0% found this document useful (0 votes)
27 views18 pages

قيم الانشطة لموsقع اسكان عرر o4

The document contains details of various construction activities for a building project. All activities have a status of "Not Started" and are part of the work breakdown structure code NHC#RAE-2.21000451.4.1. The activities span different phases of the project including site work, structure, finishes and MEP.

Uploaded by

memo4fever11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views18 pages

قيم الانشطة لموsقع اسكان عرر o4

The document contains details of various construction activities for a building project. All activities have a status of "Not Started" and are part of the work breakdown structure code NHC#RAE-2.21000451.4.1. The activities span different phases of the project including site work, structure, finishes and MEP.

Uploaded by

memo4fever11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

task_code status_codwbs_id

Activity ID Activity StaWBS Code


FIN1 Not Starte NHC#RAE-2.
FIN10 Not Starte NHC#RAE-2.
FIN100 Not Starte NHC#RAE-2.
FIN11 Not Starte NHC#RAE-2.
FIN20 Not Starte NHC#RAE-2.
FIN21 Not Starte NHC#RAE-2.
FIN30 Not Starte NHC#RAE-2.
FIN300 Not Starte NHC#RAE-2.
FIN31 Not Starte NHC#RAE-2.
FIN310 Not Starte NHC#RAE-2.
FIN320 Not Starte NHC#RAE-2.
FIN330 Not Starte NHC#RAE-2.
FIN340 Not Starte NHC#RAE-2.
FIN350 Not Starte NHC#RAE-2.
FIN360 Not Starte NHC#RAE-2.
FIN370 Not Starte NHC#RAE-2.
FIN380 Not Starte NHC#RAE-2.
FIN390 Not Starte NHC#RAE-2.
FIN40 Not Starte NHC#RAE-2.
FIN41 Not Starte NHC#RAE-2.
FIN50 Not Starte NHC#RAE-2.
FIN51 Not Starte NHC#RAE-2.
FIN60 Not Starte NHC#RAE-2.
FIN61 Not Starte NHC#RAE-2.
FIN70 Not Starte NHC#RAE-2.
FIN71 Not Starte NHC#RAE-2.
FIN80 Not Starte NHC#RAE-2.
FIN81 Not Starte NHC#RAE-2.
FIN90 Not Starte NHC#RAE-2.
FIN91 Not Starte NHC#RAE-2.
task_name
Activity Name
R.F. Parapet Block Work - No.334/R/O4/NKHL B
G.F. EX. & IN. Block Work - No.334/R/O4/NKHL B
G.F. Painting Final Coat walls&Slabs Work - No.334/R/O4/NKHL B
F.F. EX. & IN. Block Work - No.334/R/O4/NKHL B
G.F. Perparation & Base layer for Plastering Work - No.334/R/O4/NKHL B
F.F. Perparation & Base layer for Plastering Work - No.334/R/O4/NKHL B
G.F. Plastering Walls & Slab Work - No.334/R/O4/NKHL B
Scaffolding,Perparation & Base layer for EX. Plastering Work - No.334/R/O4/NKHL B
F.F. Plastering Walls & Slab Work - No.334/R/O4/NKHL B
EX. Plastering " includding Parapet wall " Work - No.334/R/O4/NKHL B
Roof Flooring Work (Foamy Conc., Water Proof., Heat Proof., Gravel, Tiles,..) - No.334/R/O4/NKHL B
Perparation & Texture Layer for EX. Painting Work - No.334/R/O4/NKHL B
EX. Painting 1st Coat for V.Faces & Parapet - No.334/R/O4/NKHL B
EX. Painting Final Coat for V.Faces & Parapet - No.334/R/O4/NKHL B
Installing Metal Doors - All Floors - No.334/R/O4/NKHL B
Installing Aluminum Windows - All Floors - No.334/R/O4/NKHL B
Installing Wooden Doors - All Floors - No.334/R/O4/NKHL B
Installing Handrails,Stairs & Any other metal works - All Floors - No.334/R/O4/NKHL B
G.F. Water Proofing for wet area Work - No.334/R/O4/NKHL B
F.F. Water Proofing for wet area Work - No.334/R/O4/NKHL B
G.F. Perparation & Putty Layer for Painting Work - No.334/R/O4/NKHL B
F.F. Ceramic Tiles for walls Work - No.334/R/O4/NKHL B
G.F. Ceramic Tiles for walls Work - No.334/R/O4/NKHL B
F.F. Perparation & Putty Layer for Painting Work - No.334/R/O4/NKHL B
G.F. All Flooring Tiles Type's Work - No.334/R/O4/NKHL B
F.F. All Flooring Tiles Type's Work - No.334/R/O4/NKHL B
In.& Ex. Granite Flooring for Stairs&Entrances - All Floors - No.334/R/O4/NKHL B
F.F. Painting 1st Coat walls&Slabs Work - No.334/R/O4/NKHL B
G.F. Painting 1st Coat walls&Slabs Work - No.334/R/O4/NKHL B
F.F. Painting Final Coat walls&Slabs Work - No.334/R/O4/NKHL B
start_date target_drtn_hr_cnt end_date target_cost
(*)Start Original Duration(d) (*)Finish (*)Budgeted Total Cost
8/17/2022 08:00 3 8/20/2022 16:00 7887.85
8/13/2022 08:00 8 8/21/2022 16:00 15775.75
10/15/2022 08:00 2 10/16/2022 16:00 3943.95
8/29/2022 08:00 7 9/5/2022 16:00 15775.75
8/28/2022 08:00 3 8/30/2022 16:00 7887.85
9/12/2022 08:00 3 9/14/2022 16:00 7887.85
8/31/2022 08:00 9 9/10/2022 16:00 15775.75
9/6/2022 08:00 6 9/12/2022 16:00 11831.8
9/15/2022 08:00 7 9/22/2022 16:00 15775.75
9/12/2022 08:00 8 9/20/2022 16:00 23663.65
9/21/2022 08:00 12 10/5/2022 16:00 23663.65
10/6/2022 08:00 5 10/11/2022 16:00 7887.85
10/10/2022 08:00 3 10/12/2022 16:00 3943.95
10/13/2022 08:00 3 10/16/2022 16:00 3943.95
9/19/2022 08:00 4 9/22/2022 16:00 1972
10/5/2022 08:00 4 10/9/2022 16:00 7887.85
10/10/2022 08:00 4 10/13/2022 16:00 7887.85
10/11/2022 08:00 2 10/12/2022 16:00 1972
9/6/2022 12:30 3 9/10/2022 16:00 5915.9
9/19/2022 12:30 3 9/22/2022 16:00 5915.9
9/13/2022 08:00 7 9/20/2022 16:00 3943.95
9/25/2022 08:00 4 9/28/2022 16:00 5915.9
9/11/2022 08:00 4 9/14/2022 16:00 5915.9
9/27/2022 08:00 5 10/2/2022 16:00 3943.95
9/25/2022 08:00 6 10/1/2022 16:00 19719.7
10/3/2022 08:00 6 10/9/2022 16:00 19719.7
10/10/2022 08:00 3 10/12/2022 16:00 7887.85
10/6/2022 08:00 3 10/9/2022 16:00 3943.95
10/10/2022 08:00 4 10/13/2022 16:00 3943.95
10/12/2022 08:00 2 10/13/2022 16:00 3943.95
total_float_hr_cnt sched_complete_pct actv_code_resource_lidelete_record_flag
(*)Total Float(d) (*)Schedule % Complete(MHC-Contra(*)Resourc Delete This Row
11 0 RAE02.3 Blook Mason, Laboure, Housing Financial
8 0 RAE02.3 Laboure, Blook Mason, Helper Carpenter, Housing Financial
3 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.3 Laboure, Blook Mason, Housing Financial
8 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
0 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
8 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
4 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
0 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
4 0 RAE02.4 Plaster Mason, Laboure, Housing Financial
4 0 RAE02.4 Laboure, Proofing Tech., Housing Financial
4 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.4 Painter, Housing Financial
3 0 RAE02.4 Painter, Housing Financial
6 0 RAE02.4 Door - Window Tech., Housing Financial
0 0 RAE02.4 Door - Window Tech., Housing Financial
5 0 RAE02.4 Door - Window Tech., Housing Financial
6 0 RAE02.4 Door - Window Tech., Housing Financial
17 0 RAE02.4 Proofing Tech., Laboure, Housing Financial
7 0 RAE02.4 Proofing Tech., Laboure, Housing Financial
8 0 RAE02.4 Painter, Housing Financial
3 0 RAE02.4 Ceramic Mason, Laboure, Housing Financial
13 0 RAE02.4 Ceramic Mason, Laboure, Housing Financial
0 0 RAE02.4 Painter, Housing Financial
6 0 RAE02.4 Laboure, Ceramic Mason, Housing Financial
0 0 RAE02.4 Laboure, Ceramic Mason, Housing Financial
0 0 RAE02.4 Ceramic Mason, Laboure, Housing Financial
3 0 RAE02.4 Painter, Housing Financial
3 0 RAE02.4 Painter, Housing Financial
5 0 RAE02.4 Painter, Housing Financial
arpenter, Housing Financial

ng Financial
ng Financial

ng Financial
ng Financial
ng Financial
task_code status_code wbs_id
Activity ID Activity Status WBS Code
SITE10 Not Started NHC#RAE-2.21000451.4.1.
SITE30 Not Started NHC#RAE-2.21000451.4.1.
SITE60 Not Started NHC#RAE-2.21000451.4.1.
SITE100 Not Started NHC#RAE-2.21000451.4.1.
SITE40 Not Started NHC#RAE-2.21000451.4.1.
STR.60 Not Started NHC#RAE-2.21000451.4.1.
STR.90 Not Started NHC#RAE-2.21000451.4.1.
STR.20 Not Started NHC#RAE-2.21000451.4.1.
STR.50 Not Started NHC#RAE-2.21000451.4.1.
STR.80 Not Started NHC#RAE-2.21000451.4.1.
STR.120 Not Started NHC#RAE-2.21000451.4.1.
STR.100 Not Started NHC#RAE-2.21000451.4.1.
FIN30 Not Started NHC#RAE-2.21000451.4.1.
FIN10 Not Started NHC#RAE-2.21000451.4.1.
FIN360 Not Started NHC#RAE-2.21000451.4.1.
FIN70 Not Started NHC#RAE-2.21000451.4.1.
FIN100 Not Started NHC#RAE-2.21000451.4.1.
FIN40 Not Started NHC#RAE-2.21000451.4.1.
FIN310 Not Started NHC#RAE-2.21000451.4.1.
FIN320 Not Started NHC#RAE-2.21000451.4.1.
FIN350 Not Started NHC#RAE-2.21000451.4.1.
MEP40 Not Started NHC#RAE-2.21000451.4.1.
TEST10 Not Started NHC#RAE-2.21000451.4.1
STR.150 Not Started NHC#RAE-2.21000451.4.1.
STR.110 Not Started NHC#RAE-2.21000451.4.1.
STR.130 Not Started NHC#RAE-2.21000451.4.1.
STR.140 Not Started NHC#RAE-2.21000451.4.1.
FIN370 Not Started NHC#RAE-2.21000451.4.1.
FIN380 Not Started NHC#RAE-2.21000451.4.1.
FIN390 Not Started NHC#RAE-2.21000451.4.1.
MEP90 Not Started NHC#RAE-2.21000451.4.1.
MEP50 Not Started NHC#RAE-2.21000451.4.1.
MEP80 Not Started NHC#RAE-2.21000451.4.1.
MEP10 Not Started NHC#RAE-2.21000451.4.1.
MEP20 Not Started NHC#RAE-2.21000451.4.1.
STR.30 Not Started NHC#RAE-2.21000451.4.1.
STR.10 Not Started NHC#RAE-2.21000451.4.1.
STR.40 Not Started NHC#RAE-2.21000451.4.1.
STR.70 Not Started NHC#RAE-2.21000451.4.1.
FIN60 Not Started NHC#RAE-2.21000451.4.1.
FIN50 Not Started NHC#RAE-2.21000451.4.1.
FIN20 Not Started NHC#RAE-2.21000451.4.1.
FIN90 Not Started NHC#RAE-2.21000451.4.1.
FIN31 Not Started NHC#RAE-2.21000451.4.1.
FIN11 Not Started NHC#RAE-2.21000451.4.1.
FIN71 Not Started NHC#RAE-2.21000451.4.1.
FIN91 Not Started NHC#RAE-2.21000451.4.1.
FIN41 Not Started NHC#RAE-2.21000451.4.1.
FIN51 Not Started NHC#RAE-2.21000451.4.1.
FIN61 Not Started NHC#RAE-2.21000451.4.1.
FIN21 Not Started NHC#RAE-2.21000451.4.1.
FIN81 Not Started NHC#RAE-2.21000451.4.1.
FIN1 Not Started NHC#RAE-2.21000451.4.1.
FIN300 Not Started NHC#RAE-2.21000451.4.1.
FIN80 Not Started NHC#RAE-2.21000451.4.1.
FIN330 Not Started NHC#RAE-2.21000451.4.1.
FIN340 Not Started NHC#RAE-2.21000451.4.1.
MEP60 Not Started NHC#RAE-2.21000451.4.1.
SITE20 Not Started NHC#RAE-2.21000451.4.1.
SITE50 Not Started NHC#RAE-2.21000451.4.1.
SITE70 Not Started NHC#RAE-2.21000451.4.1.
SITE80 Not Started NHC#RAE-2.21000451.4.1.
SITE90 Not Started NHC#RAE-2.21000451.4.1.
SITE110 Not Started NHC#RAE-2.21000451.4.1.
SITE120 Not Started NHC#RAE-2.21000451.4.1.
SITE150 Not Started NHC#RAE-2.21000451.4.1.
SITE130 Not Started NHC#RAE-2.21000451.4.1.
SITE140 Not Started NHC#RAE-2.21000451.4.1.
SITE160 Not Started NHC#RAE-2.21000451.4.1.
task_name
Activity Name
ENG. Cut & Fill Work
Fence Concrete Work (Foundition,Ground beam,Colums - Interance)
Fence Block Work ( Includding Parapet Beam )
Finish Work for G.Site (Parking,Con.Tiles,..... )
UnderGround Water Tanks Works
Ground Beam Work including MEP Work
Slab on grade Work
R.C. Footing Work
Backfilling between Foundation with Compaction Work
Backfilling between Ground Beam with Compaction Work
F.F. Columns Work
G.F. Columns Work
G.F. Plastering Walls & Slab Work
G.F. EX. & IN. Block Work
Installing Metal Doors - All Floors
G.F. All Flooring Tiles Type's Work
G.F. Painting Final Coat walls&Slabs Work
G.F. Water Proofing for wet area Work
EX. Plastering " includding Parapet wall " Work
Roof Flooring Work (Foamy Conc., Water Proof., Heat Proof., Gravel, Tiles,..)
EX. Painting Final Coat for V.Faces & Parapet
Fit and Connect Saintary ware - All Floors
TESTING & COMMISSION FOR Building
R.F. Slab & Parapet Beam Work
G.F. Slab & Beams Work
F.F. Slab & Beams Work
R.F. Columns & Col. Neck's for F.F. Roof Parapet
Installing Aluminum Windows - All Floors
Installing Wooden Doors - All Floors
Installing Handrails,Stairs & Any other metal works - All Floors
3rd.fix Electrical Devices Installation - All Floors
G.F. 1st. fix Electrical Work "Piping,Boxes,......"
2nd fix Electrical Work "Wiring, Cabels,Panalboards,......"- All Floors
G.F.1st fix Plumping & AC "Piping,Fittings,Valves,....."
F.F. 1st fix Plumping & AC "Piping,Fittings,Valves,....."
Col. Neck's Work
P.C. Footing Work
Foundation Isolation Work
Ground beam Isolation Work
G.F. Ceramic Tiles for walls Work
G.F. Perparation & Putty Layer for Painting Work
G.F. Perparation & Base layer for Plastering Work
G.F. Painting 1st Coat walls&Slabs Work
F.F. Plastering Walls & Slab Work
F.F. EX. & IN. Block Work
F.F. All Flooring Tiles Type's Work
F.F. Painting Final Coat walls&Slabs Work
F.F. Water Proofing for wet area Work
F.F. Ceramic Tiles for walls Work
F.F. Perparation & Putty Layer for Painting Work
F.F. Perparation & Base layer for Plastering Work
F.F. Painting 1st Coat walls&Slabs Work
R.F. Parapet Block Work
Scaffolding,Perparation & Base layer for EX. Plastering Work
In.& Ex. Granite Flooring for Stairs&Entrances - All Floors
Perparation & Texture Layer for EX. Painting Work
EX. Painting 1st Coat for V.Faces & Parapet
F.F. 1st. fix Electrical Work "Piping,Boxes,......"
Anti Termite under Foundation Work
G.Site Backfilling with Compaction
Fence Perparation & Base layer for Plastering Work
Fence Plastering Work
Fence Perparation & Texture Layer for EX. Painting Work
Fence Painting 1st Coat
Fence Painting Final Coat
Electrical Installation for G.SITE & FENCE (Meter,Lighting,Outlet,...)
Water supply & Sewage Networks
Fence&G.Site 1st. fix Electrical Work"Piping,Wiring,Cables,Manhole,.."
Pump & Main Water Supply Network Connection
start_date target_drtn_hr_cnt end_date target_cost
(*)Start Original Duration(d) (*)Finish (*)Budgeted Total Cost
5/8/2022 08:00 6 5/14/2022 16:00 23663.65
6/15/2022 08:00 21 7/13/2022 16:00 23663.65
7/21/2022 08:00 9 7/31/2022 16:00 7887.85
10/2/2022 08:00 10 10/12/2022 16:00 39439.35
6/19/2022 08:00 12 7/2/2022 16:00 39439.35
6/12/2022 08:00 6 6/18/2022 16:00 11831.8
6/27/2022 08:00 2 6/28/2022 16:00 3943.95
5/18/2022 08:00 6 5/24/2022 16:00 19719.7
6/2/2022 08:00 8 6/11/2022 16:00 7887.85
6/22/2022 08:00 4 6/26/2022 16:00 3943.95
7/21/2022 08:00 4 7/25/2022 16:00 7887.85
6/29/2022 08:00 4 7/3/2022 16:00 7887.85
8/31/2022 08:00 9 9/10/2022 16:00 15775.75
8/13/2022 08:00 8 8/21/2022 16:00 15775.75
9/19/2022 08:00 4 9/22/2022 16:00 1972
9/25/2022 08:00 6 10/1/2022 16:00 19719.7
10/15/2022 08:00 2 10/16/2022 16:00 3943.95
9/6/2022 12:30 3 9/10/2022 16:00 5915.9
9/12/2022 08:00 8 9/20/2022 16:00 23663.65
9/21/2022 08:00 12 10/5/2022 16:00 23663.65
10/13/2022 08:00 3 10/16/2022 16:00 3943.95
10/10/2022 08:00 6 10/16/2022 16:00 19719.7
10/20/2022 08:00 3 10/23/2022 16:00 78878.7
8/21/2022 08:00 7 8/28/2022 16:00 11831.8
7/4/2022 08:00 9 7/18/2022 16:00 17747.7
7/27/2022 08:00 9 8/6/2022 16:00 17747.7
8/9/2022 08:00 4 8/13/2022 16:00 7887.85
10/5/2022 08:00 4 10/9/2022 16:00 7887.85
10/10/2022 08:00 4 10/13/2022 16:00 7887.85
10/11/2022 08:00 2 10/12/2022 16:00 1972
9/25/2022 08:00 6 10/1/2022 16:00 11831.8
8/22/2022 08:00 5 8/27/2022 16:00 7887.85
9/17/2022 08:00 6 9/22/2022 16:00 23663.65
8/22/2022 08:00 4 8/25/2022 16:00 11831.8
9/6/2022 08:00 4 9/10/2022 16:00 11831.8
5/25/2022 08:00 3 5/28/2022 16:00 7887.85
5/16/2022 08:00 2 5/17/2022 16:00 5915.9
5/30/2022 08:00 2 5/31/2022 16:00 1972
6/20/2022 08:00 2 6/21/2022 16:00 1972
9/11/2022 08:00 4 9/14/2022 16:00 5915.9
9/13/2022 08:00 7 9/20/2022 16:00 3943.95
8/28/2022 08:00 3 8/30/2022 16:00 7887.85
10/10/2022 08:00 4 10/13/2022 16:00 3943.95
9/15/2022 08:00 7 9/22/2022 16:00 15775.75
8/29/2022 08:00 7 9/5/2022 16:00 15775.75
10/3/2022 08:00 6 10/9/2022 16:00 19719.7
10/12/2022 08:00 2 10/13/2022 16:00 3943.95
9/19/2022 12:30 3 9/22/2022 16:00 5915.9
9/25/2022 08:00 4 9/28/2022 16:00 5915.9
9/27/2022 08:00 5 10/2/2022 16:00 3943.95
9/12/2022 08:00 3 9/14/2022 16:00 7887.85
10/6/2022 08:00 3 10/9/2022 16:00 3943.95
8/17/2022 08:00 3 8/20/2022 16:00 7887.85
9/6/2022 08:00 6 9/12/2022 16:00 11831.8
10/10/2022 08:00 3 10/12/2022 16:00 7887.85
10/6/2022 08:00 5 10/11/2022 16:00 7887.85
10/10/2022 08:00 3 10/12/2022 16:00 3943.95
9/6/2022 08:00 5 9/11/2022 16:00 7887.85
5/15/2022 08:00 1 5/15/2022 16:00 1972
7/14/2022 08:00 6 7/20/2022 16:00 3943.95
8/4/2022 08:00 3 8/7/2022 16:00 7887.85
8/8/2022 08:00 7 8/15/2022 16:00 15775.75
8/20/2022 08:00 5 8/24/2022 16:00 7887.85
10/10/2022 08:00 3 10/12/2022 16:00 3943.95
10/17/2022 08:00 3 10/19/2022 16:00 3943.95
10/13/2022 08:00 6 10/19/2022 16:00 3943.95
7/18/2022 08:00 9 7/27/2022 16:00 7887.85
7/28/2022 08:00 4 8/1/2022 16:00 3943.95
10/13/2022 08:00 4 10/17/2022 16:00 7887.85
total_float_hr_cnt sched_complete_pct actv_code_mhc_contract_weight_id resource_lidelete_record_flag
(*)Total Float(d) (*)Schedule % Complete(MHC-Contract Weight (*)Resourc Delete This Row
0 100 RAE02.1 Laboure, Housing Financial
2 0 RAE02.2 Carpenter, Helper Carpenter, Steel Fi
2 0 RAE02.3 Blook Mason, Helper Carpenter, Stee
6 0 RAE02.5 Laboure, Ceramic Mason, Housing Fin
2 0 RAE02.5 Laboure, Helper Carpenter, Blook Ma
0 0 RAE02.2 Carpenter, Steel Fixer, Helper Carpen
0 0 RAE02.2 Steel Fixer, Laboure, Helper Carpente
0 100 RAE02.2 Steel Fixer, Carpenter, Steel Fixer Hel
0 25 RAE02.1 Laboure, Housing Financial
0 0 RAE02.1 Laboure, Housing Financial
0 0 RAE02.3 Steel Fixer, Helper Carpenter, Steel Fi
0 0 RAE02.3 Carpenter, Steel Fixer, Helper Carpen
8 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
8 0 RAE02.3 Laboure, Blook Mason, Helper Carpen
6 0 RAE02.4 Door - Window Tech., Housing Financ
6 0 RAE02.4 Laboure, Ceramic Mason, Housing Fin
3 0 RAE02.4 Painter, Housing Financial
17 0 RAE02.4 Proofing Tech., Laboure, Housing Fina
4 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
4 0 RAE02.4 Laboure, Proofing Tech., Housing Fina
3 0 RAE02.4 Painter, Housing Financial
3 0 RAE02.6 Plumber, Laboure, Housing Financial
0 0 RAE02.7 Plumber, Laboure, Electrician, Painter
11 0 RAE02.3 Steel Fixer, Electrician, Helper Carpen
0 0 RAE02.3 Carpenter, Electrician, Steel Fixer, He
0 0 RAE02.3 Steel Fixer, Electrician, Helper Carpen
11 0 RAE02.3 Steel Fixer, Helper Carpenter, Steel Fi
0 0 RAE02.4 Door - Window Tech., Housing Financ
5 0 RAE02.4 Door - Window Tech., Housing Financ
6 0 RAE02.4 Door - Window Tech., Housing Financ
14 0 RAE02.6 Electrician, Electrical Helper, Housing
8 0 RAE02.6 Electrical Helper, Electrician, Housing
20 0 RAE02.6 Electrician, Electrical Helper, Housing
9 0 RAE02.6 Plumber, Laboure, Housing Financial
1 0 RAE02.6 Plumber, Laboure, Housing Financial
0 100 RAE02.2 Steel Fixer Helper, Carpenter, Helper
0 100 RAE02.2 Carpenter, Helper Carpenter, Laboure
0 100 RAE02.2 Proofing Tech., Laboure, Housing Fina
0 0 RAE02.2 Proofing Tech., Laboure, Housing Fina
13 0 RAE02.4 Ceramic Mason, Laboure, Housing Fin
8 0 RAE02.4 Painter, Housing Financial
8 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
3 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
0 0 RAE02.3 Laboure, Blook Mason, Housing Finan
0 0 RAE02.4 Laboure, Ceramic Mason, Housing Fin
5 0 RAE02.4 Painter, Housing Financial
7 0 RAE02.4 Proofing Tech., Laboure, Housing Fina
3 0 RAE02.4 Ceramic Mason, Laboure, Housing Fin
0 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
3 0 RAE02.4 Painter, Housing Financial
11 0 RAE02.3 Blook Mason, Laboure, Housing Finan
4 0 RAE02.4 Plaster Mason, Laboure, Housing Fina
0 0 RAE02.4 Ceramic Mason, Laboure, Housing Fin
4 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.4 Painter, Housing Financial
0 0 RAE02.6 Electrician, Electrical Helper, Housing
1 100 RAE02.2 Laboure, Housing Financial
2 0 RAE02.1 Laboure, Housing Financial
2 0 RAE02.5 Plaster Mason, Laboure, Housing Fina
2 0 RAE02.5 Plaster Mason, Laboure, Housing Fina
2 0 RAE02.5 Painter, Housing Financial
0 0 RAE02.5 Painter, Housing Financial
0 0 RAE02.5 Painter, Housing Financial
0 0 RAE02.6 Electrician, Electrical Helper, Housing
4 0 RAE02.6 Plumber, Laboure, Housing Financial
4 0 RAE02.6 Electrical Helper, Electrician, Housing
2 0 RAE02.6 Laboure, Plumber, Housing Financial
delete_record_flag
Delete This Row
Housing Financial
, Helper Carpenter, Steel Fixer, Steel Fixer Helper, Laboure, Proofing Tech., Housing Financial
on, Helper Carpenter, Steel Fixer, Carpenter, Steel Fixer Helper, Laboure, Housing Financial
Ceramic Mason, Housing Financial
Helper Carpenter, Blook Mason, Steel Fixer Helper, Steel Fixer, Carpenter, Proofing Tech., Housing Financial
, Steel Fixer, Helper Carpenter, Electrical Helper, Plumber, Steel Fixer Helper, Laboure, Housing Financial
, Laboure, Helper Carpenter, Steel Fixer Helper, Housing Financial
, Carpenter, Steel Fixer Helper, Helper Carpenter, Laboure, Housing Financial
Housing Financial
Housing Financial
, Helper Carpenter, Steel Fixer Helper, Carpenter, Laboure, Housing Financial
, Steel Fixer, Helper Carpenter, Steel Fixer Helper, Laboure, Housing Financial
ason, Laboure, Housing Financial
Blook Mason, Helper Carpenter, Housing Financial
ndow Tech., Housing Financial
Ceramic Mason, Housing Financial
ousing Financial
ech., Laboure, Housing Financial
ason, Laboure, Housing Financial
Proofing Tech., Housing Financial
ousing Financial
Laboure, Housing Financial
Laboure, Electrician, Painter, Door - Window Tech., Housing Financial
, Electrician, Helper Carpenter, Electrical Helper, Steel Fixer Helper, Carpenter, Plumber, Laboure, Housing Financial
, Electrician, Steel Fixer, Helper Carpenter, Electrical Helper, Steel Fixer Helper, Plumber, Laboure, Housing Financial
, Electrician, Helper Carpenter, Electrical Helper, Steel Fixer Helper, Carpenter, Plumber, Laboure, Housing Financial
, Helper Carpenter, Steel Fixer Helper, Carpenter, Laboure, Housing Financial
ndow Tech., Housing Financial
ndow Tech., Housing Financial
ndow Tech., Housing Financial
, Electrical Helper, Housing Financial
Helper, Electrician, Housing Financial
, Electrical Helper, Housing Financial
Laboure, Housing Financial
Laboure, Housing Financial
Helper, Carpenter, Helper Carpenter, Steel Fixer, Laboure, Housing Financial
, Helper Carpenter, Laboure, Housing Financial
ech., Laboure, Housing Financial
ech., Laboure, Housing Financial
Mason, Laboure, Housing Financial
ousing Financial
ason, Laboure, Housing Financial
ousing Financial
ason, Laboure, Housing Financial
Blook Mason, Housing Financial
Ceramic Mason, Housing Financial
ousing Financial
ech., Laboure, Housing Financial
Mason, Laboure, Housing Financial
ousing Financial
ason, Laboure, Housing Financial
ousing Financial
on, Laboure, Housing Financial
ason, Laboure, Housing Financial
Mason, Laboure, Housing Financial
ousing Financial
ousing Financial
, Electrical Helper, Housing Financial
Housing Financial
Housing Financial
ason, Laboure, Housing Financial
ason, Laboure, Housing Financial
ousing Financial
ousing Financial
ousing Financial
, Electrical Helper, Housing Financial
Laboure, Housing Financial
Helper, Electrician, Housing Financial
Plumber, Housing Financial
‫قيم انجاز االعمال النشطة الوحدة السكنية‬
Activity ID Activity Name
Budgeted ‫مرحلة االعمال طبقا لجدول صرف قيمة االعمال‬ Qty unit description M.P rate Equip. total no. of
Total Cost working hour

TAB(01) HO.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334 Building No.334


TAB(01) HO.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.1 V.SITE & FENCE WORK
TAB(01) HO.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.1.1 Structure Work
SITE10 ENG. Cut & Fill Work ‫االعمال الترابية للنموذج السكنى واالسوار‬ 740.00 m3 cut jcb 20.00 m3/hr jcb 4.63
SITE20 Anti Termite under Foundation Work ‫اعمال االساسات للنموذج السكنى واالسوار‬ m2 Anti termite 1 worker 15.62 m2/h labor 0.00
15.39 m3 concrete 1 Carpenter + 1 worker 0.81 m3/h labor 2.38
SITE30 Fence Concrete Work (Foundition,Ground beam,Colums - Interance) ‫اعمال االساسات للنموذج السكنى واالسوار‬ 3.05 Ton steel 1Steel fixer + 1 worker 62.50 kg/h labor 6.09
62.86 m2 isolation 1 worker 12.50 m2/h labor 0.63
12.50 m3 concrete 1 Carpenter + 1 worker 1.88 m3/h labor 0.83
0.20 Ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 0.50
SITE40 UnderGround Water Tanks Works ‫اعمال الموقع العام والخزانات واالسوار‬
325.00 Nos. Blocks 1M+1H 25.00 Nos./h labor 1.63
24.00 m2 isolation 1 worker 4.00 m2/h labor 0.75
SITE50 G.Site Backfilling with Compaction ‫االعمال الترابية للنموذج السكنى واالسوار‬ #DIV/0!
SITE60 Fence Block Work ( Includding Parapet Beam ) ‫اعمال الهيكل االنشائى والمبانى‬ 1,725.00 Nos. Blocks 1M+1H 25.00 Nos./h labor 8.63
.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.1.3 Finish Work #DIV/0!
SITE70 Fence Perparation & Base layer for Plastering Work ‫اعمال الموقع العام والخزانات واالسوار‬ 335.92 m2 plastring 1M+1H 2.50 m2/h labor 16.80
SITE80 Fence Plastering Work ‫اعمال الموقع العام والخزانات واالسوار‬ 335.92 m2 plastring 1M+1H 2.50 m2/h labor 16.80
SITE90 Fence Perparation & Texture Layer for EX. Painting Work ‫اعمال الموقع العام والخزانات واالسوار‬ 335.92 m2 Painting painter 18.75 m2/h labor 2.24
SITE100 Finish Work for G.Site (Parking,Con.Tiles,..... ) ‫اعمال الموقع العام والخزانات واالسوار‬ #DIV/0!
SITE110 Fence Painting 1st Coat ‫اعمال الموقع العام والخزانات واالسوار‬ 335.92 m2 Painting painter 18.75 m2/h labor 2.24
SITE120 Fence Painting Final Coat ‫اعمال الموقع العام والخزانات واالسوار‬ 335.92 m2 Painting painter 18.75 m2/h labor 2.24
O.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.1.2 MEP Work #DIV/0!
SITE130 Water supply & Sewage Networks ‫االعمال الميكانيكية‬ #DIV/0!
SITE140 Fence&G.Site 1st. fix Electrical Work"Piping,Wiring,Cables,Manhole,.." ‫االعمال الكهربائية‬ #DIV/0!
SITE150 Electrical Installation for G.SITE & FENCE (Meter,Lighting,Outlet,...) ‫االعمال الكهربائية‬ #DIV/0!
SITE160 Pump & Main Water Supply Network Connection ‫االعمال الميكانيكية‬ #DIV/0!
R-1.CONS..RAE WRK.ZN.A.A#A1.No.334.2 STRUCTURE WORK #DIV/0!
R-1.CONS..RAE WRK.ZN.A.A#A1.No.334.2.1 SUB STRUCTURE #DIV/0!
STR.10 P.C. Footing Work ‫اعمال االساسات للنموذج السكنى واالسوار‬ 9.60 m3 concrete 1 Carpenter + 1 worker 0.81 m3/h labor 1.48
31.86 m3 concrete 1 Carpenter + 1 worker 0.65 m3/h labor 6.13
STR.20 R.C. Footing Work ‫اعمال االساسات للنموذج السكنى واالسوار‬
6.30 Ton steel 1Steel fixer + 1 worker 62.50 kg/h labor 12.61
2.55 m3 concrete 1 Carpenter + 1 worker 0.25 m3/h labor 1.28
STR.30 Col. Neck's Work ‫اعمال االساسات للنموذج السكنى واالسوار‬ 0.66 Ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 1.65
31.10 m2 isolation 1 worker 12.50 m2/h labor 0.31
STR.40 Foundation Isolation Work ‫اعمال االساسات للنموذج السكنى واالسوار‬ 238.49 m2 bitumin 1 worker 12.50 m2/h labor 2.38
STR.50 Backfilling between Foundation with Compaction Work ‫االعمال الترابية للنموذج السكنى واالسوار‬ 660.00 m3 fill compactor 20.00 m3/h non labor 4.13
21.54 m3 concrete 1 Carpenter + 1 worker 0.81 m3/h labor 3.32
STR.60 Ground Beam Work including MEP Work ‫اعمال االساسات للنموذج السكنى واالسوار‬
2.50 Ton steel 1Steel fixer + 1 worker 37.50 kg/h labor 8.33
STR.70 Ground beam Isolation Work ‫اعمال االساسات للنموذج السكنى واالسوار‬ 75.85 m2 bitumin 1 worker 12.50 m2/h labor 0.76
STR.80 Backfilling between Ground Beam with Compaction Work ‫االعمال الترابية للنموذج السكنى واالسوار‬ m3 fill compactor 20.00 m3/h non labor 0.00
12.37 m3 concrete 1carpenter + 1 worker 2.50 m3/h labor 0.62
STR.90 Slab on grade Work ‫اعمال االساسات للنموذج السكنى واالسوار‬
1.64 ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 4.10
E WRK.ZN.A.A#A1.No.334.2.2 SUPER STRUCTURE "includding MEP Work " #DIV/0!
1.CONS..RAE WRK.ZN.A.A#A1.No.334.2.2.11 G.F. STRUCTURE #REF! #DIV/0!
8.40 m3 concrete 1 Carpenter + 1 worker 0.31 m3/h labor 3.36
STR.100 G.F. Columns Work ‫اعمال الهيكل االنشائى والمبانى‬
2.21 ton steel 1Steel fixer + 1 worker 43.75 kg/h labor 6.31
27.98 m3 concrete 1 Carpenter + 1 worker 0.75 m3/h labor 4.66
STR.110 G.F. Slab & Beams Work ‫اعمال الهيكل االنشائى والمبانى‬
4.24 ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 10.59
-1.CONS..RAE WRK.ZN.A.A#A1.No.334.2.2.2 F.F. STRUCTURE #DIV/0!
9.07 m3 concrete 1 Carpenter + 1 worker 0.31 m3/h labor 3.63
STR.120 F.F. Columns Work ‫اعمال الهيكل االنشائى والمبانى‬
2.21 ton steel 1Steel fixer + 1 worker 43.75 kg/h labor 6.31
29.98 m3 concrete 1 Carpenter + 1 worker 0.75 m3/h labor 5.00
STR.130 F.F. Slab & Beams Work ‫اعمال الهيكل االنشائى والمبانى‬
4.59 ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 11.46
-1.CONS..RAE WRK.ZN.A.A#A1.No.334.2.2.3 R.F. STRUCTURE #DIV/0!
1.29 m3 concrete 1 Carpenter + 1 worker 0.31 m3/h labor 0.52
STR.140 R.F. Columns & Col. Neck's for F.F. Roof Parapet ‫اعمال الهيكل االنشائى والمبانى‬
0.60 ton steel 1Steel fixer + 1 worker 43.75 kg/h labor 1.71
3.20 m3 concrete 1 Carpenter + 1 worker 0.75 m3/h labor 0.53
STR.150 R.F. Slab & Beams Work ‫اعمال الهيكل االنشائى والمبانى‬
0.90 ton steel 1Steel fixer + 1 worker 50.00 kg/h labor 2.25
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
‫قيم انجاز االعمال النشطة الوحدة السكنية‬
Activity ID Activity Name
Budgeted ‫مرحلة االعمال طبقا لجدول صرف قيمة االعمال‬ Qty unit description M.P rate Equip. total no. of
Total Cost working hour

PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.3 FINISHES WORK #DIV/0!


1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.1 INTERNAL FINISHES #DIV/0!
R-1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.1.1 G.F. FINISHES #DIV/0!
FIN10 G.F. EX. & IN. Block Work ‫اعمال الهيكل االنشائى والمبانى‬ 3,306.88 Nos. Blocks 1M+1H 25.00 Nos./h labor 16.53
FIN20 G.F. Perparation & Base layer for Plastering Work ‫اعمال التشطيبات المعمارية‬ 441.88 m2 plastring 1M+1H 2.50 m2/h labor 22.09
FIN30 G.F. Plastering Walls & Slab Work ‫اعمال التشطيبات المعمارية‬ 441.88 m2 plastring 1M+1H 2.50 m2/h labor 22.09
FIN40 G.F. Water Proofing for wet area Work ‫اعمال التشطيبات المعمارية‬ 31.04 m2 isolation 1 worker 4.00 m2/h labor 0.97
FIN60 G.F. Ceramic Tiles for walls Work ‫اعمال التشطيبات المعمارية‬ 46.70 m2 Ceramic 300*600 ceramic masion 2.50 m2/h labor 2.34
FIN50 G.F. Perparation & Putty Layer for Painting Work ‫اعمال التشطيبات المعمارية‬ 441.88 m2 Painting painter 18.75 m2/h labor 2.95
96.99 m2 Ceramic 1 400*400*6mm ceramic masion 2.50 m2/h labor 4.85
FIN70 G.F. All Flooring Tiles Type's Work ‫اعمال التشطيبات المعمارية‬
25.88 m2 Ceramic3 200*200*6mm ceramic masion 1.50 m2/h labor 2.16
13.38 m2 Giranet 300*300*2 giranet masion 1.50 m2/h labor 1.12
136.00 m Giranet 300*300*2 giranet masion 5.00 m/h labor 3.40

FIN80 In.& Ex. Granite Flooring for Stairs&Entrances - All Floors ‫اعمال التشطيبات المعمارية‬ 74.50 m2 Giranet 300*300*2 giranet masion 1.50 m2/h labor 6.21

191.80 m ‫ وزر سيراميك‬C1 6mm 1M+1H 5.00 m/h labor 4.80


FIN90 G.F. Painting 1st Coat walls&Slabs Work ‫اعمال التشطيبات المعمارية‬ 441.88 m2 Painting painter 18.75 m2/h labor 2.95
FIN100 G.F. Painting Final Coat walls&Slabs Work ‫اعمال التشطيبات المعمارية‬ 441.88 m2 Painting painter 18.75 m2/h labor 2.95
R-1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.1.4 F.F. FINISHES #DIV/0!
FIN11 F.F. EX. & IN. Block Work ‫اعمال الهيكل االنشائى والمبانى‬ 3,725.00 Nos. Blocks 1M+1H 25.00 Nos./h labor 18.63
FIN21 F.F. Perparation & Base layer for Plastering Work ‫اعمال التشطيبات المعمارية‬ 442.04 m2 plastring 1M+1H 2.50 m2/h labor 22.10
FIN31 F.F. Plastering Walls & Slab Work ‫اعمال التشطيبات المعمارية‬ 442.04 m2 plastring 1M+1H 2.50 m2/h labor 22.10
FIN41 F.F. Water Proofing for wet area Work ‫اعمال التشطيبات المعمارية‬ 31.04 m2 isolation 1 worker 4.00 m2/h labor 0.97
96.99 m2 Ceramic 1 400*400*6mm ceramic masion 2.50 m2/h labor 4.85
FIN71 F.F. All Flooring Tiles Type's Work ‫اعمال التشطيبات المعمارية‬ 25.88 m2 Ceramic 3 200*200*6mm ceramic masion 1.50 m2/h labor 2.16
5.47 m2 Giranet 300*300*3 giranet masion 1.50 m2/h labor 0.46
FIN61 F.F. Perparation & Putty Layer for Painting Work ‫اعمال التشطيبات المعمارية‬ 442.04 m2 Painting painter 18.75 m2/h labor 2.95
FIN51 F.F. Ceramic Tiles for walls Work ‫اعمال التشطيبات المعمارية‬ 46.70 m2 Ceramic 300*600 ceramic masion 2.50 m2/h labor 2.34
FIN81 F.F. Painting 1st Coat walls&Slabs Work ‫اعمال التشطيبات المعمارية‬ 442.04 m2 Painting painter 18.75 m2/h labor 2.95
FIN91 F.F. Painting Final Coat walls&Slabs Work ‫اعمال التشطيبات المعمارية‬ 442.04 m2 Painting painter 18.75 m2/h labor 2.95
R-1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.1.5 R.F. FINISHES #DIV/0!
FIN1 R.F. Parapet Block Work ‫اعمال الهيكل االنشائى والمبانى‬ 780.75 Nos. Blocks 1M+1H 25.00 Nos./h labor 3.90
‫قيم انجاز االعمال النشطة الوحدة السكنية‬
Activity ID Activity Name
Budgeted ‫مرحلة االعمال طبقا لجدول صرف قيمة االعمال‬ Qty unit description M.P rate Equip. total no. of
Total Cost working hour

1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.2 EXTERNAL FINISHES #DIV/0!


FIN300 Scaffolding,Perparation & Base layer for EX. Plastering Work ‫اعمال التشطيبات المعمارية‬ 587.22 m2 plastring 1M+1H 2.25 m2/h labor 32.62
FIN310 EX. Plastering " includding Parapet wall " Work ‫اعمال التشطيبات المعمارية‬ 587.22 m2 plastring 1M+1H 2.25 m2/h labor 32.62
FIN320 Roof Flooring Work (Foamy Conc., Water Proof., Heat Proof., Gravel, Tiles,..) ‫اعمال التشطيبات المعمارية‬ 124.09 m2 isolation 1 worker 12.50 m2/h labor 1.24
FIN330 Perparation & Texture Layer for EX. Painting Work ‫اعمال التشطيبات المعمارية‬ 587.22 m2 painting painter 18.75 m2/h labor 3.91
FIN340 EX. Painting 1st Coat for V.Faces & Parapet ‫اعمال التشطيبات المعمارية‬ 587.22 m2 painting painter 18.75 m2/h labor 3.91
FIN350 EX. Painting Final Coat for V.Faces & Parapet ‫اعمال التشطيبات المعمارية‬ 587.22 m2 painting painter 18.75 m2/h labor 3.91
PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.3.3 METAL WORKS
FIN360 Installing Metal Doors - All Floors ‫اعمال التشطيبات المعمارية‬ 8.00 Nos
FIN370 Installing Aluminum Windows - All Floors ‫اعمال التشطيبات المعمارية‬ 24.00 Nos
FIN380 Installing Wooden Doors - All Floors ‫اعمال التشطيبات المعمارية‬ 21.00 Nos
FIN390 Installing Handrails,Stairs & Any other metal works - All Floors ‫اعمال التشطيبات المعمارية‬ 14.23 m
O.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.4 MEP WORK
HO.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.4.4 MECH.
MEP10 G.F.1st fix Plumping & AC "Piping,Fittings,Valves,....." ‫االعمال الميكانيكية‬
MEP20 F.F. 1st fix Plumping & AC "Piping,Fittings,Valves,....." ‫االعمال الميكانيكية‬

MEP40 Fit and Connect Saintary ware - All Floors ‫االعمال الميكانيكية‬
HO.PR-1.CONS..RAE WRK.ZN.A.A#A1.No.334.4.5 ELE.
MEP50 G.F. 1st. fix Electrical Work "Piping,Boxes,......" ‫االعمال الكهربائية‬
MEP60 F.F. 1st. fix Electrical Work "Piping,Boxes,......" ‫االعمال الكهربائية‬

MEP80 2nd fix Electrical Work "Wiring, Cabels,Panalboards,......"- All Floors ‫االعمال الكهربائية‬
MEP90 3rd.fix Electrical Devices Installation - All Floors ‫االعمال الكهربائية‬
CONS..RAE WRK.ZN.A.A#A1.No.334.5 TESTING & COMMISSION
TEST10 TESTING & COMMISSION FOR Building ‫التسليم وانهاء المالحظات‬