211_250_000102.
PBB
BEAM MARK SIZE
Employer
RWB-01 UB914x419x388
PBC RWB-02 UB610x305x179
G G
RWB-03 UB914x305x201
RWB-04 UC254x254x107

1
PBD RWB-05 UC305x305x137
Supervising Officer
ST-01 UB305x127x42
ST-02 UB610x305x179

PBE 1

Main Contractor

PBF

PBG
F Designers F

PBH

PBJ Design Checker

+38.100 WALKWAY ROOF LEVEL KEYPLAN


RC COLUMN 1A ℄
- 220
E E

40 70 70 40
10 1200 Certification
3-M20 3-M20
60 80 16mm THK. 60 60 BOLTS 3-M20
BOLTS 250 TIE PLATE BOLTS 16mm THK. TIE PLATE
3-M20x250mm
HEADED STUD ANCHORS 3 + 41.450
+ 41.450
125634 RWB-01
75 25

8
200

12
25 75

20mm THK. 300


8 STIFFENER PLATES
L150x150x16

D 200x270x16mm THK
RWB-01
FOR MARKUP D
EMBED PLATE 12
20mm THK.
STIFFENER PLATES

6-M20x400mm GRADE 8.8


CAST-IN HEADED BOLTS
60 60 WITH NUT AND WASHER
2 500x300x30
RC BEAM 500x300x30 125634 BASE PLATE
BASE PLATE
+ 40.499
+ 40.499

30
C 6-M20x400mm C

400
CAST-IN HEADED BOLTS

400
WITH NUT AND WASHER

900
900

100 300 100 100 60 90 90 60 100

1650Lx500Wx1700D
CORBEL TYPE A1 Project Name
TL +40.499 1650Lx500Wx1700D
REFER TO CORBEL CORBEL TYPE A1 Contract No. EP/SP/66/12
REINFORCEMENT FOR TL +40.499 Integrated Waste Management Facilities

1700
DETAILS
1700

REFER TO CORBEL Phase 1


B REINFORCEMENT FOR B
DETAILS
Design Package
2.3.14.01.01
PROCESS BUILDING VOL. 1 (BUNKER) &
2.5.14 WASTEWATER TREATMENT PLAN
STRUCTURAL DESIGN
500 Drawing Title

800
800

PROCESS BUILDING - BUNKER


RC COLUMN CRANE RUNWAY BEAM
CONNECTION DETAILS - TYPE A1
SHEET 1 OF 2
UNDER SEPARATE SUBMISSION
A Drawing Number Revision A
IWMF1_13-133_300_125633 1
RC BEAM
1650 Date: 19/11/21 Scale (at A1) Format
TYPE A1 CRANE RUNWAY BEAM Drawn by: Melissa M As indicated A1
1 SECTION CONNECTION DETAIL TO RC COLUMN 1A SECTION
Checked by: Martin H Status
- 1 : 10 - 1 : 10
Approved by:Kenny Y DES

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES: Revision Schedule

1. FOR GENERAL NOTES, REFER TO DRAWING NO. No. Date Description Checked by Approved by
IWMF1-13_133_300_120001 AND 120002. 0 19-NOV-2021 DDA SUBMISSION MH KY
1 08-APR-2022 DDA SUBMISSION MH KY
H 2. FOR TYPICAL DETAILS, REFER TO DRAWING NO. H
IWMF1_13-133_300_120101, 120111 AND 120121
SERIES.

3. THE STRUCTURAL PROVISION FOR THE CRANE


IN THIS DRAWING IS FOR INFORMATION ONLY.
RC BEAM IT SHALL BE REVIEWED IN CONJUCTION WITH
THE E&M DESIGN.

4. FOR CRANE TRACK TOLERANCE REQUIREMENT,


RC COLUMN 1650 REFER TO DDA PACKAGE 2.3.16.01.02 MECHANICAL
WORKS DESIGN - WASTE CRANE AND GRAPPLE,
RWB-01
DRAWING NO. IWMF1_43-211_250_000102.
1300

BEAM MARK SIZE


Employer
RWB-01 UB914x419x388
RWB-02 UB610x305x179
G 20mm THK. 20mm THK. G
STIFFENER PLATES STIFFENER PLATES RWB-03 UB914x305x201
1050 500 100 RWB-04 UC254x254x107
RWB-05 UC305x305x137
12 40 60 300 60 40 12 ST-01 UB305x127x42 Supervising Officer

ST-02 UB610x305x179

Main Contractor

60
6-M20x400mm

90
CAST-IN HEADED BOLTS

300

500
WITH NUT AND WASHER

90
500x300x30

60
BASE PLATE
F Designers F

12 12
1650Lx500Wx1700D
CORBEL TYPE A1
TL +40.449 Design Checker
REFER TO CORBEL
REINFORCEMENT FOR
DETAILS

E E

Certification
2 TYPE A1 BOTTOM CONNECTION DETAILS
- 1 : 10

D
FOR MARKUP D

RC BEAM

RC COLUMN
RWB-01

20mm THK. 20mm THK.


STIFFENER PLATES STIFFENER PLATES
3-M20
BOLTS
C C
10 1200
60 80
3-M20x250mm 250 16
HEADED STUD ANCHORS 60 60 1650Lx500Wx1700D
CORBEL TYPE A1
TL +40.449
65 70 70 65

40 70 70 40

40 70 70 40

REFER TO CORBEL
REINFORCEMENT FOR
270

220

DETAILS

500x300x30
BASE PLATE Project Name

8 Contract No. EP/SP/66/12


8
Integrated Waste Management Facilities
B 200x270x16mm THK 3-M20 Phase 1 B
EMBED PLATE L150x150x16 BOLTS

16mm THK. TIE PLATE Design Package


2.3.14.01.01
PROCESS BUILDING VOL. 1 (BUNKER) &
2.5.14 WASTEWATER TREATMENT PLAN
STRUCTURAL DESIGN
Drawing Title
PROCESS BUILDING - BUNKER
CRANE RUNWAY BEAM
CONNECTION DETAILS - TYPE A1
3 TYPE A1 TOP CONNECTION DETAILS SHEET 2 OF 2
- 1 : 10 UNDER SEPARATE SUBMISSION
A Drawing Number Revision A
IWMF1_13-133_300_125634 1

Date: 19/11/21 Scale (at A1) Format


Drawn by: Melissa M 1 : 10
As indicated A1
Checked by: Martin H Status
Approved by:Kenny Y DES

1 2 3 4 5 6 7 8 9 10 11 12